Skip to content
PlanIndex Get alerts
Menu

Planning application

15 Gutteridge Street Coalville Leicestershire LE67 3BG

Granted North West Leicestershire 24/00013/T28 Telecom PD 28 Day Notification

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of 9m medium wooden pole

As published by the council, reference 24/00013/T28

Application record

Reference
24/00013/T28
Type
Telecom PD 28 Day Notification
Status
Decided
Decision
Granted As published: No objection
Received
29 Dec 2023
Validated
29 Dec 2023
Decided
4 Jan 2024
Ward
Snibston South
Parish
Coalville
Postcode
LE67 3BG

Timeline

Dates from the published record

  1. 29 Dec 2023

    Received by North West Leicestershire

  2. 4 Jan 2024

    Decision issued: No objection

  3. 22 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

1 document on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

North West Leicestershire granted permission on 4 January 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About telecoms applications

Telecoms applications cover masts, antennas and cabinets, usually as prior approval cases where the council considers siting and appearance only. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 14 James Street Coalville Leicestershire LE67 3BW

    24/00195/FUL Submitted 9 Feb 2024 50 yards away

    Erection of two single storey rear extensions and first floor rear extension

    Granted Full applications Extension 8 docs
    Small domestic
  • Public Car Park James Street Coalville Leicestershire

    22/01619/FUL Submitted 12 Oct 2022 50 yards away

    Placement of 2 x storage containers for a temporary period no longer than 2 years (retrospective)

    Withdrawn Full applications 12 docs
  • Car Park Opposite 97 Belvoir Road Coalville Leicestershire LE67 3PH

    24/00012/T28 Submitted 29 Dec 2023 100 yards away

    Installation of 10m medium wooden pole

    Granted Telecoms 1 doc
  • 99 Belvoir Road Coalville Leicestershire LE67 3PH

    26/01024/FUL Submitted 10 Aug 2026 100 yards away

    93% historically approved · decision due ~20 Oct

    Conversion of former doctors surgery to 16 no. bedroom house of multiple occupation (Sui generis use) with a maximum of 16 occupants to include first floor extension and associated external alterations and works (revised scheme to 25/00460/FUL)

    Awaiting decision Full applications Extension 15 docs
  • The Marlborough Centre 3 To 6 Marlborough Square Coalville Leicestershire LE67 3WD

    22/01823/FULM Submitted 22 Nov 2022 100 yards away

    Part demolition, part new build and full internal refurbishment to create 12 new dwellings to include replacement shopfronts to elevations that front Marlborough Square and Belvoir Road with the loss of 1 retail unit to Owen Street, the formation of new public toilets and the creation of 2 new parking spaces and associated external works

    Granted Full applications New dwelling Demolition 59 docs
    Major scheme
  • 99 Belvoir Road Coalville Leicestershire LE67 3PH

    21/01963/FUL Submitted 12 Oct 2021 100 yards away

    Conversion of former doctors surgery into 7 self-contained flats comprising 2 no. 1 bed and 5 no. 2 bed units

    Granted Full applications New dwelling 43 docs

In North West Leicestershire

  • 26/01143/T28 Decided

    Outside 124 Loughborough Road Thringstone Coalville Leicestershire LE67 8LR

    Installation of 1no. 10m light wooden pole

    Received 1 Sep, published by the council 6 Sep 2026 Telecoms
  • 26/01142/T28 Decided

    Side Of 1 Kelso Court Thringstone Coalville Leicestershire LE67 8PT

    Installation of 1no. 9m light wooden pole

    Received 1 Sep, published by the council 6 Sep 2026 Telecoms
  • 26/01140/T28 Decided

    Opposite 17 The Green Thringstone Coalville Leicestershire LE67 8NR

    Installation of 1no. 10m light wooden pole

    Received 1 Sep, published by the council 6 Sep 2026 Telecoms
  • 26/01110/T28 Decided

    Outside 2 Main Street Osgathorpe Loughborough Leicestershire LE12 9TA

    Installation of 1no. 9m light wooden pole

    Received 25 Aug, published by the council 30 Aug 2026 Telecoms
  • 26/01080/T28 Decided

    Outside 6 Field Close Thringstone Coalville Leicestershire LE67 8PU

    Installation of 1no. 9m Light Wooden Pole

    Received 19 Aug, published by the council 24 Aug 2026 Telecoms