Planning application

South West Section Of Bulwell Academy Henry Mellish Site Highbury Road Nottingham

Granted Nottingham 25/00519/PDS4 Discharge of conditions

Works: Windows or glazing Trees

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details submitted to discharge conditions 2 (Noise Assessment), 3 (Construction traffic Management Plan), 4 (Materials), 5 (Construction Surface Water Management), 6 (Drainage Management Plan), 7 (Remediation Strategy), 8 (Tree Protection), 9 (window, door, bin and bicycle details) and 10 (Fox Den Method Statement) of planning permission reference 19/01270/PFUL3

As published by the council, reference 25/00519/PDS4

Application record

Reference
25/00519/PDS4
Type
Discharge of conditions
Status
Decided
Decision
Granted As published: Approve
Received
24 Mar 2025
Validated
28 Mar 2025
Decided
12 Aug 2025
Ward
Bulwell Forest (May 2019)
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 24 Mar 2025

    Received by Nottingham

  2. 28 Mar 2025

    Validated

    Checked as complete and ready for consideration.

  3. 12 Aug 2025

    Decision issued: Approve

  4. 25 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 19/01270/PFUL3 (Decided)

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

  • PDS4 Approve - Decision Decision Notice · 12 Aug 2025
  • ACOUSTIC MEMO Reports · 04 Apr 2025
  • HIGHLAND SLATE IMAGE Layout Plans & Elevations · 28 Mar 2025
  • BRICK PRODUCT IMAGE Layout Plans & Elevations · 28 Mar 2025
  • ACOUSTIC PERFORMANCE CERTIFICATES Reports · 24 Mar 2025
  • CONSTRUCTION TRAFFIC MANAGEMENT PLAN Reports · 24 Mar 2025
  • MATERIALS PLAN Layout Plans & Elevations · 24 Mar 2025
  • CONSTRUCTION SURFACE WATER MANAGEMENT PLAN Reports · 24 Mar 2025
  • SECTION 104 SURFACE WATER CATCHMENT AREAS Layout Plans & Elevations · 24 Mar 2025
  • EXTERNAL WORKS AND PRIVATE DRAINAGE PLAN Layout Plans & Elevations · 24 Mar 2025
  • SECTION 104 GENERAL ARRANGEMENT Layout Plans & Elevations · 24 Mar 2025
  • REMEDIATION METHOD STATEMENT Reports · 24 Mar 2025
  • TREE PROTECTION AND GROUND PROTECTION Reports · 24 Mar 2025
  • TREE PROTECTION PLAN Layout Plans & Elevations · 24 Mar 2025
  • HOUSE TYPE A: LONG SECTION Layout Plans & Elevations · 24 Mar 2025
  • HOUSE TYPE B: LONG SECTION Layout Plans & Elevations · 24 Mar 2025
  • HOUSE TYPE B: SHORT SECTION Layout Plans & Elevations · 24 Mar 2025
  • FOX EARTH REMOVAL METHOD STATEMENT Reports · 24 Mar 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Nottingham granted permission on 12 August 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Nottingham

  • 26/00801/PDS4 Granted

    Bilborough College College Way Strelley Nottinghamshire NG8 4DQ

    Details submitted to discharge conditions 3 (Biodiversity Gain Plan) and 4 (HMMP) of planning permission 25/02127/PFUL3.

    Received 14 May, published by the council 22 Jul 2026 Conditions
  • 26/00574/PDS4 Granted

    5-7 Roden Street Nottingham Nottingham City NG3 1JH

    Details submitted to discharge condition 2 (ecological enhancements) of planning permission 23/02035/PFUL3.

    Received 14 Apr, published by the council 22 Jul 2026 Conditions
  • 26/01491/PVAR3 Awaiting decision

    90 Leybourne Drive Nottingham Nottingham City NG5 5GP

    Variation of Condition S1 of permission ref. 26/00474/PFUL3 to allow minor amendments to the approved plans, comprising the extension of the first-floor accommodation to the rear to enlarge the existing bedroom.

    Received 21 Aug, published by the council 3 Sep 2026 Conditions
  • 26/01496/PDS4 Awaiting decision

    Southglade Primary School Beckhampton Road Nottingham Nottingham City NG5 5NE

    Details submitted to discharge condition 14 (drainage system verification report) of planning permission reference 23/01172/PFUL3

    Received 21 Aug, published by the council 25 Aug 2026 Conditions
  • 26/00121/PDS4 Granted

    Site Of Chronos Richardson Ltd Arnside Road Nottingham

    Details submitted to discharge conditions 2 (BNG Gain Plan), 3 (HMMP), 4 (remediation), 5 (surface water drainage during construction), 6 (noise and dust management), 7 (CTMP), 8 (materials), 9 (boundary treatments), 10 (renewables), 11 (cycle Storage), 12 (badgers), 13 (bats), 17 (landscaping), 18 (ecological enhancements), 21 (Air Quality), and 25 (piling) of planning permission 25/00059/PFUL3.

    Received 23 Jan, published by the council 22 Jul 2026 Conditions