Planning application

23/00438/FUL

8 Hornbeam Close Ravenstone Coalville Leicestershire LE67 3RH

Granted North West Leicestershire Full Application

Proposal

Erection of a two-storey side extension

As published by the council, reference 23/00438/FUL

Timeline

Dates from the published record

  1. 11 Apr 2023

    Received by North West Leicestershire

  2. 12 Apr 2023

    Validated

    Checked as complete and ready for consideration.

  3. 6 Jun 2023

    Decision issued: Application Permitted

  4. 26 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 23/01052/FULM Granted

    Units 18A To 18C Snibston Drive The Oaks Industrial Estate Coalville Leicestershire LE67 3NQ

    Change of use from paper recycling waste centre (sui generis) to general industrial and distribution (use classes B2 and B8)

    14 Aug 2023 205m away Full applications
  • 21/01105/TPO Granted

    55 Coalville Lane Ravenstone Coalville Leicestershire LE67 2LR

    Works to 1no. Lime tree (Protected by Tree Preservation Order)

    5 Jun 2021 250m away Trees
  • 23/00233/T28 Granted

    Units 23 And 24 Industrial Estate Snibston Drive Coalville Leicestershire LE67 3NQ

    Proposed upgrade to existing radio base station

    23 Feb 2023 277m away Telecoms
  • 24/00571/DIS Granted

    Units 18A To 18C Snibston Drive Coalville Leicestershire LE67 3NQ

    The approval of details reserved by condition 7 (Cycle Parking) relating to planning permission reference 23/01052/FULM

    2 May 2024 277m away Conditions
  • 23/00259/T28 Granted

    The Oaks Industrial Estate Ravenstone Road Coalville Leicestershire LE67 3NB

    The removal of 3 no. existing antennas and existing 3 no. dummy antennas to be removed on existing 17.5m monopole headframe. The installation of 6 no. replacement antennas on existing 17.5m monopole headframe. The installation of 2 no. 300mm dishs fixed to the existing headframe below the antennas. Ancillary development thereto including the installation of 3 no. Remote Radio Heads RRH's and 1 no. GPS module

    23 Feb 2023 338m away Telecoms
  • 23/01158/FUL Granted

    Former Snibston Discovery Park Ashby Road Coalville LE67 3JX

    Erection of a temporary sales centre with associated landscaping, access and parking

    6 Sep 2023 400m away Full applications

In North West Leicestershire

  • 26/00678/FUL Granted

    1-3 Bottom Road Griffydam Coalville Leicestershire LE67 8HB

    Subdivision of existing dwelling to create two dwellings and associated fenestration alterations

    21 May 2026 Full applications
  • 25/01486/FUL Granted

    Unit 11C Sills Road Castle Donington Derby DE74 2US

    Erection of 2no. canopies to side of industrial building to be used as additional storage for the adjacent unit

    24 Oct 2025 Full applications
  • 26/00696/FUL Granted

    20 Meadow Crescent Castle Donington Derby DE74 2LX

    Erection of single storey rear extension

    27 May 2026 Full applications
  • 26/00686/FUL Withdrawn

    5 Blackwood Coalville Leicestershire LE67 4RG

    Demolition of a single-storey rear extension and erection of a two-storey and single-storey rear extension, erection of a two-storey front and side extension, erection of a single-storey side and front extension (garage) and porch, increasing the ridge height of the main dwellinghouse by 0.5 metres and changes to materials and fenestration

    23 May 2026 Full applications
  • 26/00569/FUL Granted

    10 Bedford Close Kegworth Derby DE74 2EA

    Change of use to mixed residential and dog grooming business operating from garage including associated external works

    29 Apr 2026 Full applications