Planning application
Land 225m South Of Lakeside Industrial Park Marsh Lane Water Orton
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Resubmission - Change of use from greenbelt to grazing including a block of stables with tack and store. Land to be divided using temporary cattle fencing
As published by the council, reference PAP/2018/0661
Application record
- Reference
- PAP/2018/0661
- Status
- Permitted
- Decision
- Granted
- Received
- 6 Nov 2018
- Validated
- 5 Dec 2018
- Decided
- 2 Jan 2020
- Ward
- Water Orton
- Parish
- Water Orton
- Decision by
- Delegated
Site history
Applications at this address on the North Warwickshire register
This site has had 4 applications since 2017: 3 approved, 0 refused.
-
MIA/2019/0030 Granted
Land 225m South Of Lakeside Industrial Park Marsh Lane Water Orton
Non material amendment to PAP/2016/0420 (PAP/2018/0226) dated 24/10/2016 for the welfare cabin to be erected to faciliate preliminary engineering works
-
PAP/2018/0226 Granted
Land 225m South Of Lakeside Industrial Park Marsh Lane Water Orton
Variation of condition no: 2 of planning permission ref PAP/2016/0420 relating to electrical substation; in respect of gas fuelled capacity mechanism embedded generation plant to support the National Grid
-
PAP/2017/0652 Withdrawn
Land 225m South Of Lakeside Industrial Park Marsh Lane Water Orton
Erection of block of 10 stables and temporary cattle fencing
Timeline
Dates from the published record
-
6 Nov 2018
Received by North Warwickshire
-
5 Dec 2018
Validated
Checked as complete and ready for consideration.
-
2 Jan 2020
Decision issued: Granted
-
17 Nov 2026
Added to PlanIndex
Documents
16 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
North Warwickshire granted permission on 2 January 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on North Warwickshire's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Land 225m South Of Lakeside Industrial Park Marsh Lane Water Orton
Erection of block of 10 stables and temporary cattle fencing
Withdrawn 7 docs -
28 George Road Water Orton Birmingham B46 1PE
Prior Approval for single storey rear extension 5.165M with a flat roof extension
Granted Prior approval Extension 4 docsSmall domestic -
Land 225m South Of Lakeside Industrial Park Marsh Lane Water Orton
Non material amendment to PAP/2016/0420 (PAP/2018/0226) dated 24/10/2016 for the welfare cabin to be erected to faciliate preliminary engineering works
Granted Amendments 6 docs -
Land 225m South Of Lakeside Industrial Park Marsh Lane Water Orton
Variation of condition no: 2 of planning permission ref PAP/2016/0420 relating to electrical substation; in respect of gas fuelled capacity mechanism embedded generation plant to support the National Grid
Granted 16 docs -
11 George Road Water Orton Birmingham B46 1PF
Proposed first floor side extension and new porch to existing front door
Granted Extension 7 docsSmall domestic -
6 George Road Water Orton B46 1PE
Remove existing timber outbuilding and conservatory, and replace with ground floor single storey extension
Granted Extension 7 docsSmall domestic