Planning application
Site Of Bestwood Centre Bestwood Road Nottingham
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details submitted to discharge condition 7 (remediation verification) of planning permission reference 18/00312/PVAR3
As published by the council, reference 20/00441/PDS4
Application record
- Reference
- 20/00441/PDS4
- Type
- Discharge of conditions
- Status
- Decided
- Decision
- Approve
- Received
- 20 Feb 2020
- Validated
- 3 Mar 2020
- Decided
- 1 Jul 2021
- Ward
- Bulwell (May 2019)
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
20 Feb 2020
Received by Nottingham
-
3 Mar 2020
Validated
Checked as complete and ready for consideration.
-
1 Jul 2021
Decision issued: Approve
-
25 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
303-321 Main Street Nottingham NG6 8EF
Erection of fascia signs and totem signs.
Granted Advertising -
17 Old Mill Close, Bestwood Village, Nottinghamshire, NG6 8TA
Existing hipped roof to be replaced with gabled roof, including roof lights to front and rear, 3 x hipped dormer windows
Decided Full applications Loft or dormer Windows or glazing 6 docs -
Domestic
-
341 Hucknall Lane Nottingham NG6 8AA
Tree species: Small leaved lime -Proposed works: Fell. Reasons for the work: The trees canopy diameter is encroaching toward the front of the properties for both 341 and 343 Huckall Lane. The tree height is approximately 25m, so far exceeds the height of the houses. This leads to blocked drains, guttering and surface water drainage. The tree is situated on the east side of the property, so blocks all morning to mid-day sun to the houses. The risk of falling branches also presents a risk to passing public,, transport and local residents.
Refused Trees 9 docs -
5 Little Oakwood Drive Nottingham NG5 5AE
Erection of a two bedroom bungalow to the rear.
Granted Full applications 5 docs -
71 Brownlow Drive Nottingham Nottingham City NG5 5AA
Variation of condition S1 of planning permission reference 24/00897/PVAR3- two storey front, side and rear extension; single storey side and rear extension; and alterations to dwelling
Granted Conditions Extension 2 docsSmall domestic
Other conditions applications
In Nottingham
-
26/00801/PDS4 Granted
Bilborough College College Way Strelley Nottinghamshire NG8 4DQ
Details submitted to discharge conditions 3 (Biodiversity Gain Plan) and 4 (HMMP) of planning permission 25/02127/PFUL3.
-
26/00574/PDS4 Granted
5-7 Roden Street Nottingham Nottingham City NG3 1JH
Details submitted to discharge condition 2 (ecological enhancements) of planning permission 23/02035/PFUL3.
-
26/00121/PDS4 Granted
Site Of Chronos Richardson Ltd Arnside Road Nottingham
Details submitted to discharge conditions 2 (BNG Gain Plan), 3 (HMMP), 4 (remediation), 5 (surface water drainage during construction), 6 (noise and dust management), 7 (CTMP), 8 (materials), 9 (boundary treatments), 10 (renewables), 11 (cycle Storage), 12 (badgers), 13 (bats), 17 (landscaping), 18 (ecological enhancements), 21 (Air Quality), and 25 (piling) of planning permission 25/00059/PFUL3.
-
26/00118/PDS4 Granted
3 Gaul Street Nottingham Nottingham City NG6 8HR
Details submitted to discharge condition 2 (materials) and 3 (boundary treatments and bin storage) of planning permission reference 23/00850/PFUL3
-
21/02048/PDS4 Decided
Retail Unit Corner Of Berridge And Leslie Roads Nottingham NG7 6HT
Discharge of conditions 2 (external layout), 3 (cycle parking, electric vehicle charging scheme, bollards) and 4 (deliveries and car parking management plan) of planning permission reference 20/02497/PFUL3