Alnwick Retail Park Taylor Drive Alnwick Northumberland

Granted Northumberland 26/02552/FUL Full applications

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of electric vehicle charging hub with associated infrastructure including lighting/CCTV.

As published by the council, reference 26/02552/FUL

Application record

Reference
26/02552/FUL
Category
Full applications
Status
Permitted
Decision
Granted As published: Permitted
Received
21 Jul 2026
Validated
21 Jul 2026
Decided
15 Sep 2026
Ward
Alnwick Castle
Parish
Alnwick
Decision by
Delegated Decision

Site history

Applications at this address on the Northumberland register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • 26/02071/ADE Granted

    Alnwick Retail Park Taylor Drive Alnwick Northumberland

    Advertisement consent for 2 no. Electric Vehicle Charging Dual-Post signs and 1 no. Osprey appendage to existing totem.

    Decided 27 Jul 2026 Advertising

Timeline

Dates from the published record

  1. 21 Jul 2026

    Received by Northumberland

  2. 7 Aug 2026

    Added to PlanIndex

  3. 15 Sep 2026

    Decision issued: Permitted

  4. 15 Sep 2026

    Status changed to Permitted

    Previously Registered.

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

  • CONSULTEE COMMENT SUBMITTED ONLINE Consultee Comment · 30 Jul 2026
  • APPLICATION FORM REDACTED Application Form · 20 Jul 2026
  • SUBSTATION PLANS Plan · 20 Jul 2026
  • BLOCK PLAN Plan · 20 Jul 2026
  • EXISTING SITE PLAN Plan · 20 Jul 2026
  • PROPOSED SITE PLAN Plan · 20 Jul 2026
  • LAMP COLUMN WITH CCTV Plan · 20 Jul 2026
  • FENCE-DETAIL Plan · 20 Jul 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Northumberland granted permission on 15 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Northumberland

  • 26/03832/FUL Awaiting decision

    24 Watershaugh Road Warkworth NE65 0TX

    Erection of a free standing timber pergola

    3 Nov 2026 Full applications
  • 26/03834/FUL Awaiting decision

    Capri Lodge Northgate Morpeth Northumberland NE61 3BX

    Remodel the existing six bedroom detached dwelling and create a detached five bedroom family dwelling through carefully designed external internal alterations.

    3 Nov 2026 Full applications
  • 26/03830/FUL Awaiting decision

    Strother House 15 Alnwood Alnmouth Northumberland NE66 3NN

    Alterations and upgrades to rear and side of property

    3 Nov 2026 Full applications
  • 26/03076/FUL Granted

    6 Crofts Avenue Corbridge Northumberland NE45 5LY

    Demolition of existing porch and construction of new porch. Demolition of store and sun room and construction of new single-storey rear extension. Removal of existing bedroom window on West elevation.

    Received 2 Sep, published by the council 4 Sep 2026 Full applications
  • 26/03841/FUL Awaiting decision

    Glendale Engineering Berwick Road Wooler Northumberland NE71 6AH

    Proposed extension to existing paint shop and replacement of existing west facing lean-to building with a larger lean-to and open canopy

    Received 2 Nov, published by the council 3 Nov 2026 Full applications