Planning application

79 Maid Marian Way Nottingham Nottingham City NG1 6AE

Granted Nottingham 22/02235/LLIS1 Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

The proposal is to extend the railings at the rear of the church building to enclose the part of the churchyard.

As published by the council, reference 22/02235/LLIS1

Application record

Reference
22/02235/LLIS1
Type
Listed Building Consent
Status
Decided
Decision
Granted As published: Grant conditional consent
Received
14 Nov 2022
Validated
22 Nov 2022
Decided
8 Aug 2023
Ward
Castle (May 2019)
Decision by
Delegated Decision
Postcode
NG1 6AE

Site history

Applications at this address on the Nottingham register

This site has had 3 applications since 2022: 3 approved, 0 refused.

  • 25/00042/PDS4 Granted

    79 Maid Marian Way Nottingham Nottingham City NG1 6AE

    Discharge of Conditions 2 (Materials / Details / Cycle storage), 3 (Construction Management Plan), 4 (Archaeology IN PART), 5 (Bat Survey), 6 ( Arboriculture Method Statement) and 7 (surface water strategy) relating to Planning permission ref: 22/02392/PFUL3.

    Decided 19 Sep 2025 Conditions
  • 24/02221/PNMA Granted

    79 Maid Marian Way Nottingham Nottingham City NG1 6AE

    Amendment to planning permission reference 22/02392/PFUL3 comprising minor external alterations to footprint, building envelope and materials.

    Decided 22 Jan 2025 Amendments

Timeline

Dates from the published record

  1. 14 Nov 2022

    Received by Nottingham

  2. 22 Nov 2022

    Validated

    Checked as complete and ready for consideration.

  3. 8 Aug 2023

    Decision issued: Grant conditional consent

  4. 22 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Nottingham granted permission on 8 August 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 79 Maid Marian Way Nottingham Nottingham City NG1 6AE

    25/00042/PDS4 Submitted 13 Jan 2025 50 yards away

    Discharge of Conditions 2 (Materials / Details / Cycle storage), 3 (Construction Management Plan), 4 (Archaeology IN PART), 5 (Bat Survey), 6 ( Arboriculture Method Statement) and 7 (surface water strategy) relating to Planning permission ref: 22/02392/PFUL3.

    Granted Conditions 9 docs
  • 79 Maid Marian Way Nottingham NG1 6AE

    22/02392/PFUL3 Submitted 9 Dec 2022 50 yards away

    Demolitions, alterations and extensions to existing building to create new Church Centre

    Granted Full applications Extension 18 docs
  • 79 Maid Marian Way Nottingham Nottingham City NG1 6AE

    24/02221/PNMA Submitted 18 Dec 2024 50 yards away

    Amendment to planning permission reference 22/02392/PFUL3 comprising minor external alterations to footprint, building envelope and materials.

    Granted Amendments 22 docs
  • St Nicholas C Of E Church Castle Gate Nottingham NG1 7AR

    26/01746/PTPO Submitted 29 Sep 2026 50 yards away

    95% historically approved · decision due ~24 Nov

    T1- Lombardy Poplar (Populus nigra 'Italica') - Undertake hazard reduction pruning to remove the identified hanging/broken branch from the crown in the interests of public safety and appropriate tree management.

    Awaiting decision Trees
  • St Nicholas C Of E Church Castle Gate Nottingham NG1 7AR

    26/01381/PWC Submitted 29 Jul 2026 50 yards away

    Various necessary safety tree works. See supportive information.

    Granted Trees 1 doc
  • 33 Castle Gate Nottingham Nottingham City NG1 7AR

    23/00419/PFUL3 Submitted 9 Mar 2023 50 yards away

    Alterations and extensions following demolition of rear additions and use as Airbnb style short term or holiday lets

    Granted Full applications Extension Demolition 7 docs

In Nottingham

  • 26/01484/LLIS1 Awaiting decision

    Mia House 1 North Circus Street Nottingham Nottingham City NG1 5AE

    Replacement of roof tiles

    Received 20 Aug, published by the council 27 Aug 2026 Heritage and listed buildings
  • 26/01405/LLIS1 Awaiting decision

    19 Park Valley Nottingham Nottingham City NG7 1BS

    Listed Building Consent for the reconfiguration of basement and ground floor apartments, including the addition of an external door serving the basement apartment and the repositioning of the basement staircase.

    Received 6 Aug, published by the council 19 Aug 2026 Heritage and listed buildings
  • 26/01387/LLIS1 Awaiting decision

    Land South Of Station Street Station Street Nottingham

    Erection of a new residential development comprising of 1 and 2 bedroom apartments (Build-to-Rent) alongside associated landscaping, public realm improvements and site infrastructure.

    Received 5 Aug, published by the council 17 Aug 2026 Heritage and listed buildings
  • 26/01311/LLIS1 Awaiting decision

    12 Poultry Nottingham Nottingham City NG1 2HW

    9 No. Externally mounted spot light fittings uplighters, to be installed at first floor level to illuminate the elevations facing Poultry and Bridlesmith Gate

    Received 28 Jul, published by the council 21 Aug 2026 Heritage and listed buildings
  • 26/01286/LLIS1 Awaiting decision

    26-28 Market Street Nottingham Nottingham City NG1 6HW

    Listed Building Consent for signage, lighting and decoration and internal works.

    Received 23 Jul, published by the council 7 Aug 2026 Heritage and listed buildings