Planning application

River Leen Between Rear Of 140 And Highbury Road Main Street Nottingham

Granted Nottingham 26/00288/PFUL3 Full planning application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Remediation works to embankment including stabilisation and protection alongside associated engineering works

As published by the council, reference 26/00288/PFUL3

Application record

Reference
26/00288/PFUL3
Type
Full planning application
Status
Decided
Decision
Grant conditional permission
Received
24 Feb 2026
Validated
5 Mar 2026
Decided
3 Jun 2026
Ward
Bulwell (May 2019)
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 24 Feb 2026

    Received by Nottingham

  2. 5 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 3 Jun 2026

    Decision issued: Grant conditional permission

  4. 25 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in London

260 applications on PlanIndex · across 52 councils · 91% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 16 Montague Street Nottingham Nottingham City NG6 8EU

    26/01172/PFUL3 Submitted 8 Jul 2026 71m away

    94% historically approved · decision due ~2 Sep

    Loft conversion and rear dormer, new side-facing window.

    Decided Loft or dormer Windows or glazing 4 docs
  • Argos Holborn Place Nottingham NG6 8FB

    22/00145/PWC Submitted 24 Jan 2022 87m away

    Cut back all overhanging and encroaching branches in neighbours properties. Reduce / pollard large Salix alba trees down to height of guttering Approx 2.1m on building . Prune back all large evergreen shrubs/hedges to height of boundary fence. Cut back all low growing vegetation, scrub, self-sets weed growth . Strim and tidy remaining grass area.

    Granted Trees 2 docs
    Small domestic
  • 68 Main Street Nottingham Nottingham City NG6 8EW

    23/00130/ADV2 Submitted 25 Jan 2023 93m away

    Signage.

    Granted Advertising 3 docs
  • Shell For 50A 50B And Flats At 50 Main Street Nottingham

    26/00399/PDS4 Submitted 12 Mar 2026 106m away

    Submission to discharge Condition 9 (verification of remediation strategy) and Condition 11 (verification of drainage system) of planning permission ref: 22/01605/PFUL3.

    Granted Conditions 5 docs
  • Site Of Warehouse And Land To Rear Of 50 Main Street Nottingham

    26/00398/PDS4 Submitted 12 Mar 2026 110m away

    Submission to discharge Condition 9 (verification of remediation strategy) and Condition 11 (verification of drainage system) of planning permission ref: 23/00672/PFUL3.

    Granted Conditions 6 docs
  • 50 Main Street Nottingham NG6 8EW

    21/02479/PDS4 Submitted 16 Nov 2021 123m away

    Details submitted to discharge condition 2,(noise and dust management plan), condition 3 (materials and large scale details), condition 4 (hard and soft landscaping), condition 5 (gated access), condition 6 (surface water drainage proposals) and condition 8 (bin and cycle storage). of planning permission reference 21/01166/PFUL3

    Granted Conditions 11 docs

In Nottingham

  • 26/00125/PFUL3 Withdrawn

    Five Acres Hempshill Lane Nottingham Nottingham City NG6 8PF

    Conversion of garage to granny room

    26 Jan 2026 Full applications
  • 26/00468/PFUL3 Granted

    126 Morley Avenue Nottingham Nottingham City NG3 5FW

    Conversion of 126 Morley Avenue to a three bedroom dwelling with one off road parking space

    25 Mar 2026 Full applications
  • 26/00124/PFUL3 Granted

    36 Jersey Gardens Nottingham Nottingham City NG3 2QP

    Garage conversion together with a single storey side and rear extension forming storage and home office accommodation

    26 Jan 2026 Full applications
  • 26/00612/PFUL3 Granted

    The Futurist Valley Road Nottingham Nottingham City NG5 1JE

    Change of use to B2 use (General Industrial) and MOT tests

    20 Apr 2026 Full applications
  • 26/00494/PFUL3 Granted

    31 Wollaton Hall Drive Nottingham Nottingham City NG8 1AF

    Two-storey extensions to the front, side, and rear, alterations to the roof including front and rear dormers, creation of first-floor front terrace above a single-storey projection, removal of chimney sticks and fenestration changes to all elevations.

    30 Mar 2026 Full applications