Skip to content
PlanIndex Get alerts
Menu

Planning application

27 King Street Oldham OL8 1DP

Granted Oldham PA/344282/19 Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use of basement and ground floor from public house (Class A4) to restaurant (Class A3) and change of use of first and second floors from residential (Class C3) to sui generis house in multiple occupation (HMO) comprising 7 bed units.

As published by the council, reference PA/344282/19

Application record

Reference
PA/344282/19
Type
Full Application
Status
Decided
Decision
Granted
Received
16 Dec 2019
Validated
16 Dec 2019
Decided
8 Jun 2020
Ward
Coldhurst
Decision by
Development Control Delegation
Postcode
OL8 1DP

Timeline

Dates from the published record

  1. 16 Dec 2019

    Received by Oldham

  2. 8 Jun 2020

    Decision issued: Granted

  3. 23 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Oldham

83 applications on PlanIndex · across 9 councils · 90% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Oldham

  • FUL/354250/25 Granted

    Street Bridge Inn 230 Roman Road Oldham OL8 3QH

    First and second floor extension to existing building and a three storey side extension in addition to front canopy and alteration extension to existing car park to form motel addition to existing Public House.

    24 Mar 2025 Full applications
  • FUL/355703/26 Refused

    45 - 49 Ripponden Road Oldham OL1 4EW

    1) Conversion of lower ground (storage) and ground floors into Class E (office). 2) Alterations to existing store frontages. 3) Conversion of first floor (residential) into a 5 bed house in multiple occupation. 4) New rear access staircase.

    12 Feb 2026 Full applications
  • FUL/355368/25 Refused

    74 Haigh Lane Chadderton Oldham OL1 2TL

    Change of use from Residential (C3) to 5 bed House in Multiple Occupancy (C4)

    25 Nov 2025 Full applications
  • FUL/355457/25 Granted

    St Pauls Conservative Club Hollins Road Oldham OL8 3EA

    Detached commercial garage and parking area

    17 Dec 2025 Full applications
  • FUL/355967/26 Granted

    62 Marlborough Drive Failsworth Oldham M35 0LE

    Change of use of existing single dwelling in to two self contained flats with a two storey side extension providing access for the first floor flat.

    31 Mar 2026 Full applications