Planning application
Land To East New Road Drax North Yorkshire
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Discharge of condition 42 (archaeology) of approval 2022/0711/EIA Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
As published by the council, reference SELZG2026/0206/DOC
Application record
- Reference
- SELZG2026/0206/DOC
- Type
- Discharge of Planning Condition
- Status
- Awaiting decision
- Decision
- Condition decision
- Received
- 6 Mar 2026
- Validated
- 6 Mar 2026
- Decided
- 17 Mar 2026
- Ward
- Camblesforth And Carlton
- Parish
- Long Drax Parish Council
- Decision by
- Delegated Decision
Site history
Applications at this address on the North York Moors National Park register
This site has had 13 applications since 2025: 3 approved, 0 refused.
-
ZG2026/0208/DOC Granted
Land To East New Road Drax North Yorkshire
Discharge of conditions 31 (CPP), 32 (CMS), 33 (trees) and 34 (landscaping) of approval 2022/0711/EIA Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
-
ZG2026/0206/DOC Decided
Land To East New Road Drax North Yorkshire
Discharge of condition 42 (archaeology) of approval 2022/0711/EIA Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
-
SELZG2026/0208/DOC Granted
Land To East New Road Drax North Yorkshire
Discharge of conditions 31 (CPP), 32 (CMS), 33 (trees) and 34 (landscaping) of approval 2022/0711/EIA Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
-
ZG2026/0098/S73 Awaiting decision
Land To East New Road Drax North Yorkshire
Section 73 application to vary condition 01 (approved plans), remove condition 02 (building colour scheme) of approval ZG2024/0241/REMM Reserved matters application including access, appearance, landscaping, layout and scale for the development comprising the construction of a convertor station and the discharge of conditions 6 (biodiversity net gain plan), 7 (ecological management plan), 8 (levels), 10 (hard and soft landscaping scheme), 11 (arboricultural method statement, tree survey and tree protection plan), and 13 (land restoration scheme) of approval 2022/0711/EIA Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority] granted on 16 August 2024
-
ZG2026/0065/DOC Decided
Land To East New Road Drax North Yorkshire
Discharge of conditions 14 (Construction Environmental Management Plan), 18 (drainage), 19 (rate of development flow runoff), 20 (maintenance of SuDS scheme), 21 (treatment of surface water flows), 22 (Exceedance Flow Plan), 23 (discharge of surface water), 54 (Construction Environmental Management Plan), 55 (Construction Traffic Management Plan) & 57 (Construction Drainage Scheme) of approval 2022/0711/EIA - Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
-
ZG2026/0064/DOC Decided
Land To East New Road Drax North Yorkshire
Discharge of conditions 50 (CPP), 51 (CMS), 52 (trees), 53 (land restoration), 60 (contamination) of approval 2022/0711/EIA Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
-
SELZG2026/0065/DOC Decided
Land To East New Road Drax North Yorkshire
Discharge of conditions 14 (Construction Environmental Management Plan), 18 (drainage), 19 (rate of development flow runoff), 20 (maintenance of SuDS scheme), 21 (treatment of surface water flows), 22 (Exceedance Flow Plan), 23 (discharge of surface water), 54 (Construction Environmental Management Plan), 55 (Construction Traffic Management Plan) & 57 (Construction Drainage Scheme) of approval 2022/0711/EIA - Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
-
SELZG2026/0064/DOC Decided
Land To East New Road Drax North Yorkshire
Discharge of conditions 50 (CPP), 51 (CMS), 52 (trees), 53 (land restoration), 60 (contamination) of approval 2022/0711/EIA Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
-
ZG2026/0037/DOC Awaiting decision
Land To East New Road Drax North Yorkshire
Discharge of conditions 39 (permanent water course crossing infrastructure), 40 (construction scheme) and 41 (installation details) of approval 2022/0711/EIA Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
-
SELZG2025/1120/DOC Decided
Land To East New Road Drax North Yorkshire
Discharge of condition 02 (materials) of approval ZG2024/0241/REMM Reserved matters application including access, appearance, landscaping, layout and scale for the development comprising the construction of a convertor station and the discharge of conditions 6 (biodiversity net gain plan), 7 (ecological management plan), 8 (levels), 10 (hard and soft landscaping scheme), 11 (arboricultural method statement, tree survey and tree protection plan), and 13 (land restoration scheme) of approval 2022/0711/EIA Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
Timeline
Dates from the published record
-
6 Mar 2026
Received by North York Moors National Park
-
17 Mar 2026
Decision issued: Condition decision
-
1 Oct 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Prysmian Powerlink S.r.l Agent, registered in Milan
Registered · incorporated 2022 · Milan
15 applications on PlanIndex · across 3 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
North York Moors National Park has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land To East New Road Drax North Yorkshire
Discharge of condition 42 (archaeology) of approval 2022/0711/EIA Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
Decided Conditions 6 docs -
Land To East New Road Drax North Yorkshire
Discharge of conditions 31 (CPP), 32 (CMS), 33 (trees) and 34 (landscaping) of approval 2022/0711/EIA Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
Granted Conditions Trees 17 docs -
Land To East New Road Drax North Yorkshire
Discharge of conditions 50 (CPP), 51 (CMS), 52 (trees), 53 (land restoration), 60 (contamination) of approval 2022/0711/EIA Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
Decided Conditions Trees 22 docs -
Land To East New Road Drax North Yorkshire
Discharge of conditions 14 (Construction Environmental Management Plan), 18 (drainage), 19 (rate of development flow runoff), 20 (maintenance of SuDS scheme), 21 (treatment of surface water flows), 22 (Exceedance Flow Plan), 23 (discharge of surface water), 54 (Construction Environmental Management Plan), 55 (Construction Traffic Management Plan) & 57 (Construction Drainage Scheme) of approval 2022/0711/EIA - Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
Decided Conditions 30 docs -
Land To East New Road Drax North Yorkshire
Discharge of conditions 14 (Construction Environmental Management Plan), 18 (drainage), 19 (rate of development flow runoff), 20 (maintenance of SuDS scheme), 21 (treatment of surface water flows), 22 (Exceedance Flow Plan), 23 (discharge of surface water), 54 (Construction Environmental Management Plan), 55 (Construction Traffic Management Plan) & 57 (Construction Drainage Scheme) of approval 2022/0711/EIA - Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
Decided Conditions 30 docs -
Land To East New Road Drax North Yorkshire
Discharge of conditions 31 (CPP), 32 (CMS), 33 (trees) and 34 (landscaping) of approval 2022/0711/EIA Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]
Granted Conditions Trees 17 docs
Other condition discharge and variation applications
In North York Moors National Park
-
NY/2026/0050/73 Granted
Kirby Misperton Waste Transfer Station, Tofts Road, Kirby Misperton, YO17 6BG
Variation of condition No's 15 & 31 of Planning Permission Ref. C3/17/01366/CPO to increase the hours of operation including Bank (or Public holidays) and increase vehicle movements from 50 per day up to 60 per day (30 in 30 out)
-
ZD26/00512/DIS Granted
White House Patrick Brompton Bedale North Yorkshire DL8 1JL
Discharge of conditions 3 and 4 attached to planning permission ZD26/00270/FULL
-
26/05342/DISCON Granted
Land Comprising Field At 441364 462959 Limebar Bank Road Marton Cum Grafton North Yorkshire
Approval of details under Condition 3 (Wheel Washing Facilites) of planning permission ZC23/01888/FUL Change of use from pasture to provide 4 No high quality timber holiday lodges.
-
NY/2025/0204/SDL Granted
Gebdykes Quarry, Gebdykes Farm, Burton on Yore, North Yorkshire, HG4 4BT
Submission of a Landscape and Biodiversity Restoration and Management Plan under the terms of a S106 Agreement in regards to planning permission Ref. C6/22/00349/CMA
-
26/06010/DVCON Awaiting decision
Housebrough Farm Road From Boltby Mill Road To Boltby Boltby North Yorkshire YO7 2EB
S19 application for the variation of condition number 2 (Approved plans) of previously approved reference 16/02678/LBC.