Skip to content
PlanIndex Get alerts
Menu

Planning application

Eggborough Power Station Selby Road Eggborough East Yorkshire

Decided North York Moors National Park ZG2026/0040/DOC Discharge of Planning Condition

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Discharge of condition 30 (surface water) of approval ZG2025/0392/S73 Section 73 application to vary conditions 03 (plans) and 04 (appearance, scale & layout) of approval ZG2024/0737/S73 Section 73 application to vary condition 15 (30 year Biodiversity Enhancement Management and Monitoring Plan), and delete conditions 16 (Ecological Enhancement Measures) and 26 (surface water) of approval 2022/1105/FULM Construction and operation of a battery energy storage system with an electrical output capacity of up to 500MW and associated development including substation, control building(s), electrical cabling including below ground 400kV cabling, roadways and modified accesses, site security infrastructure, lighting, boundary treatments and landscaping granted on 17 January 2023

As published by the council, reference ZG2026/0040/DOC

Application record

Reference
ZG2026/0040/DOC
Type
Discharge of Planning Condition
Status
Awaiting decision
Decision
Condition decision
Received
16 Jan 2026
Validated
16 Jan 2026
Decided
12 Mar 2026
Ward
Osgoldcross
Parish
Eggborough Parish Council
Decision by
Delegated Decision

Site history

Applications at this address on the North York Moors National Park register

This site has had 14 applications since 2025: 5 approved, 0 refused.

  • ZG2026/0473/CPP Granted

    Eggborough Power Station Selby Road Eggborough East Yorkshire

    Lawful development certificate for proposed erection of a container housing a switchgear unit, a circa 1000 kilowatts diesel generator within enclosure, a circa 15,000 litre fuel tank, and associated hardstanding associated with the Eggborough BESS undertaking

    Decided 15 Jul 2026 Lawful development
  • Eggborough Power Station Selby Road Eggborough East Yorkshire

    Lawful development certificate for proposed erection of a container housing a switchgear unit, a circa 1000 kilowatts diesel generator within enclosure, a circa 15,000 litre fuel tank, and associated hardstanding associated with the Eggborough BESS undertaking

    Decided 15 Jul 2026 Lawful development
  • ZG2025/0992/DOC Decided

    Eggborough Power Station Selby Road Eggborough East Yorkshire

    Discharge of condition 19 (foul & surface water drainage) in relation to Plots 5/6 of approval 2019/1343/EIA Hybrid application for demolition of part of the former power station and ancillary buildings and its redevelopment (i) access into the site, internal roads, employment units, car parking, drainage infrastructure and landscaping and (ii) outline for the scale of redevelopment of the remainder of the site for employment floorspace, proposed buildings with ridge being between 9.5 metres and 24.5 metres, car parking, drainage infrastructure and strategic landscaping

    Decided 8 Jan 2026 Conditions
  • ZG2025/0991/DOC Decided

    Eggborough Power Station Selby Road Eggborough East Yorkshire

    Discharge of condition 19 (foul & surface water drainage) in relation to Plots 3/4A-D of approval 2019/1343/EIA Hybrid application for demolition of part of the former power station and ancillary buildings and its redevelopment (i) access into the site, internal roads, employment units, car parking, drainage infrastructure and landscaping and (ii) outline for the scale of redevelopment of the remainder of the site for employment floorspace, proposed buildings with ridge being between 9.5 metres and 24.5 metres, car parking, drainage infrastructure and strategic landscaping

    Decided 24 Feb 2026 Conditions
  • Eggborough Power Station Selby Road Eggborough East Yorkshire

    Reserved Matters application for the construction of employment development (Use Class E(g)iii, B2 and B8) for Units 3 and 4A-4D, including details of appearance, scale, landscaping, layout, along with all associated works in association to hybrid application 2019/1343/EIA to demolish and redevelop the power station

    Decided 13 Mar 2026 Reserved matters
  • Eggborough Power Station Selby Road Eggborough East Yorkshire

    Reserved Matters application for the construction of employment development (Use Class E(g)iii, B2 and B8) for Units 5 and 6, including details of appearance, scale, landscaping, layout, along with all associated works including repurposing an existing car park in association to hybrid application 2019/1343/EIA to demolish and redevelop the power station.

    Decided 27 Mar 2026 Reserved matters
  • ZG2025/0848/DOC Decided

    Eggborough Power Station Selby Road Eggborough East Yorkshire

    Discharge of conditions 15 (BEMP), 16 (landscaping) & 18 (landscaping) of approval ZG2025/0392/S73 Section 73 application to vary conditions 03 (plans) and 04 (appearance, scale & layout) of approval ZG2024/0737/S73 Section 73 application to vary condition 15 (30 year Biodiversity Enhancement Management and Monitoring Plan), and delete conditions 16 (Ecological Enhancement Measures) and 26 (surface water) of approval 2022/1105/FULM Construction and operation of a battery energy storage system with an electrical output capacity of up to 500MW and associated development including substation, control building(s), electrical cabling including below ground 400kV cabling, roadways and modified accesses, site security infrastructure, lighting, boundary treatments and landscaping granted on 17 January 2023

    Decided 28 Nov 2025 Conditions
  • ZG2025/0847/DOC Decided

    Eggborough Power Station Selby Road Eggborough East Yorkshire

    Discharge of Condition 24 (drainage) of approval ZG2025/0392/S73 Section 73 application to vary conditions 03 (plans) and 04 (appearance, scale & layout) of approval ZG2024/0737/S73 Section 73 application to vary condition 15 (30 year Biodiversity Enhancement Management and Monitoring Plan), and delete conditions 16 (Ecological Enhancement Measures) and 26 (surface water) of approval 2022/1105/FULM Construction and operation of a battery energy storage system with an electrical output capacity of up to 500MW and associated development including substation, control building(s), electrical cabling including below ground 400kV cabling, roadways and modified accesses, site security infrastructure, lighting, boundary treatments and landscaping granted on 17 January 2023

    Decided 2 Dec 2025 Conditions
  • ZG2025/0833/DOC Decided

    Eggborough Power Station Selby Road Eggborough East Yorkshire

    Discharge of Condition 22 (Construction Traffic Environmental Management Plan) of approval ZG2025/0392/S73 Section 73 application to vary conditions 03 (plans) and 04 (appearance, scale & layout) of approval ZG2024/0737/S73 Section 73 application to vary condition 15 (30 year Biodiversity Enhancement Management and Monitoring Plan), and delete conditions 16 (Ecological Enhancement Measures) and 26 (surface water) of approval 2022/1105/FULM Construction and operation of a battery energy storage system with an electrical output capacity of up to 500MW and associated development including substation, control building(s), electrical cabling including below ground 400kV cabling, roadways and modified accesses, site security infrastructure, lighting, boundary treatments and landscaping granted on 17 January 2023

    Decided 5 Dec 2025 Conditions
  • ZG2025/0836/DOC Granted

    Eggborough Power Station Selby Road Eggborough East Yorkshire

    Discharge of Conditions 26 (Storage of Chemicals), 27 (Remediation Strategy) and 29 (Contamination) of approval ZG2025/0392/S73 Section 73 application to vary conditions 03 (plans) and 04 (appearance, scale & layout) of approval ZG2024/0737/S73 Section 73 application to vary condition 15 (30 year Biodiversity Enhancement Management and Monitoring Plan), and delete conditions 16 (Ecological Enhancement Measures) and 26 (surface water) of approval 2022/1105/FULM Construction and operation of a battery energy storage system with an electrical output capacity of up to 500MW and associated development including substation, control building(s), electrical cabling including below ground 400kV cabling, roadways and modified accesses, site security infrastructure, lighting, boundary treatments and landscaping granted on 17 January 2023

    Decided 1 Sep 2025 Conditions

Timeline

Dates from the published record

  1. 16 Jan 2026

    Received by North York Moors National Park

  2. 12 Mar 2026

    Decision issued: Condition decision

  3. 27 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

DWD Property and Planning Limited Agent, a planning consultancy registered in Helsby

Active · incorporated 2023 · Helsby

111 applications on PlanIndex · across 32 councils · 93% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

North York Moors National Park has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Eggborough Power Station Selby Road Eggborough East Yorkshire

    ZG2025/0828/DOC Submitted 14 Aug 2025 0.1 miles away

    Discharge of Condition 8 (Operational Safety Management Plan) of planning approval ZG2025/0392/S73 Section 73 application to vary conditions 03 (plans) and 04 (appearance, scale & layout) of approval ZG2024/0737/S73 Section 73 application to vary condition 15 (30 year Biodiversity Enhancement Management and Monitoring Plan), and delete conditions 16 (Ecological Enhancement Measures) and 26 (surface water) of approval 2022/1105/FULM Construction and operation of a battery energy storage system with an electrical output capacity of up to 500MW and associated development including substation, control building(s), electrical cabling including below ground 400kV cabling, roadways and modified accesses, site security infrastructure, lighting, boundary treatments and landscaping granted on 17 January 2023

    Decided Conditions 10 docs
  • Eggborough Power Station Selby Road Eggborough East Yorkshire

    ZG2025/0833/DOC Submitted 15 Aug 2025 0.1 miles away

    Discharge of Condition 22 (Construction Traffic Environmental Management Plan) of approval ZG2025/0392/S73 Section 73 application to vary conditions 03 (plans) and 04 (appearance, scale & layout) of approval ZG2024/0737/S73 Section 73 application to vary condition 15 (30 year Biodiversity Enhancement Management and Monitoring Plan), and delete conditions 16 (Ecological Enhancement Measures) and 26 (surface water) of approval 2022/1105/FULM Construction and operation of a battery energy storage system with an electrical output capacity of up to 500MW and associated development including substation, control building(s), electrical cabling including below ground 400kV cabling, roadways and modified accesses, site security infrastructure, lighting, boundary treatments and landscaping granted on 17 January 2023

    Decided Conditions 11 docs
  • Eggborough Power Station Selby Road Eggborough East Yorkshire

    ZG2025/0836/DOC Submitted 15 Aug 2025 0.1 miles away

    Discharge of Conditions 26 (Storage of Chemicals), 27 (Remediation Strategy) and 29 (Contamination) of approval ZG2025/0392/S73 Section 73 application to vary conditions 03 (plans) and 04 (appearance, scale & layout) of approval ZG2024/0737/S73 Section 73 application to vary condition 15 (30 year Biodiversity Enhancement Management and Monitoring Plan), and delete conditions 16 (Ecological Enhancement Measures) and 26 (surface water) of approval 2022/1105/FULM Construction and operation of a battery energy storage system with an electrical output capacity of up to 500MW and associated development including substation, control building(s), electrical cabling including below ground 400kV cabling, roadways and modified accesses, site security infrastructure, lighting, boundary treatments and landscaping granted on 17 January 2023

    Granted Conditions
  • Eggborough Power Station Selby Road Eggborough East Yorkshire

    ZG2025/0821/DOC Submitted 12 Aug 2025 0.1 miles away

    Discharge conditions 04 (external appearance), 12 (lighting) and 32 (fencing) of approval ZG2025/0392/S73 Section 73 application to vary conditions 03 (plans) and 04 (appearance, scale and layout) of approval ZG2024/0737/S73 Section 73 application to vary condition 15 (30 year Biodiversity Enhancement Management and Monitoring Plan), and delete conditions 16 (Ecological Enhancement Measures) and 26 (surface water) of approval 2022/1105/FULM Construction and operation of a battery energy storage system with an electrical output capacity of up to 500MW and associated development including substation, control building(s), electrical cabling including below ground 400kV cabling, roadways and modified accesses, site security infrastructure, lighting, boundary treatments and landscaping granted on 17 January 2023

    Decided Conditions 48 docs
  • Eggborough Power Station Selby Road Eggborough East Yorkshire

    ZG2025/0815/DOC Submitted 11 Aug 2025 0.1 miles away

    Discharge of conditions 02 (phasing) and 07 (connection) of approval ZG2025/0392/S73 Section 73 application to vary conditions 03 (plans) and 04 (appearance, scale & layout) of approval ZG2024/0737/S73 Section 73 application to vary condition 15 (30 year Biodiversity Enhancement Management and Monitoring Plan), and delete conditions 16 (Ecological Enhancement Measures) and 26 (surface water) of approval 2022/1105/FULM Construction and operation of a battery energy storage system with an electrical output capacity of up to 500MW and associated development including substation, control building(s), electrical cabling including below ground 400kV cabling, roadways and modified accesses, site security infrastructure, lighting, boundary treatments and landscaping granted on 17 January 2023

    Decided Conditions 11 docs
  • Eggborough Power Station Selby Road Eggborough East Yorkshire

    ZG2025/0828/DOC Submitted 14 Aug 2025 0.1 miles away

    Discharge of Condition 8 (Operational Safety Management Plan) of planning approval ZG2025/0392/S73 Section 73 application to vary conditions 03 (plans) and 04 (appearance, scale & layout) of approval ZG2024/0737/S73 Section 73 application to vary condition 15 (30 year Biodiversity Enhancement Management and Monitoring Plan), and delete conditions 16 (Ecological Enhancement Measures) and 26 (surface water) of approval 2022/1105/FULM Construction and operation of a battery energy storage system with an electrical output capacity of up to 500MW and associated development including substation, control building(s), electrical cabling including below ground 400kV cabling, roadways and modified accesses, site security infrastructure, lighting, boundary treatments and landscaping granted on 17 January 2023

    Decided Conditions 10 docs

In North York Moors National Park

  • ZE26/00513/73A Granted

    Land West Of Beverley Road Norton North Yorkshire YO17 9PJ

    Variation of condition 02 of planning approval ZE24/09011/MFUL dated 23.07.2025 to allow for alterations to the layout of the stable yard, rehabilitation building and stable block, in addition to revisions to the development phasing to better align with current requirements

    Received 17 Jun, published by the council 15 Aug 2026 Conditions
  • 26/04694/DISCON Granted

    The Outside Inn Skipton Road Kettlesing North Yorkshire HG3 2LT

    Approval of details under Condition 3 (Turbine and Ancillary Equipment Removal) of planning permission 26/01985/DVCON Section 73 application for the Variation of Condition 4 (increase time limit to 12 months for removal of equipment) of planning permission HGT12/01564/FUL (Erection of wind turbine on 24m high monopole mast.) To allow longer timescale noted within condition to ensure issue can be resolved safely.

    Received 7 Aug, published by the council 26 Aug 2026 Conditions
  • ZD26/00487/DIS Granted

    Morris Grange Nursing Home Middleton Tyas Richmond North Yorkshire DL10 6NX

    Discharge of conditions 13 (crime prevention), 14 (lighting), 15 (part L energy), 16 (contamination verification), and 17 (bicycle storage) attached to planning permission 20/00007/FULL

    Received 31 Jul, published by the council 15 Aug 2026 Conditions
  • 26/04413/DISCON Refused

    Keepers Cottage Hall Lane Cundall North Yorkshire YO61 2RP

    Approval of details under Condition 3 (Root Protection Area) of planning permission 26/00375/FUL Demolition of an existing dog kennel. Erection of a two-storey outbuilding comprising of garaging, gym, office space and guest accomodation. Two-storey side extension to principal dwelling and additional single storey sunroom.

    Received 29 Jul, published by the council 15 Aug 2026 Conditions
  • 26/04411/DISCON Granted

    Former Police Training Centre Yew Tree Lane Harrogate North Yorkshire HG2 9JZ

    Approval of details under Condition No. 10 (External wall materials for Kensington House) and Condition 19 (Verge and Fascia Treatment for the Lodge) of Planning Permission HGT23/00259/REMMAJ Reserved matters application pursuant to outline planning permission 20/02318/OUTMAJ with full details of the appearance, landscaping, layout, access and scale of a development of 184 new build dwellings and the conversion of North Lodge, Headmasters House, Kensington House and Library to form 16 dwellings, together with associated infrastructure, sustainable drainage system and biodiversity enhancement works. AMENDED PLANS RECEIVED

    Received 29 Jul, published by the council 26 Aug 2026 Conditions