Skip to content
PlanIndex Get alerts
Menu

Planning application

Garthside 169 The Moor Coleorton Coalville Leicestershire LE67 8GD

Granted North West Leicestershire 24/00230/FUL Full Application

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Insert new patterned glass ground floor window in east facing wall

As published by the council, reference 24/00230/FUL

Application record

Reference
24/00230/FUL
Type
Full Application
Status
Decided
Decision
Granted As published: Application Permitted
Received
16 Feb 2024
Validated
1 Mar 2024
Decided
1 May 2024
Ward
Valley
Parish
Coleorton
Decision by
Delegated Decision
Postcode
LE67 8GD

Site history

Applications at this address on the North West Leicestershire register

This site has had 2 applications since 2023: 2 approved, 0 refused.

  • 23/01049/FUL Granted

    Garthside 169 The Moor Coleorton Coalville Leicestershire LE67 8GD

    Alteration and replacement of 3no. existing ground floor windows including enlargement of south side window and replace two front (west) windows with bi-fold doors.

    Decided 30 Nov 2023 Full applications

Timeline

Dates from the published record

  1. 16 Feb 2024

    Received by North West Leicestershire

  2. 1 Mar 2024

    Validated

    Checked as complete and ready for consideration.

  3. 1 May 2024

    Decision issued: Application Permitted

  4. 22 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

  • NEW PERMITTED FUL Decision · 01 May 2024
  • DUNSTAN Public Comment · 02 Apr 2024
  • COLEORTON PARISH COUNCIL CONSULTATION RESPONSE Consultation Response · 13 Mar 2024
  • EXISTING AND PROPOSED SITE PLAN AND ELEVATIONS Drawing · 01 Mar 2024
  • LOCATION PLAN Drawing · 01 Mar 2024
  • PROPOSED FLOOR PLAN AND ELEVATION Drawing · 01 Mar 2024
  • WINDOW SPEC Report · 01 Mar 2024
  • WINDOW SPEC Report · 01 Mar 2024
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 01 Mar 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

North West Leicestershire granted permission on 1 May 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In North West Leicestershire

  • 26/00779/FUL Granted

    Greystones 34 Upper Packington Road Ashby De La Zouch Leicestershire LE65 1EF

    Alterations to 2no. existing dormers on front and side elevations and insertion of 1no. dormer on rear elevation

    Received 15 Jun, published by the council 22 Jul 2026 Full applications
  • 26/00832/FUL Granted

    81 Meadow Lane Coalville Leicestershire LE67 4DN

    Demolition of existing store and workshop and erection of two storey rear extension

    Received 25 Jun, published by the council 22 Jul 2026 Full applications
  • 26/01055/FUL Granted

    Shippenstone Mill Street Packington Ashby De La Zouch Leicestershire LE65 1WN

    Retention of an electrical car charging point located on an existing brick pillar to the frontage of the main dwellinghouse (Retrospective Application)

    Received 14 Aug, published by the council 24 Aug 2026 Full applications
  • 26/00625/FUL Granted

    2A School Lane Newton Burgoland Coalville Leicestershire LE67 2SL

    Conversion and extension of existing detached outbuilding to provide for residential annexe accommodation

    Received 8 May, published by the council 22 Jul 2026 Full applications
  • 26/00905/FUL Granted

    Windrush 3 Hall Gardens Hemington Derby Leicestershire DE74 2RU

    Replacement of existing glazed conservatory roof with tile roof

    Received 14 Jul, published by the council 13 Aug 2026 Full applications