Planning application
Land At Snipe Clough Oldham
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Hybrid planning application seeking full/part outline consent comprising: (a) Full application for the erection of a visitor centre, events building with meeting pods, learning centre, forestry depot, ground mounted solar PV array and associated works, relocation of football pitch provision, necessary infrastructure, hard and soft landscaping, site wide vehicular, cycle parking and pedestrian improvements, including car park on Nether Hey Street. (b) Outline application (all matters reserved except for access) for a community growing allotment, and swimming pond.
As published by the council, reference FUL/348898/22
Application record
- Reference
- FUL/348898/22
- Type
- Full Application
- Status
- Decided
- Decision
- Granted
- Received
- 13 Apr 2022
- Validated
- 13 Apr 2022
- Decided
- 13 Oct 2022
- Ward
- Alexandra
- Decision by
- Planning Committee
Site history
Applications at this address on the Oldham register
This site has had 4 applications since 2022: 1 approved, 0 refused.
-
BNG/352515/26 Awaiting decision
Land At Snipe Clough Oldham
Submission of Biodiversity Gain Plan associated with application FUL/352515/24
-
CND/356394/26 Awaiting decision
Land At Snipe Clough Oldham
Discharge of Conditions 4 (car parking and access), 6 (refuse facilities), 9 (sustainable drainage management plan), and 13 (landscaping scheme timetable) and 17 (highway improvement scheme) relating to application FUL/352515/24
-
FUL/356012/26 Awaiting decision
Land At Snipe Clough, Oldham
Full application for importation of soils and associated works
Timeline
Dates from the published record
-
13 Apr 2022
Received by Oldham
-
13 Oct 2022
Decision issued: Granted
-
21 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Buildingcontrol: 24/042947/OTHFP (Building Work Complete)
Who's behind it
Company information only, from the register and Companies House
Arup Agent, registered in London
Active · incorporated 1990 · London
254 applications on PlanIndex · across 56 councils · 99% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
132 documents on file for this application
- COMMITTEE REPORT (12TH OCTOBER 2022)
- DLHC NON-INTERVENTION LETTER
- DECISION NOTICE
- DEVELOPMENT BOUNDARIES
- NETHER HEY PARKING PROPOSED SITE PLAN
- APPLICATION FORM
- ECOLOGICAL ASSESSMENT
- AIR QUALITY ASSESSMENT
- ARCHAEOLOGICAL DESK-BASED ASSESSMENT
- CRIME IMPACT ASSESSMENT
- DESIGN AND ACCESS STATEMENT
- DRAINAGE STRATEGY - LEARNING CENTRE
- DRAINAGE STRATEGY - VISITOR CENTRE, EVENTS BUILDING + FORESTRY
- ENERGY STATEMENT
- FLOOD RISK ASSESSMENT - LEARNING CENTRE
- FLOOD RISK ASSESSMENT - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT
- GREEN BELT VERY SPECIAL CIRCUMSTANCES CASE
- LANDSCAPE VISUAL IMPACT ASSESSMENT TECHNICAL NOTE
- LIGHTING IMPACT ASSESSMENT
- NOISE IMPACT ASSESSMENT
- PHASE 1 GI - LEARNING CENTRE PART 1 OF 7
- PHASE 1 GI - LEARNING CENTRE PART 2 OF 7
- PHASE 1 GI - LEARNING CENTRE PART 3 OF 7
- PHASE 1 GI - LEARNING CENTRE PART 4 OF 7
- PHASE 1 GI - LEARNING CENTRE PART 5 OF 7
- PHASE 1 GI - LEARNING CENTRE PART 6 OF 7
- PHASE 1 GI - LEARNING CENTRE PART 7 OF 7
- PHASE 1 GI - SOLAR ARRAY PART 1 OF 7
- PHASE 1 GI - SOLAR ARRAY PART 2 OF 7
- PHASE 1 GI - SOLAR ARRAY PART 3 OF 7
- PHASE 1 GI - SOLAR ARRAY PART 4 OF 7
- PHASE 1 GI - SOLAR ARRAY PART 5 OF 7
- PHASE 1 GI - SOLAR ARRAY PART 6 OF 7
- PHASE 1 GI - SOLAR ARRAY PART 7 OF 7
- PHASE 1 GI - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT PART 1 OF 7
- PHASE 1 GI - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT PART 2 OF 7
- PHASE 1 GI - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT PART 3 OF 7
- PHASE 1 GI - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT PART 4 OF 7
- PHASE 1 GI - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT PART 5 OF 7
- PHASE 1 GI - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT PART 6 OF 7
- PHASE 1 GI - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT PART 7 OF 7
- PLANNING STATEMENT
- SOLAR ARRAY DESIGN AND ACCESS STATEMENT
- SOLAR ARRAY GLINT & GLARE NOTE
- SOLAR ARRAY OUTLINE TRAFFIC AND TRANSPORT MANAGEMENT PLAN
- STATEMENT OF COMMUNITY INVOLVEMENT PART 1 OF 2
- STATEMENT OF COMMUNITY INVOLVEMENT PART 2 OF 2
- TRANSPORT ASSESSMENT PART 1 OF 4
- TRANSPORT ASSESSMENT PART 2 OF 4
- TRANSPORT ASSESSMENT PART 3 OF 4
- TRANSPORT ASSESSMENT PART 4 OF 4
- TRAVEL PLAN 1 OF 4
- TRAVEL PLAN PART 2 OF 4
- TRAVEL PLAN PART 3 OF 4
- TRAVEL PLAN PART 4 OF 4.
- UTILITIES STRATEGY
- LEARNING CENTRE EXISTING SITE PLAN
- LEARNING CENTRE AND PARKING PROPOSED SITE PLAN
- LEARNING CENTRE HARDWORKS GA
- LEARNING CENTRE SOFTWORKS GA AND
- LEARNING CENTRE LEVELS STRATEGY
- RECEPTION_REVP2
- OFFICE & BREAKOUT_REVP2
- CLASSROOM_REVP2
- BUNK HOUSE_REVP2
- LEARNING CENTRE PROPOSED SITE PLAN_REVP1
- VISITOR CENTRE SETTING
- LEARNING CENTRE FOUL WATER DRAINAGE STRATEGY
- LEARNING CENTRE - SUSTAINABLE URBAN DRAINAGE LAYOUT
- LEARNING CENTRE GREEN ROOFS VIEW
- LEARNING CENTRE OUTDOOR CLASSROOM VIEW
- NORTHERN ROOTS - VIEW 04 LEARNING CENTRE
- NETHER HEY PARKING - EXISTING SITE
- SUPERSEDED - NETHER HEY PARKING - LANDSCAPE GENERAL ARRANGEMENT
- INDICATIVE RE-PROVIDED FOOTBALL PITCHES PLAN
- SOLAR ARRAY EXISTING SITE PLAN
- SOLAR ARRAY PROPOSED SITE PLAN
- FIGURE 002 - ARRAY LAYOUT OVERVIEW.
- FIGURE 003 - ARRAY LAYOUT KEYPLAN
- FIGURE 003.1 - ARRAY LAYOUT DETAIL (1 OF 5)
- FIGURE 003.2 - ARRAY LAYOUT DETAIL (2 OF 5
- FIGURE 003.3 - ARRAY LAYOUT DETAIL (3 OF 5)
- FIGURE 003.4 - ARRAY LAYOUT DETAIL (4 OF 5)
- FIGURE 003.5 - ARRAY LAYOUT DETAIL (5 OF 5)
- FIGURE 004 - INDICATIVE SOLAR MODULE AND MOUNTING TABLE
- FIGURE 005 - INDICATIVE ELECTRICAL SWITCHROOM
- FIGURE 006 - TYPICAL SECURITY FENCE, GATE AND CAMERA
- FIGURE 007 - CABLE TRENCH CROSS SECTION
- FIGURE 008 - TYPICAL NEW TRACK CONSTRUCTION
- VISITOR CENTRE EXISTING SITE PLAN
- VISITOR CENTRE_ FORESTRY DEPOT AND PARKING GA
- VISITOR CENTRE HARDWORKS GA
- VISITOR CENTRE SOFTWORKS GA
- VISITOR CENTRE LEVELS STRATEGY
- VISITOR CENTRE INDICATIVE SECTIONS
- EVENTS SPACE
- MEETING POD
- PROPOSED FORESTRY DEPOT FACILITY PLAN
- PROPOSED WORKSHOP
- PROPOSED WORKSHOP OFFICE
- PROPOSED VISITOR CENTRE PLANS & SECTION
- PROPOSED VISITOR CENTRE SITE PLAN
- PROPOSED VISITOR CENTRE ELEVATIONS
- VISITOR CENTRE SETTING
- WC PLAN & ELEVATIONS
- FORESTRY DEPOT FOUL WATER DRAINAGE STRATEGY
- VISITOR CENTRE FOUL WATER DRAINAGE STRATEGY
- VISITOR CENTRE - SUSTAINABLE DRAINAGE LAYOUT
- VISITOR CENTRE AMPHITHEATRE VIEW
- VISITOR CENTRE BOARDWALK VIEW
- VISITOR CENTRE CAFE FRONTAGE VIEW - NIGHT
- VISITOR CENTRE CAFE FRONTAGE VIEW - NIGHT
- SWIMMING POND INDICATIVE PLAN AND SECTIONS
- THE LOCATION PLAN
- 2642-PLA-XX-XX-DR-L-0002-LAND OWNERSHIP PLAN
- MASTERPLAN EXISTING SITE
- MASTERPLAN GENERAL ARRANGEMENT
- MASTERPLAN WASTE MANAGEMENT STRATEGY
- MASTERPLAN EXISTING PROW AND CYCLE ACCESS ROUTES AND CONNECTIONS
- MASTERPLAN PROPOSED PEDESTRIAN AND CYCLE ACCESS ROUTES AND DIVERSIONS
- MASTERPLAN PROPOSED VEHICLE MOVEMENT AND ACCESS
- MASTERPLAN SITE WIDE PARKING PLAN
- MASTERPLAN PHASING PLAN
- MASTERPLAN SITE WIDE PHASING PLAN
- MASTERPLAN DETAILED AND HYBRID BOUNDARIES
- INDICATIVE RE-PROVIDED FOOTBALL PITCHES PLAN
- INDICATIVE MARKET GARDEN PLAN
- SWIMMING POND INDICATIVE PLAN AND SECTIONS
- INDICATIVE SIGNAGE AND WAYFINDING STRATEGY
- TYPICAL TREE PIT DETAILS
- TYPICAL PATH DETAILS
- NORTHERN ROOTS SITE WIDE PHASING PLAN
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Oldham granted permission on 13 October 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land Off Cherry Avenue And Snipe Clough Oldham OL8 2HS
Full planning application for the construction of a Bike Recreation Hub (Use Class F2(c)) consisting of 2 bike track areas and ancillary service area, hard and soft landscaping, new car park on Cherry Avenue and footpath diversions and improvements and vehicular access improvements.
Granted Full applications 72 docs -
Land Off Thatcher Street Hathershaw Oldham OL8 2JX
97% historically approved · decision due ~17 Apr
Discharge of conditions 5 (Waste Storage Facilities Provided) and 6 (Highways) associated with application FUL/347782/21.
Awaiting decision Conditions 9 docs -
15 Thatcher Street Oldham Oldham OL8 2JX
Prior approval for a larger home single storey rear extension measuring 5.0m in depth with a ridge height of 3.85m and eaves height of 2.80m
Granted Prior approval Extension Roofing 5 docsSmall domestic -
6 Thatcher Street Oldham OL8 2JX
1. Front and rear dormers with hip to gable roof alteration 2. Erection of a new detached garage.
Granted Loft or dormer 5 docs -
20 Burley Crescent Oldham OL8 2BL
Erection of a single storey rear extension.
Granted Householder Extension 7 docsSmall domestic -
Lowerfields Farm Warren Lane Oldham
The removal of 6no existing antennas and 20m monopole. Installation of 12no Antennas on new 20m monopole. ERS units to be located behind the antennas, 1no new 300mm Transmission Dish to be installed and 1no transmission dish to be relocated. Installation of 2no GPS modules and 2no cabinets within existing compound. Together with ancillary development required thereto to provide improved service for Cornerstone.
Decided Telecoms 5 docs
Other full applications
In Oldham
-
FUL/356768/26 Awaiting decision
364 Hollins Road Oldham OL8 3BE
Change of use from ground floor flat (C3) to educational support services and child day-care activities centre (Use Class F1).
-
FUL/356682/26 Awaiting decision
Chadderton A F C Ltd Andrew Street Chadderton Oldham OL9 0JT
Two storey side extension to existing clubhouse with entrance improvements.
-
FUL/355457/25 Granted
St Pauls Conservative Club Hollins Road Oldham OL8 3EA
Detached commercial garage and parking area
-
FUL/356663/26 Awaiting decision
Oaklands House Shaw Road Royton Oldham OL2 6DA
Change of use from care home (Use Class C2) to supported accommodation for adults (Sui generis).
-
FUL/355967/26 Granted
62 Marlborough Drive Failsworth Oldham M35 0LE
Change of use of existing single dwelling in to two self contained flats with a two storey side extension providing access for the first floor flat.