Skip to content
PlanIndex Get alerts
Menu

Planning application

Nottingham Girls Academy Robins Wood Road Nottingham Nottingham City NG8 3LD

Granted Nottingham 24/01533/PFUL3 Full planning application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

New single storey 4 classroom block providing focussed educational provision

As published by the council, reference 24/01533/PFUL3

Application record

Reference
24/01533/PFUL3
Type
Full planning application
Status
Decided
Decision
Grant conditional permission
Received
5 Sep 2024
Validated
11 Sep 2024
Decided
10 Dec 2024
Ward
Leen Valley (May 2019)
Decision by
Delegated Decision
Postcode
NG8 3LD

Timeline

Dates from the published record

  1. 5 Sep 2024

    Received by Nottingham

  2. 11 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 10 Dec 2024

    Decision issued: Grant conditional permission

  4. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 9 Eskdale Drive Nottingham Nottingham City NG8 5GZ

    24/01497/PFUL3 Submitted 3 Sep 2024 148m away

    CONSTRUCTION OF FIRST FLOOR SIDE EXTENSION

    Granted Full applications Extension 5 docs
  • 6 Eskdale Drive Nottingham Nottingham City NG8 5GZ

    23/00414/PTPO Submitted 8 Mar 2023 161m away

    Cherry T1 - Remove Tree is in very poor condition and has very limited future prospects. There are large primary exposed and girdled roots at the base of tree, and it is likely the tree has restricted rooting area. There are occasional bark wounds and several Ganoderma australe fungal brackets to the roots, indicating significant root decay. The tree is single stemmed and vertical. There are occasional pruning wounds, bark wounds and bleeds to the stem and several Ganoderma australe fungal brackets to the base of the stem indicating significant stem decay. The tree???s crown overhangs the residential property???s garden, driveway and outbuildings, and the adjacent road and roadside footpath. The tree???s western crown is in contact with the residential property. There is significant dieback in the crown, with lots of minor and moderate deadwood and snapouts and occasional major deadwood to the central and southern crown. There are historic pruning wounds with some dead stubs, with minor cavities and decay. It is not considered suitable to replant a replacement tree due to the limited space and restricted rooting area.

    Granted Trees 2 docs
  • 5 Eskdale Drive Nottingham NG8 5GZ

    21/00257/PFUL3 Submitted 4 Feb 2021 172m away

    Proposed two storey side and front extensions and conversion of garage to living space

    Granted Full applications Extension 9 docs
  • 2 Elmdale Gardens Nottingham Nottingham City NG8 3ED

    26/00953/PFUL3 Submitted 5 Jun 2026 174m away

    94% historically approved · decision due ~10 Aug

    Two storey and single storey rear/ side extension and front porch (adapted plans based on 25/02022/PFUL3)

    Decided Extension 3 docs
    Small domestic
  • 32 Prestwood Drive Nottingham Nottingham City NG8 3LY

    26/00328/PFUL3 Submitted 3 Mar 2026 178m away

    Part retrospective planning application for boundary fencing with panel and brick piers, and front sliding gate

    Granted Full applications 7 docs
  • Building 60 Nottingham Girls Academy Robins Wood Road Nottingham

    21/00906/PFUL3 Submitted 21 Apr 2021 186m away

    Upgrade of an existing telecoms base station comprising the replacement of a 21m lattice tower (top height of antennas 24.0m) with a 25m lattice tower (top height of antennas 25.0m) supporting 12 no. antennas and an open headframe, 3 no. dishes with, internal works to existing equipment room together with ancillary development thereto

    Granted Full applications 28 docs

In Nottingham

  • 26/00125/PFUL3 Withdrawn

    Five Acres Hempshill Lane Nottingham Nottingham City NG6 8PF

    Conversion of garage to granny room

    26 Jan 2026 Full applications
  • 26/00468/PFUL3 Granted

    126 Morley Avenue Nottingham Nottingham City NG3 5FW

    Conversion of 126 Morley Avenue to a three bedroom dwelling with one off road parking space

    25 Mar 2026 Full applications
  • 26/00124/PFUL3 Granted

    36 Jersey Gardens Nottingham Nottingham City NG3 2QP

    Garage conversion together with a single storey side and rear extension forming storage and home office accommodation

    26 Jan 2026 Full applications
  • 26/00612/PFUL3 Granted

    The Futurist Valley Road Nottingham Nottingham City NG5 1JE

    Change of use to B2 use (General Industrial) and MOT tests

    20 Apr 2026 Full applications
  • 26/00494/PFUL3 Granted

    31 Wollaton Hall Drive Nottingham Nottingham City NG8 1AF

    Two-storey extensions to the front, side, and rear, alterations to the roof including front and rear dormers, creation of first-floor front terrace above a single-storey projection, removal of chimney sticks and fenestration changes to all elevations.

    30 Mar 2026 Full applications