Planning application

Asda Supermarket Greenfield Lane Shaw Oldham OL2 8QP

Granted Oldham FUL/346035/21 Full Application

Works: Extension Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing Click and Collect facility. Erection of new 2no. bay Click and Collect canopy. Resurfacing of pavement to create level access into new single door. Extension of existing van canopy to match existing.

As published by the council, reference FUL/346035/21

Application record

Reference
FUL/346035/21
Type
Full Application
Status
Decided
Decision
Granted
Received
4 Jan 2021
Validated
4 Jan 2021
Decided
13 Apr 2021
Ward
Shaw
Parish
Shaw & Crompton Town Council
Decision by
Development Control Delegation
Postcode
OL2 8QP

Timeline

Dates from the published record

  1. 4 Jan 2021

    Received by Oldham

  2. 13 Apr 2021

    Decision issued: Granted

  3. 13 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

8 applications on PlanIndex · across 6 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Shaw Tyre And Exhaust Co Ltd Duke Street Shaw Oldham OL2 8PA

    TEN/348406/22 Submitted 31 Jan 2022 45m away

    Openreach intends to install fixed line broadband electronic communications apparatus

    Decided Telecoms 1 doc
  • Play House 2 2 Newtown Street Shaw Oldham OL2 8NX

    FUL/356581/26 Submitted 24 Jul 2026 68m away

    88% historically approved · decision due ~18 Sep

    1) Re-roofing of the pitched slate roof and reinstatement of the original hipped roof at the front of the building 2). Removal of the metal roof at the rear of the building and reinstatement of the flat roof concealed underneath

    Awaiting decision Roofing 5 docs
  • 6 Eastway Shaw Oldham OL2 8NY

    CND/356329/26 Submitted 3 Jun 2026 74m away

    88% historically approved · decision due ~29 Jul

    Discharge of conditions 7 (Cycle Store) and 8 (Soundproofing) associated with application FUL/353828/24

    Awaiting decision 4 docs
  • Dawson Precision Components Ltd Greenfield Lane Shaw OL2 8QP

    PA/343506/19 Submitted 18 Jun 2019 87m away

    Single storey extension to Greenfield Lane elevation, two storey & single storey extensions to Leach Street elevation, alterations to part of existing building including re-cladding, new reception entrance & extended car parking area

    Granted Full applications Extension 48 docs
    Small domestic
  • Front Of Duke Street Garage 1 Duke Street Shaw Oldham OL2 8PA

    TEN/348552/22 Submitted 18 Feb 2022 96m away

    Install 1 x 10m wooden pole

    Decided Telecoms 1 doc
  • 31 Market Street Shaw Oldham OL2 8NR

    FUL/356486/26 Submitted 2 Jul 2026 98m away

    88% historically approved · decision due ~27 Aug

    1) New door opening and replacement of separate door opening with new window to ground floor gable elevation. 2) Two new window openings on ground floor rear elevation. 3) Rooflight to the rear elevation

    Awaiting decision Loft or dormer Windows or glazing 9 docs

In Oldham

  • FUL/354250/25 Granted

    Street Bridge Inn 230 Roman Road Oldham OL8 3QH

    First and second floor extension to existing building and a three storey side extension in addition to front canopy and alteration extension to existing car park to form motel addition to existing Public House.

    24 Mar 2025 Full applications
  • FUL/355703/26 Refused

    45 - 49 Ripponden Road Oldham OL1 4EW

    1) Conversion of lower ground (storage) and ground floors into Class E (office). 2) Alterations to existing store frontages. 3) Conversion of first floor (residential) into a 5 bed house in multiple occupation. 4) New rear access staircase.

    12 Feb 2026 Full applications
  • FUL/355368/25 Refused

    74 Haigh Lane Chadderton Oldham OL1 2TL

    Change of use from Residential (C3) to 5 bed House in Multiple Occupancy (C4)

    25 Nov 2025 Full applications
  • FUL/355457/25 Granted

    St Pauls Conservative Club Hollins Road Oldham OL8 3EA

    Detached commercial garage and parking area

    17 Dec 2025 Full applications
  • FUL/355967/26 Granted

    62 Marlborough Drive Failsworth Oldham M35 0LE

    Change of use of existing single dwelling in to two self contained flats with a two storey side extension providing access for the first floor flat.

    31 Mar 2026 Full applications