Planning application
Land East Of Old Moor Shaft Longhirst Northumberland
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Part-retrospective planning application for the regularisation of the construction of a completed 6100mm extension to an existing agricultural building (Planning Ref: 19/03466/FUL) plus a further proposed extension of this agricultural building in addition to the regularisation of the construction of 2 No. small field shelter buildings.
As published by the council, reference 26/01612/FUL
Application record
- Reference
- 26/01612/FUL
- Category
- Full applications
- Status
- Permitted
- Decision
- Granted As published: Permitted
- Received
- 7 May 2026
- Validated
- 18 May 2026
- Decided
- 6 Aug 2026
- Ward
- Longhirst
- Parish
- Longhirst
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
7 May 2026
Received by Northumberland
-
18 May 2026
Validated
Checked as complete and ready for consideration.
-
6 Aug 2026
Decision issued: Permitted
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
JAG Technical Services Limited Agent, registered in Morpeth
Active · incorporated 2020 · Morpeth
25 applications on PlanIndex · across 4 councils · 89% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
- PROPOSED PLANS AND ELEVATIONS
- ECOLOGY
- ARCHAEOLOGY
- HIGHWAYS
- PUBLIC PROTECTION
- THE COAL AUTHORITY RESPONSE
- COAL MINING RISK ASSESSMENT
- APPLICATION FORM REDACTED
- EXISTING SITE LAYOUT PLAN
- EXISTING SITE LOCATION PLAN
- PROPOSED SITE LAYOUT PLAN
- PROPOSED SITE LOCATION PLAN
- EXISTING ELEVATIONS AND PLANS
- PROPOSED ELEVATIONS AND PLANS
- PROPOSED NORTH FIELD SHELTER ELEVATIONS AND PLANS
- PROPOSED SOUTH FIELD SHELTER ELEVATIONS AND PLANS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Northumberland granted permission on 6 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Northumberland
-
26/02537/FUL Granted
54 Linden Way Darras Hall Ponteland Northumberland NE20 9JF
Proposed two storey side extension; entrance porch; rear patio
-
26/03083/FUL Granted
4 Charlton Gardens Stobhill Gate Morpeth Northumberland NE61 2HG
First-floor extension above garage
-
26/02952/FUL Refused
15 Westfield Crescent Newbiggin-By-The-Sea Northumberland NE64 6XA
Change of use of section of back-lane to form part of residential curtilage and enclosure by extending existing boundary fence (retrospective)
-
26/02664/FUL Granted
Piper Close Aydon Road Corbridge Northumberland NE45 5PW
New dwelling to replace storage shed
-
26/03804/FUL Awaiting decision
6 Bath Terrace Blyth Northumberland NE24 3AX
Repair and Renovation of wood Box sash window frames and installation of replacement wood sliding sashes incorporating Vacuum glazing into the retained box sash window frames