Granted Oldham FUL/348898/22 Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Hybrid planning application seeking full/part outline consent comprising: (a) Full application for the erection of a visitor centre, events building with meeting pods, learning centre, forestry depot, ground mounted solar PV array and associated works, relocation of football pitch provision, necessary infrastructure, hard and soft landscaping, site wide vehicular, cycle parking and pedestrian improvements, including car park on Nether Hey Street. (b) Outline application (all matters reserved except for access) for a community growing allotment, and swimming pond.

As published by the council, reference FUL/348898/22

Application record

Reference
FUL/348898/22
Type
Full Application
Status
Decided
Decision
Granted
Received
13 Apr 2022
Validated
13 Apr 2022
Decided
13 Oct 2022
Ward
Alexandra
Decision by
Planning Committee

Site history

Applications at this address on the Oldham register

This site has had 4 applications since 2022: 1 approved, 0 refused.

  • BNG/352515/26 Awaiting decision

    Land At Snipe Clough Oldham

    Submission of Biodiversity Gain Plan associated with application FUL/352515/24

    Submitted 10 Sep 2026
  • CND/356394/26 Awaiting decision

    Land At Snipe Clough Oldham

    Discharge of Conditions 4 (car parking and access), 6 (refuse facilities), 9 (sustainable drainage management plan), and 13 (landscaping scheme timetable) and 17 (highway improvement scheme) relating to application FUL/352515/24

    Submitted 15 Jun 2026
  • FUL/356012/26 Awaiting decision

    Land At Snipe Clough, Oldham

    Full application for importation of soils and associated works

    Submitted 10 Apr 2026

Timeline

Dates from the published record

  1. 13 Apr 2022

    Received by Oldham

  2. 13 Oct 2022

    Decision issued: Granted

  3. 21 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Buildingcontrol: 24/042947/OTHFP (Building Work Complete)

Who's behind it

Company information only, from the register and Companies House

Arup Agent, registered in London

Active · incorporated 1990 · London

254 applications on PlanIndex · across 56 councils · 99% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

132 documents on file for this application

  • COMMITTEE REPORT (12TH OCTOBER 2022) Committee Report · 04 Mar 2024
  • DLHC NON-INTERVENTION LETTER Correspondence · 02 Nov 2022
  • DECISION NOTICE Decision · 02 Nov 2022
  • DEVELOPMENT BOUNDARIES Amended Plans · 16 Aug 2022
  • NETHER HEY PARKING PROPOSED SITE PLAN Amended Plans · 20 Jun 2022
  • APPLICATION FORM Application Form · 21 Apr 2022
  • ECOLOGICAL ASSESSMENT Report · 20 Apr 2022
  • AIR QUALITY ASSESSMENT Air quality assessment · 14 Apr 2022
  • ARCHAEOLOGICAL DESK-BASED ASSESSMENT Report · 14 Apr 2022
  • CRIME IMPACT ASSESSMENT Report · 14 Apr 2022
  • DESIGN AND ACCESS STATEMENT Design and Access Statement · 14 Apr 2022
  • DRAINAGE STRATEGY - LEARNING CENTRE Report · 14 Apr 2022
  • DRAINAGE STRATEGY - VISITOR CENTRE, EVENTS BUILDING + FORESTRY Report · 14 Apr 2022
  • ENERGY STATEMENT Energy statement · 14 Apr 2022
  • FLOOD RISK ASSESSMENT - LEARNING CENTRE Flood consequences assessment · 14 Apr 2022
  • FLOOD RISK ASSESSMENT - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT Flood consequences assessment · 14 Apr 2022
  • GREEN BELT VERY SPECIAL CIRCUMSTANCES CASE Report · 14 Apr 2022
  • LANDSCAPE VISUAL IMPACT ASSESSMENT TECHNICAL NOTE Report · 14 Apr 2022
  • LIGHTING IMPACT ASSESSMENT Report · 14 Apr 2022
  • NOISE IMPACT ASSESSMENT Noise impact assessment · 14 Apr 2022
  • PHASE 1 GI - LEARNING CENTRE PART 1 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - LEARNING CENTRE PART 2 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - LEARNING CENTRE PART 3 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - LEARNING CENTRE PART 4 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - LEARNING CENTRE PART 5 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - LEARNING CENTRE PART 6 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - LEARNING CENTRE PART 7 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - SOLAR ARRAY PART 1 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - SOLAR ARRAY PART 2 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - SOLAR ARRAY PART 3 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - SOLAR ARRAY PART 4 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - SOLAR ARRAY PART 5 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - SOLAR ARRAY PART 6 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - SOLAR ARRAY PART 7 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT PART 1 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT PART 2 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT PART 3 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT PART 4 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT PART 5 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT PART 6 OF 7 Report · 14 Apr 2022
  • PHASE 1 GI - VISITOR CENTRE, EVENTS BUILDING + FORESTRY DEPOT PART 7 OF 7 Report · 14 Apr 2022
  • PLANNING STATEMENT Planning statement · 14 Apr 2022
  • SOLAR ARRAY DESIGN AND ACCESS STATEMENT Design and Access Statement · 14 Apr 2022
  • SOLAR ARRAY GLINT & GLARE NOTE Report · 14 Apr 2022
  • SOLAR ARRAY OUTLINE TRAFFIC AND TRANSPORT MANAGEMENT PLAN Transport assessment · 14 Apr 2022
  • STATEMENT OF COMMUNITY INVOLVEMENT PART 1 OF 2 Statement of community involvement · 14 Apr 2022
  • STATEMENT OF COMMUNITY INVOLVEMENT PART 2 OF 2 Statement of community involvement · 14 Apr 2022
  • TRANSPORT ASSESSMENT PART 1 OF 4 Transport assessment · 14 Apr 2022
  • TRANSPORT ASSESSMENT PART 2 OF 4 Transport assessment · 14 Apr 2022
  • TRANSPORT ASSESSMENT PART 3 OF 4 Transport assessment · 14 Apr 2022
  • TRANSPORT ASSESSMENT PART 4 OF 4 Transport assessment · 14 Apr 2022
  • TRAVEL PLAN 1 OF 4 Transport assessment · 14 Apr 2022
  • TRAVEL PLAN PART 2 OF 4 Transport assessment · 14 Apr 2022
  • TRAVEL PLAN PART 3 OF 4 Transport assessment · 14 Apr 2022
  • TRAVEL PLAN PART 4 OF 4. Transport assessment · 14 Apr 2022
  • UTILITIES STRATEGY Utilities statement · 14 Apr 2022
  • LEARNING CENTRE EXISTING SITE PLAN Site & other plans · 14 Apr 2022
  • LEARNING CENTRE AND PARKING PROPOSED SITE PLAN Site & other plans · 14 Apr 2022
  • LEARNING CENTRE HARDWORKS GA Site & other plans · 14 Apr 2022
  • LEARNING CENTRE SOFTWORKS GA AND Site & other plans · 14 Apr 2022
  • LEARNING CENTRE LEVELS STRATEGY Site & other plans · 14 Apr 2022
  • RECEPTION_REVP2 Site & other plans · 14 Apr 2022
  • OFFICE & BREAKOUT_REVP2 Site & other plans · 14 Apr 2022
  • CLASSROOM_REVP2 Site & other plans · 14 Apr 2022
  • BUNK HOUSE_REVP2 Site & other plans · 14 Apr 2022
  • LEARNING CENTRE PROPOSED SITE PLAN_REVP1 Site & other plans · 14 Apr 2022
  • VISITOR CENTRE SETTING Site & other plans · 14 Apr 2022
  • LEARNING CENTRE FOUL WATER DRAINAGE STRATEGY Site & other plans · 14 Apr 2022
  • LEARNING CENTRE - SUSTAINABLE URBAN DRAINAGE LAYOUT Site & other plans · 14 Apr 2022
  • LEARNING CENTRE GREEN ROOFS VIEW Photographs & photomontages · 14 Apr 2022
  • LEARNING CENTRE OUTDOOR CLASSROOM VIEW Photographs & photomontages · 14 Apr 2022
  • NORTHERN ROOTS - VIEW 04 LEARNING CENTRE Photographs & photomontages · 14 Apr 2022
  • NETHER HEY PARKING - EXISTING SITE Site & other plans · 14 Apr 2022
  • SUPERSEDED - NETHER HEY PARKING - LANDSCAPE GENERAL ARRANGEMENT Site & other plans · 14 Apr 2022
  • INDICATIVE RE-PROVIDED FOOTBALL PITCHES PLAN Site & other plans · 14 Apr 2022
  • SOLAR ARRAY EXISTING SITE PLAN Site & other plans · 14 Apr 2022
  • SOLAR ARRAY PROPOSED SITE PLAN Site & other plans · 14 Apr 2022
  • FIGURE 002 - ARRAY LAYOUT OVERVIEW. Site & other plans · 14 Apr 2022
  • FIGURE 003 - ARRAY LAYOUT KEYPLAN Site & other plans · 14 Apr 2022
  • FIGURE 003.1 - ARRAY LAYOUT DETAIL (1 OF 5) Site & other plans · 14 Apr 2022
  • FIGURE 003.2 - ARRAY LAYOUT DETAIL (2 OF 5 Site & other plans · 14 Apr 2022
  • FIGURE 003.3 - ARRAY LAYOUT DETAIL (3 OF 5) Site & other plans · 14 Apr 2022
  • FIGURE 003.4 - ARRAY LAYOUT DETAIL (4 OF 5) Site & other plans · 14 Apr 2022
  • FIGURE 003.5 - ARRAY LAYOUT DETAIL (5 OF 5) Site & other plans · 14 Apr 2022
  • FIGURE 004 - INDICATIVE SOLAR MODULE AND MOUNTING TABLE Site & other plans · 14 Apr 2022
  • FIGURE 005 - INDICATIVE ELECTRICAL SWITCHROOM Site & other plans · 14 Apr 2022
  • FIGURE 006 - TYPICAL SECURITY FENCE, GATE AND CAMERA Site & other plans · 14 Apr 2022
  • FIGURE 007 - CABLE TRENCH CROSS SECTION Site & other plans · 14 Apr 2022
  • FIGURE 008 - TYPICAL NEW TRACK CONSTRUCTION Site & other plans · 14 Apr 2022
  • VISITOR CENTRE EXISTING SITE PLAN Site & other plans · 14 Apr 2022
  • VISITOR CENTRE_ FORESTRY DEPOT AND PARKING GA Site & other plans · 14 Apr 2022
  • VISITOR CENTRE HARDWORKS GA Site & other plans · 14 Apr 2022
  • VISITOR CENTRE SOFTWORKS GA Site & other plans · 14 Apr 2022
  • VISITOR CENTRE LEVELS STRATEGY Site & other plans · 14 Apr 2022
  • VISITOR CENTRE INDICATIVE SECTIONS Site & other plans · 14 Apr 2022
  • EVENTS SPACE Site & other plans · 14 Apr 2022
  • MEETING POD Site & other plans · 14 Apr 2022
  • PROPOSED FORESTRY DEPOT FACILITY PLAN Site & other plans · 14 Apr 2022
  • PROPOSED WORKSHOP Site & other plans · 14 Apr 2022
  • PROPOSED WORKSHOP OFFICE Site & other plans · 14 Apr 2022
  • PROPOSED VISITOR CENTRE PLANS & SECTION Site & other plans · 14 Apr 2022
  • PROPOSED VISITOR CENTRE SITE PLAN Site & other plans · 14 Apr 2022
  • PROPOSED VISITOR CENTRE ELEVATIONS Site & other plans · 14 Apr 2022
  • VISITOR CENTRE SETTING Site & other plans · 14 Apr 2022
  • WC PLAN & ELEVATIONS Site & other plans · 14 Apr 2022
  • FORESTRY DEPOT FOUL WATER DRAINAGE STRATEGY Site & other plans · 14 Apr 2022
  • VISITOR CENTRE FOUL WATER DRAINAGE STRATEGY Site & other plans · 14 Apr 2022
  • VISITOR CENTRE - SUSTAINABLE DRAINAGE LAYOUT Site & other plans · 14 Apr 2022
  • VISITOR CENTRE AMPHITHEATRE VIEW Photographs & photomontages · 14 Apr 2022
  • VISITOR CENTRE BOARDWALK VIEW Photographs & photomontages · 14 Apr 2022
  • VISITOR CENTRE CAFE FRONTAGE VIEW - NIGHT Photographs & photomontages · 14 Apr 2022
  • VISITOR CENTRE CAFE FRONTAGE VIEW - NIGHT Photographs & photomontages · 14 Apr 2022
  • SWIMMING POND INDICATIVE PLAN AND SECTIONS Site & other plans · 14 Apr 2022
  • THE LOCATION PLAN The location plan · 14 Apr 2022
  • 2642-PLA-XX-XX-DR-L-0002-LAND OWNERSHIP PLAN Site & other plans · 14 Apr 2022
  • MASTERPLAN EXISTING SITE Site & other plans · 14 Apr 2022
  • MASTERPLAN GENERAL ARRANGEMENT Site & other plans · 14 Apr 2022
  • MASTERPLAN WASTE MANAGEMENT STRATEGY Site & other plans · 14 Apr 2022
  • MASTERPLAN EXISTING PROW AND CYCLE ACCESS ROUTES AND CONNECTIONS Site & other plans · 14 Apr 2022
  • MASTERPLAN PROPOSED PEDESTRIAN AND CYCLE ACCESS ROUTES AND DIVERSIONS Site & other plans · 14 Apr 2022
  • MASTERPLAN PROPOSED VEHICLE MOVEMENT AND ACCESS Site & other plans · 14 Apr 2022
  • MASTERPLAN SITE WIDE PARKING PLAN Site & other plans · 14 Apr 2022
  • MASTERPLAN PHASING PLAN Site & other plans · 14 Apr 2022
  • MASTERPLAN SITE WIDE PHASING PLAN Site & other plans · 14 Apr 2022
  • MASTERPLAN DETAILED AND HYBRID BOUNDARIES Site & other plans · 14 Apr 2022
  • INDICATIVE RE-PROVIDED FOOTBALL PITCHES PLAN Site & other plans · 14 Apr 2022
  • INDICATIVE MARKET GARDEN PLAN Site & other plans · 14 Apr 2022
  • SWIMMING POND INDICATIVE PLAN AND SECTIONS Site & other plans · 14 Apr 2022
  • INDICATIVE SIGNAGE AND WAYFINDING STRATEGY Site & other plans · 14 Apr 2022
  • TYPICAL TREE PIT DETAILS Site & other plans · 14 Apr 2022
  • TYPICAL PATH DETAILS Site & other plans · 14 Apr 2022
  • NORTHERN ROOTS SITE WIDE PHASING PLAN Site & other plans · 14 Apr 2022

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Oldham granted permission on 13 October 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land Off Cherry Avenue And Snipe Clough Oldham OL8 2HS

    FUL/348472/22 Submitted 9 Feb 2022 200 yards away

    Full planning application for the construction of a Bike Recreation Hub (Use Class F2(c)) consisting of 2 bike track areas and ancillary service area, hard and soft landscaping, new car park on Cherry Avenue and footpath diversions and improvements and vehicular access improvements.

    Granted Full applications 72 docs
  • Land Off Thatcher Street Hathershaw Oldham OL8 2JX

    CND/355687/26 Submitted 10 Feb 2026 300 yards away

    97% historically approved · decision due ~17 Apr

    Discharge of conditions 5 (Waste Storage Facilities Provided) and 6 (Highways) associated with application FUL/347782/21.

    Awaiting decision Conditions 9 docs
  • 15 Thatcher Street Oldham Oldham OL8 2JX

    PDE/345343/20 Submitted 17 Aug 2020 300 yards away

    Prior approval for a larger home single storey rear extension measuring 5.0m in depth with a ridge height of 3.85m and eaves height of 2.80m

    Granted Prior approval Extension Roofing 5 docs
    Small domestic
  • 6 Thatcher Street Oldham OL8 2JX

    HOU/356779/26 Submitted 4 Sep 2026 300 yards away

    1. Front and rear dormers with hip to gable roof alteration 2. Erection of a new detached garage.

    Granted Loft or dormer 5 docs
  • 20 Burley Crescent Oldham OL8 2BL

    HOU/353528/24 Submitted 7 Oct 2024 350 yards away

    Erection of a single storey rear extension.

    Granted Householder Extension 7 docs
    Small domestic
  • Lowerfields Farm Warren Lane Oldham

    TEN/347683/21 Submitted 6 Oct 2021 350 yards away

    The removal of 6no existing antennas and 20m monopole. Installation of 12no Antennas on new 20m monopole. ERS units to be located behind the antennas, 1no new 300mm Transmission Dish to be installed and 1no transmission dish to be relocated. Installation of 2no GPS modules and 2no cabinets within existing compound. Together with ancillary development required thereto to provide improved service for Cornerstone.

    Decided Telecoms 5 docs

In Oldham

  • FUL/356768/26 Awaiting decision

    364 Hollins Road Oldham OL8 3BE

    Change of use from ground floor flat (C3) to educational support services and child day-care activities centre (Use Class F1).

    Received 3 Sep, published by the council 2 Oct 2026 Full applications
  • FUL/356682/26 Awaiting decision

    Chadderton A F C Ltd Andrew Street Chadderton Oldham OL9 0JT

    Two storey side extension to existing clubhouse with entrance improvements.

    Received 12 Aug, published by the council 15 Sep 2026 Full applications
  • FUL/355457/25 Granted

    St Pauls Conservative Club Hollins Road Oldham OL8 3EA

    Detached commercial garage and parking area

    Received 17 Dec, published by the council 21 Jul 2026 Full applications
  • FUL/356663/26 Awaiting decision

    Oaklands House Shaw Road Royton Oldham OL2 6DA

    Change of use from care home (Use Class C2) to supported accommodation for adults (Sui generis).

    Received 10 Aug, published by the council 15 Sep 2026 Full applications
  • FUL/355967/26 Granted

    62 Marlborough Drive Failsworth Oldham M35 0LE

    Change of use of existing single dwelling in to two self contained flats with a two storey side extension providing access for the first floor flat.

    Received 31 Mar, published by the council 21 Jul 2026 Full applications