Skip to content
PlanIndex Get alerts
Menu

Planning application

4 Thorntree Close Ravenstone Coalville Leicestershire LE67 2JY

Granted North West Leicestershire 26/00589/CLP Lawful Development Certificate- Proposed

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Certificate of Lawful Proposed Development for the erection of a single-storey rear extension

As published by the council, reference 26/00589/CLP

Application record

Reference
26/00589/CLP
Type
Lawful Development Certificate- Proposed
Status
Decided
Decision
Granted As published: Application Permitted
Received
1 May 2026
Validated
5 May 2026
Decided
29 Jun 2026
Ward
Snibston North
Parish
Ravenstone With Snibston
Decision by
Delegated Decision
Postcode
LE67 2JY

Timeline

Dates from the published record

  1. 1 May 2026

    Received by North West Leicestershire

  2. 5 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jun 2026

    Decision issued: Application Permitted

  4. 22 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Buildingcontrol: 26/04256/BREGS

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

  • PROPOSED ELEVATIONS Other · 29 Jun 2026
  • PROPOSED SITE/BLOCK PLAN Other · 29 Jun 2026
  • OFFICER REPORT Report · 29 Jun 2026
  • NEW PERMITTED CLP Decision · 29 Jun 2026
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 05 May 2026
  • EXISTING ELEVATIONS Drawing · 05 May 2026
  • EXISTING FLOOR PLANS Drawing · 05 May 2026
  • PROPOSED ELEVATIONS Drawing · 05 May 2026
  • PROPOSED FIRST FLOOR ANNOTATIONS Drawing · 05 May 2026
  • PROPOSED FLOOR PLANS Drawing · 05 May 2026
  • PROPOSED GROUND FLOOR ANNOTATIONS Drawing · 05 May 2026
  • PROPOSED BLOCK PLAN Drawing · 05 May 2026
  • LOCATION PLAN AND EXISTING BLOCK PLAN Drawing · 05 May 2026
  • PLANNING STATEMENT Correspondence · 05 May 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

North West Leicestershire granted permission on 29 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 9 Claremont Drive Coalville Leicestershire LE67 2ND

    20/01758/FUL Submitted 18 Nov 2020 150 yards away

    Single storey side and rear extension (Retrospective)

    Granted Full applications Extension 5 docs
    Small domestic
  • 3 Claremont Drive Coalville Leicestershire LE67 2ND

    22/01580/FUL Submitted 5 Oct 2022 200 yards away

    Replace existing rear flat roof with a pitched tiled roof and reposition rear door and window

    Granted Full applications Windows or glazing 6 docs
  • 397 Ashby Road Coalville LE67 3LJ

    22/00393/FUL Submitted 7 Mar 2022 200 yards away

    Erection of a single-storey rear lean-to extension

    Granted Full applications Extension 4 docs
    Small domestic
  • 32 Swannington Road Ravenstone Coalville Leicestershire LE67 3NE

    22/00696/PNH Submitted 25 Apr 2022 200 yards away

    Erection of a single-storey rear extension measuring 5 metres in length, 2.35 metres in height to the eaves and 4 metres maximum height

    Granted Householder Extension 6 docs
    Small domestic
  • Land Off Ashby Road Coalville LE67 3LJ

    22/00454/T28 Submitted 10 Mar 2022 250 yards away

    Intention to install pole at the above location

    Granted Telecoms 1 doc
  • 2 Belmont Drive Coalville Leicestershire LE67 3LQ

    22/00835/FUL Submitted 18 May 2022 250 yards away

    Erection of a single-storey front extension and part rendering to the principal elevation of the dwelling (Amended Scheme to planning permission (21/01637/FUL)

    Granted Full applications Extension 6 docs
    Small domestic

In North West Leicestershire

  • 26/00714/CLP Granted

    Plot 8 Hall Farm Road Kegworth Derby Leicestershire DE74 2BF

    Certificate of Lawful Proposed Development for internal alterations to existing warehouse

    Received 1 Jun, published by the council 22 Jul 2026 Lawful development
  • 26/00737/CLP Granted

    Bottom Farm Cottage Farm Town Lane Farm Town Coleorton Coalville Leicestershire LE67 8FG

    Certificate of Lawful Proposed Development to establish that planning permission 23/00686/FUL has been lawfully commenced before the expiry of 15th November 2026

    Received 5 Jun, published by the council 22 Jul 2026 Lawful development
  • 26/01229/CLE Awaiting decision

    31 Church Street Belton Loughborough Leicestershire LE12 9UG

    Certificate of Lawfulness to confirm the lawful implementation of outline planning permission 20/00627/OUT and 23/01089/REM for the demolition of barns, conversion of one barn to a dwelling and erection of four dwellings

    Received 24 Sep, published by the council 5 Oct 2026 Lawful development
  • 26/01051/CLE Granted

    Memorial House Stenson Road Coalville Leicestershire LE67 4JP

    Certificate of Lawful Existing Development for alterations to the existing building, including enlargement of 5 existing windows and the proposal of 21 additional parking bays at Memorial House Stenson Road, Coalville, Leicestershire, LE67 4JP in accordance with planning permission 21/00386/FUL

    Received 14 Aug, published by the council 24 Aug 2026 Lawful development
  • 26/01200/CLP Awaiting decision

    25 Stinchcombe Way Hugglescote Coalville Leicestershire LE67 2PL

    Certificate of Lawful Proposed Development for removal of garage door and insertion of 1no. window and associated external works

    Received 16 Sep, published by the council 5 Oct 2026 Lawful development