Planning application
South West Section Of Bulwell Academy Henry Mellish Site Highbury Road Nottingham
Works: Windows or glazing Trees
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details submitted to discharge conditions 2 (Noise Assessment), 3 (Construction traffic Management Plan), 4 (Materials), 5 (Construction Surface Water Management), 6 (Drainage Management Plan), 7 (Remediation Strategy), 8 (Tree Protection), 9 (window, door, bin and bicycle details) and 10 (Fox Den Method Statement) of planning permission reference 19/01270/PFUL3
As published by the council, reference 25/00519/PDS4
Application record
- Reference
- 25/00519/PDS4
- Type
- Discharge of conditions
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 24 Mar 2025
- Validated
- 28 Mar 2025
- Decided
- 12 Aug 2025
- Ward
- Bulwell Forest (May 2019)
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
24 Mar 2025
Received by Nottingham
-
28 Mar 2025
Validated
Checked as complete and ready for consideration.
-
12 Aug 2025
Decision issued: Approve
-
25 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Application: 19/01270/PFUL3 (Decided)
Documents
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
- PDS4 Approve - Decision
- ACOUSTIC MEMO
- HIGHLAND SLATE IMAGE
- BRICK PRODUCT IMAGE
- ACOUSTIC PERFORMANCE CERTIFICATES
- CONSTRUCTION TRAFFIC MANAGEMENT PLAN
- MATERIALS PLAN
- CONSTRUCTION SURFACE WATER MANAGEMENT PLAN
- SECTION 104 SURFACE WATER CATCHMENT AREAS
- EXTERNAL WORKS AND PRIVATE DRAINAGE PLAN
- SECTION 104 GENERAL ARRANGEMENT
- REMEDIATION METHOD STATEMENT
- TREE PROTECTION AND GROUND PROTECTION
- TREE PROTECTION PLAN
- HOUSE TYPE A: LONG SECTION
- HOUSE TYPE B: LONG SECTION
- HOUSE TYPE B: SHORT SECTION
- FOX EARTH REMOVAL METHOD STATEMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Nottingham granted permission on 12 August 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In Nottingham
-
26/00801/PDS4 Granted
Bilborough College College Way Strelley Nottinghamshire NG8 4DQ
Details submitted to discharge conditions 3 (Biodiversity Gain Plan) and 4 (HMMP) of planning permission 25/02127/PFUL3.
-
26/00574/PDS4 Granted
5-7 Roden Street Nottingham Nottingham City NG3 1JH
Details submitted to discharge condition 2 (ecological enhancements) of planning permission 23/02035/PFUL3.
-
26/01491/PVAR3 Awaiting decision
90 Leybourne Drive Nottingham Nottingham City NG5 5GP
Variation of Condition S1 of permission ref. 26/00474/PFUL3 to allow minor amendments to the approved plans, comprising the extension of the first-floor accommodation to the rear to enlarge the existing bedroom.
-
26/01496/PDS4 Awaiting decision
Southglade Primary School Beckhampton Road Nottingham Nottingham City NG5 5NE
Details submitted to discharge condition 14 (drainage system verification report) of planning permission reference 23/01172/PFUL3
-
26/00121/PDS4 Granted
Site Of Chronos Richardson Ltd Arnside Road Nottingham
Details submitted to discharge conditions 2 (BNG Gain Plan), 3 (HMMP), 4 (remediation), 5 (surface water drainage during construction), 6 (noise and dust management), 7 (CTMP), 8 (materials), 9 (boundary treatments), 10 (renewables), 11 (cycle Storage), 12 (badgers), 13 (bats), 17 (landscaping), 18 (ecological enhancements), 21 (Air Quality), and 25 (piling) of planning permission 25/00059/PFUL3.