Planning application
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Works: New dwelling
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
As published by the council, reference 241706OUTR3
Application record
- Reference
- 241706OUTR3
- Type
- Outline Application Reg 3
- Status
- Granted with S106 conditions
- Decision
- Granted As published: Grant with S106 Obligations
- Received
- 26 Apr 2024
- Validated
- 16 May 2024
- Decided
- 21 Mar 2025
- Ward
- Pitshanger
- Decision by
- Committee Decision
- Postcode
- W13 0AL
Site history
Applications at this address on the Old Oak and Park Royal Development Corporation register
This site has had 12 applications since 2024: 6 approved, 0 refused.
-
263249CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of a Biodiversity Gain Plan phase 1 pursuant to condition 10 of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
262136CND Granted
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of Full Fibre Connectivity Infrastructure part pursuant to Condition 25 (Part Discharge - Phase 1 only); of planning permission ref: 241706OUTR3 dated 21.03.2025 (Regulation 3 Application by London Borough of Ealing)
-
262143CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of Construction Management Plan part pursuant to Condition 19 (Part Discharge - Phase 1 only); of planning permission ref: 241706OUTR3 dated 21.03.2025 (Regulation 3 Application by London Borough of Ealing)
-
261856CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Submission of plant/ machinery/ equipment/ducting/air in- and outlets/ mechanical installations and their external rating noise level (LAr,Tr), together with mitigation measures as appropriate. The measures shall ensure that the emitted external rating noise level will be lower than the lowest existing background sound level LA90 by 10dBA at the most noise sensitive receiver locations at the development site and at surrounding premises in pursuant to condition 46 of planning permission ref: 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
261854CND Granted
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of air ventilation system (Ventilation Strategy Report) (part discharge - Phase 1) pursuant to condition 27 of planning permission 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space
-
261857CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of external artificial lighting pursuant to partially discharge condition 52 of planning permission ref: 241706OUTR3 (Phase 1) dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
261853CND Granted
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of Phasing Plan pursuant to partially discharge condition 5 of planning permission ref 241706OUTR3 (Phase 1) dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
261855CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of Air Quality and Dust Management Plan (AQDMP) pursuant to condition 28 of planning permission ref: 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.
-
261858CND Awaiting decision
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of piling method statement pursuant to condition 55 of planning permission ref: 241706OUTR3 dated 21.03.2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space
-
261518CND Granted
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of the Ground Remediation part pursuant to condition 43 (part discharge - Phase 1) of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.(Regulation 3 Application by London Borough of Ealing)
Timeline
Dates from the published record
-
26 Apr 2024
Received by Old Oak and Park Royal Development Corporation
-
16 May 2024
Validated
Checked as complete and ready for consideration.
-
21 Mar 2025
Decision issued: Grant with S106 Obligations
-
12 Oct 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Tibbalds Planning and Urban Design Ltd Agent, a planning consultancy registered in London
Active · incorporated 2003 · London
113 applications on PlanIndex · across 14 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
193 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Old Oak and Park Royal Development Corporation granted permission on 21 March 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Detailed Drainage Designs part pursuant to condition 56 (part discharge - Phase 1) of planning permission ref: 241706OUTR3, dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary). The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space. (Regulation 3 Application by London Borough of Ealing)
Granted Conditions New dwelling 12 docs -
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Detailed Drainage Designs part pursuant to condition 56 (part discharge - Phase 1) of planning permission ref: 241706OUTR3, dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary). The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space. (Regulation 3 Application by London Borough of Ealing)
Granted Conditions New dwelling 12 docs -
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of the Ground Remediation part pursuant to condition 43 (part discharge - Phase 1) of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.(Regulation 3 Application by London Borough of Ealing)
Granted Conditions New dwelling 23 docs -
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of the Ground Remediation part pursuant to condition 43 (part discharge - Phase 1) of planning permission ref: 241706OUTR3 dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.(Regulation 3 Application by London Borough of Ealing)
Granted Conditions New dwelling 23 docs -
Site Of Former Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Application for a Non-Material Amendment in (S96a) to planning permission 241706OUTR3 dated 21.03.2025 for 'Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space'. Amendment seeks permission for minor changes to Phase 1 of the permitted development (the leisure centre) including amendments to the proposed leisure centre facade and internal layout of the building, landscape amendments and a new external cycle store'. (Regulation 3 Application by London Borough of Ealing)
Granted New dwelling 30 docs -
Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL
Details of Full Fibre Connectivity Infrastructure part pursuant to Condition 25 (Part Discharge - Phase 1 only); of planning permission ref: 241706OUTR3 dated 21.03.2025 (Regulation 3 Application by London Borough of Ealing)
Granted
Other outline applications
In Old Oak and Park Royal Development Corporation
-
263623OPDCOB Awaiting decision
North Acton Square Victoria Road Acton W3 6UP
Installation of digital display in self supported structure over existing containers ( out of borough)
-
263686OPDCOB Awaiting decision
Energy Centre Building, Pipework (western Arm) Pipework (eastern Arm) 1 Minerva Road Park Royal NW10 6HJ
Partial details of part (i) of condition 7 (Construction Logistics Plans) and part (i) of condition 8 (Construction and Environmental Management Plans), in relation to the demolition and piling mat works at 1 Minerva Road only; Partial details of parts (ii) and (iii) of condition 7 (Construction Logistics Plans) and parts (ii) and (iii) of condition 8 (Construction and Environmental Management Plans), in relation to the installation of the buried pipework along Minerva Road and North Acton Road only; and Partial details of condition 11 (HS2 Safeguarding), in relation to 1 Minerva Road and works along Minerva Road and North Acton Road only; pursuant to planning permission reference 25/0184/FUMOPDC dated 25/03/2026, for 'Development associated with the Old Oak and Park Royal Energy Network (OPEN) district heating network, comprising: Demolition of a warehouse building at 1 Minerva Road, London, NW10 6HJ, and erection of a purposebuilt energy centre building; Laying of a network of underground heat pipes; Erection of a crossover gantry to carry the pipework over existing railway tracks, running parallel to the Park Royal Road Overbridge; and Other associated works.' (Out of Borough)
-
263227OPDCOB Refused
37 - 39 North Acton Road Park Royal NW10 6PF
Partial discharge of condition 4 (Noise Testing Results) pursuant to planning permission reference 22/0142/REMOPDC dated 25/01/2023 for 'Reserved Matters Application with full details of access, layout, scale, appearance and landscaping pursuant to outline planning permission reference 20/0122/OUTOPDC dated 27/09/2022 for a data centre (Use Class B8), generator building, plant, sub-station, hard and soft landscaping and associated works (out of borough)
-
263634CONS Awaiting decision
36 Old Oak Road London W3 7HQ
Erection of a single storey rear extension, to the side and rear of the existing back addition following the demolition of existing store room at the rear of the property (out of borough)
-
263459CONS Granted
Clayponds Open Space Clayponds Gardens London W5 4RQ
Replacement of ball court (MUGA) to a football foundation play zone, installation of new fencing, lighting and surface joint (Out of Borough)