Planning application
3 Montpelier Road Ealing W5 2QS
Works: Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alteration to the rear roof with provision of a rooflight to the rear roof slope (Lawful Development Certificate for a Proposed Development)
As published by the council, reference 244783CPL
Application record
- Reference
- 244783CPL
- Type
- Certificate of Lawfulness - Proposed
- Status
- Permitted Development
- Decision
- Granted As published: Permitted Development
- Received
- 16 Dec 2024
- Validated
- 16 Dec 2024
- Decided
- 10 Feb 2025
- Ward
- Ealing Broadway
- Decision by
- Delegated Decision
- Postcode
- W5 2QS
Site history
Applications at this address on the Old Oak and Park Royal Development Corporation register
This site has had 3 applications since 2023: 3 approved, 0 refused.
-
260235HH Granted
3 Montpelier Road Ealing W5 2QS
Single storey side extension; alterations to the existing two-storey rear extension; reinstatement and addition of timber sash windows and change to fenestration.
-
232007PTT Granted
3 Montpelier Road Ealing W5 2QS
TPO/1968/0140 G1 - 17 Lime trees, re-pollard to the most recent pollard points. There is approximately 1.0-1.5m of new growth that will be removed. They are overhanging the pavement and touching the structure behind.
Timeline
Dates from the published record
-
16 Dec 2024
Received by Old Oak and Park Royal Development Corporation
-
10 Feb 2025
Decision issued: Permitted Development
-
24 Nov 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
John Foat Architects Agent, an architecture practice registered in Brighton
Active · incorporated 2013 · Brighton
5 applications on PlanIndex · across 3 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
8 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Old Oak and Park Royal Development Corporation granted permission on 10 February 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
3 Montpelier Road Ealing W5 2QS
Single storey side extension; alterations to the existing two-storey rear extension; reinstatement and addition of timber sash windows and change to fenestration.
Small domestic -
3 Montpelier Road Ealing W5 2QS
Single storey side extension; alterations to the existing two-storey rear extension; reinstatement and addition of timber sash windows and change to fenestration.
Small domestic -
3 Montpelier Road Ealing W5 2QS
TPO/1968/0140 G1 - 17 Lime trees, re-pollard to the most recent pollard points. There is approximately 1.0-1.5m of new growth that will be removed. They are overhanging the pavement and touching the structure behind.
Granted Trees 5 docs -
St Peters Parish Church Mount Park Road Ealing W5 2RU
97% historically approved · decision due ~1 Jan
T1 - Dying Sycamore - Remove T2 - Horse Chestnut with Ganoderma at base - Reduce by 4 metres T3 - Robinia - Remove dead wood and reshape reminder including 3 metres height reduction. T4 - Purple leaf plum - Reduce by 3 metres.
Awaiting decision Trees 1 doc -
Flats 1 To 12 1 Montpelier Road Ealing W5 2QS
Existing use of third floor attic space from (Use class C3) into small House in Multiple Occupation (Use class C4); insertion of window into eastern flank wall
Refused Full applications Windows or glazing 20 docs -
Parkwood 73 - 75 Mount Park Road Ealing W5 2RU
TPO 815 - T1 Copper beech (Fagus sylvatica f. purpurea) - routine maintenance - reduce the tree's crown to its previously established reduction points, removing up to 2 metres growth from the east, south and west faces and up to 1 metre from the north face. TPO 815 - T2 Rowan (Sorbus aucuparia) - routine maintenance - reduce the tree's crown back to its previously established reduction points, removing up to 1.5 metres growth from all aspects. TPO 815 - T3 Lime (Tilia spp.) - routine maintenance - reduce the tree, crown to its previously established reduction points, removing up to 3 metres of growth from all aspects; clear any epicormic shoots from the stem up to the crown break at 5 metres height.
Granted Trees 3 docs
Other lawful development applications
In Old Oak and Park Royal Development Corporation
-
263531CPL Granted
49 Allenby Road Southall UB1 2EY
Rear roof extension, and installation of three roof lights to front roofslope (Lawful Development Certificate for a Proposed Development)
-
262691CPE Refused
101 Costons Lane Greenford UB6 8RR
Continued use of the property as an 8-bedroom large House in Multiple Occupation (HMO) (Sui Generis) (Lawful Development Certificate for Existing Use)
-
263374CPL Refused
51 Priory Road Chiswick W4 5JA
Extension to roof of rear outrigger (Lawful Development Certificate for a Proposed Development)
-
263603CPL Granted
4 Teignmouth Gardens Perivale UB6 8BX
Alteration of roof from hip to gable end; rear roof extension and installation of two roof lights to front roofslope (Lawful Development Certificate for a Proposed Development)
-
263419CPL Refused
8 Brindley Way Southall UB1 3JN
Single storey side extension; Alteration of roof from hip to gable end; rear roof extension; installation of three rooflights to front roofslope (Lawful Development Certificate for a Proposed Development)