Planning application
2 Carling Close Coalville Leicestershire LE67 4EP
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a replacement single storey rear extension
As published by the council, reference 21/00387/FUL
Application record
- Reference
- 21/00387/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 5 Mar 2021
- Validated
- 5 Mar 2021
- Decided
- 12 Apr 2021
- Ward
- Coalville East
- Parish
- Coalville
- Decision by
- Delegated Decision
- Postcode
- LE67 4EP
Timeline
Dates from the published record
-
5 Mar 2021
Received by North West Leicestershire
-
12 Apr 2021
Decision issued: Application Permitted
-
24 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Rosenthal Architectural Services Agent, an architecture practice
118 applications on PlanIndex · across 10 councils · 95% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North West Leicestershire granted permission on 12 April 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
48 Long Lane Coalville Leicestershire LE67 4DZ
Erection of two storey rear extension
Granted Full applications Extension 14 docs -
28 Long Lane Coalville Leicestershire LE67 4DZ
Works to Hybrid black poplar to pollard back to previous pollard head (Protected by Tree Preservation Order)
Granted Trees 4 docs -
5 Stimpson Road Coalville Leicestershire LE67 4EN
Works to 1no. Oak tree (Protected by Tree Preservation Order)
Granted Trees 2 docs -
39 Long Lane Coalville Leicestershire LE67 4DZ
Works to one Poplar tree (Protected by TPO)
Granted Trees 1 doc -
Land To The South West Of Stephenson Way Coalville Leicestershire LE67 4DZ
Felling on 1no. Poplar and works to 2no. Poplars (Protected by Tree Preservation Order)
Decided Trees 3 docs -
Land Off Long Lane Coalville Leicestershire
Works to 2no. Poplars (Protected by Tree Preservation Order)
Granted Trees 3 docs
Other full applications
In North West Leicestershire
-
26/00779/FUL Granted
Greystones 34 Upper Packington Road Ashby De La Zouch Leicestershire LE65 1EF
Alterations to 2no. existing dormers on front and side elevations and insertion of 1no. dormer on rear elevation
-
26/00832/FUL Granted
81 Meadow Lane Coalville Leicestershire LE67 4DN
Demolition of existing store and workshop and erection of two storey rear extension
-
26/01055/FUL Granted
Shippenstone Mill Street Packington Ashby De La Zouch Leicestershire LE65 1WN
Retention of an electrical car charging point located on an existing brick pillar to the frontage of the main dwellinghouse (Retrospective Application)
-
26/00625/FUL Granted
2A School Lane Newton Burgoland Coalville Leicestershire LE67 2SL
Conversion and extension of existing detached outbuilding to provide for residential annexe accommodation
-
26/00905/FUL Granted
Windrush 3 Hall Gardens Hemington Derby Leicestershire DE74 2RU
Replacement of existing glazed conservatory roof with tile roof