Skip to content
PlanIndex Get alerts
Menu

Planning application

140 Meadow Lane Coalville Leicestershire LE67 4DP

Granted North West Leicestershire 21/00107/FUL Full Application

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a first floor side extension, two storey rear extension and external alterations

As published by the council, reference 21/00107/FUL

Application record

Reference
21/00107/FUL
Type
Full Application
Status
Decided
Decision
Granted As published: Application Permitted
Received
18 Jan 2021
Validated
18 Jan 2021
Decided
22 Feb 2021
Ward
Castle Rock
Parish
Coalville
Decision by
Delegated Decision
Postcode
LE67 4DP

Site history

Applications at this address on the North West Leicestershire register

This site has had 4 applications since 2020: 3 approved, 0 refused.

  • 26/01020/FUL Awaiting decision

    140 Meadow Lane Coalville Leicestershire LE67 4DP

    Proposed rendering to the dwellinghouse and retention of a single-storey rear extension (part retrospective)

    Submitted 7 Aug 2026 Full applications
  • 21/02295/FUL Granted

    140 Meadow Lane Coalville Leicestershire LE67 4DP

    Erection of a two storey side extension and other external alterations

    Decided 16 Feb 2022 Full applications
  • 20/01266/FUL Granted

    140 Meadow Lane Coalville Leicestershire LE67 4DP

    Erection of first floor extension and external alterations

    Decided 3 Nov 2020 Full applications

Timeline

Dates from the published record

  1. 18 Jan 2021

    Received by North West Leicestershire

  2. 22 Feb 2021

    Decision issued: Application Permitted

  3. 24 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

North West Leicestershire granted permission on 22 February 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In North West Leicestershire

  • 26/00779/FUL Granted

    Greystones 34 Upper Packington Road Ashby De La Zouch Leicestershire LE65 1EF

    Alterations to 2no. existing dormers on front and side elevations and insertion of 1no. dormer on rear elevation

    Received 15 Jun, published by the council 22 Jul 2026 Full applications
  • 26/00832/FUL Granted

    81 Meadow Lane Coalville Leicestershire LE67 4DN

    Demolition of existing store and workshop and erection of two storey rear extension

    Received 25 Jun, published by the council 22 Jul 2026 Full applications
  • 26/01055/FUL Granted

    Shippenstone Mill Street Packington Ashby De La Zouch Leicestershire LE65 1WN

    Retention of an electrical car charging point located on an existing brick pillar to the frontage of the main dwellinghouse (Retrospective Application)

    Received 14 Aug, published by the council 24 Aug 2026 Full applications
  • 26/00625/FUL Granted

    2A School Lane Newton Burgoland Coalville Leicestershire LE67 2SL

    Conversion and extension of existing detached outbuilding to provide for residential annexe accommodation

    Received 8 May, published by the council 22 Jul 2026 Full applications
  • 26/00905/FUL Granted

    Windrush 3 Hall Gardens Hemington Derby Leicestershire DE74 2RU

    Replacement of existing glazed conservatory roof with tile roof

    Received 14 Jul, published by the council 13 Aug 2026 Full applications