Proposal

Development of a 349.9 MW Battery Energy Storage System with associated infrastructure including access road for construction

As published by the council, reference PAP/2021/0473

Application record

Reference
PAP/2021/0473
Status
Permitted
Decision
Granted
Received
3 Aug 2021
Validated
5 Aug 2021
Decided
4 Mar 2022
Ward
Curdworth
Parish
Curdworth
Decision by
Planning & Development Board

Site history

Applications at this address on the North Warwickshire register

This site has had 3 applications since 2021: 3 approved, 0 refused.

  • DOC/2022/0109 Granted

    Land east and south east of Dunton Hall Kingsbury Road Curdworth

    Approval of details required by conditions 7 (Construction Management Plan) of planning permission PAP/2021/0473 dated 04/03/2022.

    Decided 10 Jul 2023 Conditions
  • DOC/2022/0095 Granted

    Land East and South East Of Dunton Hall Kingsbury Road Curdworth

    Application to discharge conditions 10 (Ecology) and 20 (Surface Water Management) of Planning Permission PAP/2021/0473 dated 4 March 2022

    Decided 10 Oct 2023 Conditions

Timeline

Dates from the published record

  1. 3 Aug 2021

    Received by North Warwickshire

  2. 5 Aug 2021

    Validated

    Checked as complete and ready for consideration.

  3. 4 Mar 2022

    Decision issued: Granted

  4. 14 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

5 later applications on the register refer to this one:

  • 2026/0614/NMA Decided

    Land East of Dunton Hall Kingsbury Road Curdworth

    Non Material Amendment of application PAP/2025/0372 (Application to vary condition(s) 1 (plans), 6 (CMP) 7(colour of containers etc), 8 (finished floor levels), 10(lighting), 12(drainage scheme), 16 (bunds) 17 (LEMP), 18 (water supplies), 19(maintenance), 20(dust mitigation) and 21(noise mitigation) of planning permission PAP/2025/0224 dated 19 July 2025 for Application to vary condition 3 (time limiting restriction of operational life) of Planning permission PAP/2021/0473 dated 04/03/2022 for the development of a Battery Energy Storage System with associated infrastructure including access road for construction) to allow for 2No. Additional CCTV cameras, post and rail fence & relocation of trees

    Submitted 6 Aug 2026 Amendments
  • 2026/0289/NMA Granted

    Hams Hall Battery Energy Storage System Site Kingsbury Road Curdworth B76 0BA

    Non Material Amendment of Planning Permission PAP/2025/0062 for "Proposed underground cable and ancillary electrical works to connect the Battery Energy Storage System approved under planning application ref. PAP/2021/0473 to the Hams Hall National Grid electricity substation at coordinates 419378, 292553. Works include a temporary access track to facilitate construction", dated 07/05/2025; relating to change in the description to remove reference to PAP/2021/0473 as PAP/2025/0372 is the current approval

    Decided 10 Aug 2026 Amendments
  • DOC/2022/0110 Granted

    Land to the east and south east of Dunton Hall Kingsbury Road Curdworth

    Approval of details required by conditions 8 (colour of equipment) and 9 (floor levels) of planning permission PAP/2021/0473 dated 04/03/2022.

    Decided 20 Sep 2023 Conditions
  • DOC/2022/0109 Granted

    Land east and south east of Dunton Hall Kingsbury Road Curdworth

    Approval of details required by conditions 7 (Construction Management Plan) of planning permission PAP/2021/0473 dated 04/03/2022.

    Decided 10 Jul 2023 Conditions
  • DOC/2022/0095 Granted

    Land East and South East Of Dunton Hall Kingsbury Road Curdworth

    Application to discharge conditions 10 (Ecology) and 20 (Surface Water Management) of Planning Permission PAP/2021/0473 dated 4 March 2022

    Decided 10 Oct 2023 Conditions

Documents

Plans, drawings, consultee responses and the officer's report

48 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

North Warwickshire granted permission on 4 March 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on North Warwickshire's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles