Planning application

Clifton Pastures Street Works Nottingham Road Clifton Nottingham

Granted Nottingham 23/00411/PAT Prior approval telecom code systems ops

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of a telecommunications base station comprising a 18m monopole, 3 no ground-based cabinets painted and associated ancillary development

As published by the council, reference 23/00411/PAT

Application record

Reference
23/00411/PAT
Type
Prior approval telecom code systems ops
Status
Decided
Decision
Prior approval not required
Received
8 Mar 2023
Validated
10 Mar 2023
Decided
4 May 2023
Ward
Clifton East (May 2019)
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 8 Mar 2023

    Received by Nottingham

  2. 10 Mar 2023

    Validated

    Checked as complete and ready for consideration.

  3. 4 May 2023

    Decision issued: Prior approval not required

  4. 4 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

In Nottingham

  • 26/00602/PAT Granted

    Lewis Industrial Estate Radford Road Nottingham

    Proposed installation of a 20m high street pole accommodating 6No antennas, 1No 0.3m transmission dish and ancillary equipment. The proposal also involves the installation of 3No equipment cabinets at ground level and ancillary development thereto.

    20 Apr 2026 Telecoms
  • 24/01914/PAT Granted

    Telecommunications Mast South Of 17 Glaisdale Drive East Nottingham

    Upgrading of existing 25m mast to 32.5m mast and associated ancillary development

    1 Nov 2024 Telecoms
  • 24/01819/PAT Granted

    Land West Of Queens Drive And East Of Blackburn Starling Gateside Road Nottingham

    The installation of a 20 metre monopole, accommodating 6no. antennas & 1no. microwave dish, the installation of 3no. equipment cabinets, along with ancillary works

    15 Oct 2024 Telecoms
  • 21/01534/PAT Decided

    Land At Ruddington Lane Nottingham

    Proposed 18.0m Phase 8 Monopole C/W wrapround Cabinet at base and associated ancillary works.

    12 Jul 2021 Telecoms
  • 23/00540/PAT Granted

    Land Adjacent To The Tuck And Tanner 6 Top Valley Way Nottingham NG5 9DD

    Proposed 5G telecoms installation: H3G 18m street pole and additional equipment cabinets.

    27 Mar 2023 Telecoms