Planning application
25 Arlington House, The Mews House Lenton Avenue Nottingham Nottingham City NG7 1DX
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey side extension
As published by the council, reference 22/01391/PFUL3
Application record
- Reference
- 22/01391/PFUL3
- Type
- Full planning application
- Status
- Decided
- Decision
- Grant conditional permission
- Received
- 14 Jul 2022
- Validated
- 19 Jul 2022
- Decided
- 30 Jan 2023
- Ward
- Castle (May 2019)
- Decision by
- Delegated Decision
- Postcode
- NG7 1DX
Timeline
Dates from the published record
-
14 Jul 2022
Received by Nottingham
-
19 Jul 2022
Validated
Checked as complete and ready for consideration.
-
30 Jan 2023
Decision issued: Grant conditional permission
-
25 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
The Mews House 25 Lenton Avenue Nottingham NG7 1DX
1. One Victorian bell shaped holly tree to be 'topped' 2. Remove one branch of ceanothus overhanging the road 3. Trim holly hedge (south border of garden) 4. Remove one dead cherry tree
Granted Trees 1 doc -
Yeomans Court Clumber Road West Nottingham NG7 1EU
T1- Yew: Trim the side branches to clear the path and reduce the height to 2.5m T2- Beech Tree: Check and retighten the non invasive bracing system. Reduce branch end weight on limbs growing towards and over the properties by 2m pruning back long extension growth to suitable replacement unions. Remove dead wood from the canopy and crown thin the remaining growth by no more than 15%. T6- Apple Tree: Formative prune to maintain current size and form.
Granted Trees 3 docs -
81 Harlaxton Drive Nottingham NG7 1JD
94% historically approved · decision due ~8 Oct
Certificate of Lawfulness for an existing use as a HMO (Class C4)
Awaiting decision 3 docs -
24 Lenton Avenue Nottingham NG7 1DY
Changes to front elevation of dwelling to facilitate garage conversion into habitable room
Granted Full applications 3 docsSmall domestic -
23A Lenton Avenue Nottingham Nottingham City NG7 1DX
Demolition of rear conservatory and erection of two storey rear extension. Replacement of tile hanging cladding with timber effect cladding to the front elevation. Alterations to the roof.
Granted Full applications Extension Demolition 20 docs -
10 Yeomans Court Clumber Road West Nottingham Nottingham City NG7 1EU
94% historically approved · decision due ~4 Sep
T1- Beech Tree: Check and retighten the non invasive bracing system. Reduce branch end weight on limbs growing towards and over the properties by 2m pruning back long extension growth to suitable replacement unions. Remove dead wood from the canopy and crown thin the remaining growth by no more than 15%. This work should only be carried out by a suitably qualified and professional arboriculturalist working to current best practice and guidelines. All tree work to be carried out in accordance with BS 3998: 2010 (recommendations for tree work).
Decided Extension Trees 3 docs
Other full applications applications
In Nottingham
-
26/00125/PFUL3 Withdrawn
Five Acres Hempshill Lane Nottingham Nottingham City NG6 8PF
Conversion of garage to granny room
-
26/00468/PFUL3 Granted
126 Morley Avenue Nottingham Nottingham City NG3 5FW
Conversion of 126 Morley Avenue to a three bedroom dwelling with one off road parking space
-
26/00124/PFUL3 Granted
36 Jersey Gardens Nottingham Nottingham City NG3 2QP
Garage conversion together with a single storey side and rear extension forming storage and home office accommodation
-
26/00612/PFUL3 Granted
The Futurist Valley Road Nottingham Nottingham City NG5 1JE
Change of use to B2 use (General Industrial) and MOT tests
-
26/00494/PFUL3 Granted
31 Wollaton Hall Drive Nottingham Nottingham City NG8 1AF
Two-storey extensions to the front, side, and rear, alterations to the roof including front and rear dormers, creation of first-floor front terrace above a single-storey projection, removal of chimney sticks and fenestration changes to all elevations.