Planning application
Donington Park Service Area Junction 23A Ashby Road Castle Donington Derby DE74 2TN
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Display of an internally illuminated advertisement sign (Moto) on the building and display of an internally illuminated free standing totem sign
As published by the council, reference 21/01927/ADC
Application record
- Reference
- 21/01927/ADC
- Type
- Advertisement Consent
- Status
- Decided
- Decision
- Application Permitted
- Received
- 6 Oct 2021
- Validated
- 11 Oct 2021
- Decided
- 2 Dec 2021
- Ward
- Long Whatton & Diseworth
- Parish
- Long Whatton & Diseworth
- Decision by
- Delegated Decision
- Postcode
- DE74 2TN
Site history
Applications at this address on the North West Leicestershire register
This site has had 3 applications since 2021: 3 approved, 0 refused.
-
23/01712/FULM Granted
Donington Park Service Area Junction 23A Ashby Road Castle Donington Derby DE74 2TN
The construction and operation of a ground-mounted solar farm with a generation capacity of 7.15MW together with access, landscaping and associated infrastructure
-
23/01673/FUL Granted
Donington Park Service Area Junction 23A Ashby Road Castle Donington Derby DE74 2TN
Retention of electric vehicle charging hub with associated works (part retrospective) and installation of a further 6 no. bay electrical charging hub
Timeline
Dates from the published record
-
6 Oct 2021
Received by North West Leicestershire
-
11 Oct 2021
Validated
Checked as complete and ready for consideration.
-
2 Dec 2021
Decision issued: Application Permitted
-
6 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Lincoln
25 applications on PlanIndex · across 14 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
North West Leicestershire granted permission on 2 December 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About advertisement consent applications
Advertisement consent is judged on two things only: amenity and public safety, not competition or other planning considerations. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Donington Park Service Area Junction 23A Ashby Road Castle Donington Derby DE74 2TN
Retention of electric vehicle charging hub with associated works (part retrospective) and installation of a further 6 no. bay electrical charging hub
Granted Full applications 18 docs -
Moto Donington Park M1 Junction 23A Castle Donington Derby DE74 2TN
Prior notification application for the installation of 271 roof mounted solar panels and associated equipment
Granted 19 docs -
Land At Moto Donington Park M1 Junction 23A Derby East Midlands DE74 2TN
EIA screening opinion for a proposed solar photovoltaic (PV) solar farm
Decided Outline 3 docs -
Donington Park Service Area Junction 23A Ashby Road Castle Donington Derby DE74 2TN
The construction and operation of a ground-mounted solar farm with a generation capacity of 7.15MW together with access, landscaping and associated infrastructure
Granted Full applications 140 docsMajor scheme -
EM Point Finger Farm Site J23A M1 Castle Donington
Erection of 3 no. office buildings, access, car parking, landscaping and associated works approved under planning permission ref. 18/02227/FULM without complying with Conditions 2, 8, 12, 15, 17, 18 and 24 so as to allow for amended site and floor levels, amended site layout, amended aviation impact mitigation measures, an alternative timescale for submission and approval of access details, amended provisions for the submission of lighting risk to highway assessments, amended timescales for submission of highways boundary treatment details, and amended tree and hedgerow protection measures
Granted Amendments Trees 44 docs -
EM Point Finger Farm Site J23A M1 Castle Donington
The approval of details reserved by condition 26 (Construction Surface Water) relating to planning permission ref: 18/02227/FULM
Granted Conditions 12 docs
Other advertisement consent applications
In North West Leicestershire
-
26/00825/ADC Granted
National Westminster Bank 54 Market Street Ashby De La Zouch Leicestershire LE65 1AN
Display of 1 no. non illuminated fascia sign, 1 no. non illuminated projecting sign, 1 no. internally illuminated directory of services inside the unit, 1 no. banking hub opening hours, 1 no. CCTV sign and 1 no. automatic door sign.
-
26/00679/ADC Granted
Hilltop Industrial Unit Tara Street Coalville Leicestershire LE67 1TW
Display of 6no. non-illuminated freestanding signs
-
26/01054/ADC Awaiting decision
PWC Ground Floor West Wing Donington Court Herald Way East Midlands Airport Castle Donington Derby Leicestershire DE74 2UZ
Display of 2no. illuminated individual lettering to fascia to replace existing logo signage on northern and southern elevations
-
26/00774/ADC Granted
Hermitage Park Hotel Whitwick Road Coalville Leicestershire LE67 3FA
Retention of 1 no. non-illuminated, free standing double-sided post mounted sign (retrospective)
-
26/00986/ADC Awaiting decision
Former Art Forma Building Station Road Castle Donington DE74 2NU
Display of 1no. wall mounted LED digital display and advertising board