Planning application
195 Alexandra Road Ashington Northumberland NE63 9LA
Works: Loft or dormer
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use from printers shop (Use Class E) to a mixed use of Use Classes F1 and F2, being a place of public worship or religious instruction, and a meeting place for the use of the local community, with ancillary, temporary residential accommodation in newly formed loft space for visiting clergy or speakers, with associated external alterations and roof lights front and rear
As published by the council, reference 26/00938/FUL
Application record
- Reference
- 26/00938/FUL
- Type
- Full Application
- Status
- Registered
- Received
- 17 Mar 2026
- Validated
- 23 Mar 2026
- Ward
- Hirst
- Parish
- Ashington
- Decision by
- Delegated Decision
- Postcode
- NE63 9LA
Timeline
Dates from the published record
-
17 Mar 2026
Received by Northumberland National Park
-
23 Mar 2026
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Northumberland National Park took a median of 37 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Anton Lang Planning Services LTD Agent, a planning consultancy registered in Newcastle Upon Tyne
Active · incorporated 2008 · Newcastle Upon Tyne
44 applications on PlanIndex · across 10 councils · 64% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Northumberland National Park for determination, against a statutory target of eight weeks. Over the last year Northumberland National Park decided full applications in a median of 56 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Moorhouse Farm Care Home Moorhouse Lane Ashington Northumberland NE63 9LJ
87% historically approved · decision due ~28 Apr
Conversion of vacant care home into 8no. residential units (5no. single storey & 3no. duplex) together with refurbishment and continued use of the existing adjoining dwelling (resulting in 9 dwellings in total) with associated internal and external works (part retrospective).
Awaiting decision Full applications 25 docsSeveral homes -
Moorhouse Farm Care Home Moorhouse Lane Ashington Northumberland NE63 9LJ
90% historically approved · decision due ~28 Apr
Listed Building Consent : Conversion of vacant care home into 8no. residential units (5no. single storey & 3no. duplex) together with refurbishment and continued use of the existing adjoining dwelling (resulting in 9 dwellings in total) with associated internal and external works (part retrospective).
Awaiting decision Heritage and listed buildings 23 docsSeveral homes -
244 Warehouse At Ground Floor Hawthorn Road Ashington Northumberland NE63 9AX
87% historically approved · decision due ~29 Sep
Installation of three powder-coated aluminium security roller shutters to the front elevation of the existing tanning studio
Awaiting decision Full applications 6 docs -
244 Tempos Health Studio Hawthorn Road Ashington Northumberland NE63 9AX
78% historically approved · decision due ~10 Mar
Discharge of Condition 5 (Construction Method Statement) on approved application 25/03791/CUD
Awaiting decision Conditions 2 docs -
Land South Of Wansbeck General Hospital Woodhorn Lane Ashington Northumberland
Discharge of conditions 8 (energy efficiency), 10 (estate streets), 11 (street maintenance), 14 (construction method statement), 16 (surface water drainage) and 22 (vehicle swept paths analysis) on approved planning application 19/01842/FUL
Refused Conditions 21 docs -
244 Warehouse At Ground Floor Hawthorn Road Ashington Northumberland NE63 9AX
87% historically approved · decision due ~29 Sep
Installation of three powder-coated aluminium security roller shutters to the front elevation of the existing tanning studio
Awaiting decision Full applications 6 docs
Other full applications
In Northumberland National Park
-
26/02540/FUL Refused
Lyneburn House Fenrother Lane Fenrother Northumberland NE61 3DS
Single storey side extension improving kitchen, utility and storage (retrospective)
-
26/02552/FUL Granted
Alnwick Retail Park Taylor Drive Alnwick Northumberland
Installation of electric vehicle charging hub with associated infrastructure including lighting/CCTV.
-
26/02535/FUL Granted
Moor View Moor Road Prudhoe Northumberland NE42 5PB
Single storey rear and side extension and internal reconfiguration.
-
26/02556/FUL Granted
9 Longmeadows Darras Hall Ponteland Northumberland NE20 9DX
Front, side and rear extensions
-
26/03259/FUL Awaiting decision
Brook House Ridley Mill Road Stocksfield Northumberland NE43 7QU
Erection of a two-storey pitched roof extension to replace the approved single-storey flat-roof extension on the same footprint as the previously approved scheme (ref: 24/01893/FUL)