Planning application
Land South West Of M42 Roundabout Watling Street Dordon
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of new aluminium framed warehouse on the existing service yard
As published by the council, reference PAP/2021/0108
Application record
- Reference
- PAP/2021/0108
- Status
- Permitted
- Decision
- Granted
- Received
- 25 Feb 2021
- Validated
- 23 Jul 2021
- Decided
- 5 Oct 2021
- Ward
- Dordon
- Parish
- Dordon
- Decision by
- Delegated
Timeline
Dates from the published record
-
25 Feb 2021
Received by North Warwickshire
-
23 Jul 2021
Validated
Checked as complete and ready for consideration.
-
5 Oct 2021
Decision issued: Granted
-
25 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
DOC/2022/0002 Granted
Land South West Of M42 Roundabout Watling Street Dordon Warwickshire
Approval of details required by conditions no 3, 4, 5, 6 and 7 of planning permission PAP/2021/0108 - dated 05/10/2021 relating to construction environmental management plan, ground floor structures, method statement, timing of works related to HS2, and external materials
Documents
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
North Warwickshire granted permission on 5 October 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on North Warwickshire's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Land South West Of M42 Roundabout Watling Street Dordon Warwickshire
Approval of details required by conditions no 3, 4, 5, 6 and 7 of planning permission PAP/2021/0108 - dated 05/10/2021 relating to construction environmental management plan, ground floor structures, method statement, timing of works related to HS2, and external materials
Granted Conditions 10 docs -
Unit 2 Tamworth Logistics Park Rowan Way Dordon Tamworth B78 2FE
Advertisement consent for illuminated sign
Granted 7 docs -
Proposed Telecommunications Mast At Land 15 Metres South Of Unit 2 Tamworth Logistics Park Trinity Road Dordon
Prior approval telecommunications installation for proposed 18.0m: Proposed slim line phase 8 monopole c/w wraparound cabinet at base, 3no. additional ancillary equipment cabinets and associated ancillary works
Granted 8 docs -
DSV (former DB Schenker) 2 Unit B, Centurion Way Wilnecote Tamworth B77 5PN
Application for Advertisement Consent for 2no. x Built-up halo illuminated logos finished blue on front and rear elevation. 1x Totem sign non-illuminated at the entrance. Removal of 1x sign above entrance door.
Granted Advertising 6 docs -
Tamworth South Premier Travel Inn Centurion Way Wilnecote Tamworth Staffordshire B77 5PN
98% historically approved · decision due ~19 Jun
Demolition of an existing hotel restaurant, conversion of three hotel bedrooms into a food facility, a two storey extension to create additional hotel bedrooms, alterations to car park and associated works
Awaiting decision Full applications Extension Demolition 5 docs -
D B Schenker Centurion Park Centurion Way Wilnecote Tamworth B77 5PN
Advertisement Consent : 2 internally illuminated fascia signs and 1 totem sign
Granted Advertising 1 doc