Planning application

6 Ramsden Road Mancetter CV9 1PB

Granted North Warwickshire MIA/2018/0038 Amendment

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Non material amendment to PAP/2018/0297 dated 03/07/2018 for amendments to front door location, blocking up existing front door and amendment of rear window to door

As published by the council, reference MIA/2018/0038

Application record

Reference
MIA/2018/0038
Type
Amendment
Status
Permitted
Decision
Granted
Received
6 Dec 2018
Validated
12 Dec 2018
Decided
13 Dec 2018
Ward
Atherstone South and Mancetter
Parish
Mancetter
Decision by
Delegated
Postcode
CV9 1PB

Site history

Applications at this address on the North Warwickshire register

This site has had 2 applications since 2018: 2 approved, 0 refused.

  • PAP/2018/0297 Granted

    6 Ramsden Road Mancetter CV9 1PB

    Two storey side extension

    Decided 4 Jul 2018

Timeline

Dates from the published record

  1. 6 Dec 2018

    Received by North Warwickshire

  2. 12 Dec 2018

    Validated

    Checked as complete and ready for consideration.

  3. 13 Dec 2018

    Decision issued: Granted

  4. 17 Nov 2026

    Added to PlanIndex

Documents

3 documents on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What this grant of permission means

North Warwickshire granted permission on 13 December 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 6 Ramsden Road Mancetter CV9 1PB

    PAP/2018/0297 Submitted 10 May 2018 50 yards away

    Two storey side extension

    Granted Extension 6 docs
  • 8 Ramsden Road Mancetter CV9 1PB

    2026/0783/HH Submitted 5 Oct 2026 50 yards away

    Two storey and single storey rear extension with Juliet balcony at first floor rear

    Decided Householder Extension 2 docs
    Small domestic
  • 21 Mancetter Road Mancetter Atherstone CV9 1NZ

    PAP/2018/0671 Submitted 9 Nov 2018 50 yards away

    Detached workshop. Two storey bays to front elevation. Replacement porch

    Granted Extension 7 docs
    Small domestic
  • 21 Mancetter Road Atherstone CV9 1NZ

    MIA/2019/0002 Submitted 11 Jan 2019 50 yards away

    Non material amendment to PAP/2016/0307 dated 28/06/2016 for single door and window to garage

    Granted Amendments Windows or glazing 4 docs
  • 17 St Peters Road Mancetter CV9 1NQ

    PAP/2021/0383 Submitted 24 Jun 2021 100 yards away

    Single and two storey rear extension

    Granted Householder Extension 7 docs
    Domestic
  • 18 St Peters Road Mancetter CV9 1NQ

    PAP/2021/0384 Submitted 24 Jun 2021 100 yards away

    Single and two storey rear extension

    Granted Householder Extension 7 docs
    Domestic

In North Warwickshire

  • 2026/0860/NMA Decided

    Charity Farm Castle Road Hartshill CV10 0LX

    Non Material Amendment to PAP/2026/0076 (Existing outbuilding conversion into habitable rooms. Including covered external canopy walkway) to allow for covered external canopy walkway

    Received 16 Nov, published by the council 19 Nov 2026 Amendments
  • 2026/0774/NMA Granted

    Coleshill Manor Campus South Drive Coleshill B46 1DF

    Non-material amendment to PAP/2019/0496 (Recreational surfing centre and associated infrastructure) to amend plans approved under Condition 2 to reflect amendments to the lagoon, landscaping, lighting, events space, excavation, boundary treatment, building layout, servicing access and associated amendments

    Received 5 Oct, published by the council 6 Oct 2026 Amendments
  • 2026/0567/NMA Granted

    Glentworth Blythe Road Coleshill B46 1AH

    Application for a Non-Material Amendment for PAP/2023/0365 (Raising the roof of the property to include two storey extensions to front and rear)

    Received 31 Jul, published by the council 8 Aug 2026 Amendments
  • 2026/0722/NMA Granted

    Fern Cottage Spring Hill New Arley Arley CV7 8FF

    Non-material amendment to permission PAP/2025/0420 (Rear two storey extension with glazed apex. Side first floor extension over existing single storey kitchen. Garage demolition and reconstruction. New larger window in existing opening to front elevation) To allow for pitched roof over approved garage

    Received 16 Sep, published by the council 21 Sep 2026 Amendments
  • 2026/0507/NMA Granted

    Britannia Works Coleshill Road Atherstone CV9 2AA

    Non Material Amendment of permission PAP/2025/0501 (Application for variation of condition (2) of Planning Permission PAP/2022/0402 (Listed Building Consent) dated 08/09/2022 for "Variation and removal of conditions of Planning Permission PAP/2019/0180 - Variation conditions - 2, 4, 13, 21 and 24 Removal - 7, 9 and 10, relating to plans and works and listed building requirements", relating to plans and works and listed building requirements) For omission of Staircase 2 (adjacent to the Maid of the Mill public house, reconfiguration of the internal layout of apartments 06, 14, 34 and 54 from 1Bed to 2Bed units, provision of additional storerooms on each floor. Stair cores 3 and 4 reconfigured in response to the fire comments. Roofline to north-east elevation adjusted to accommodate covered balconies to apartments 61, 62, 64 and 65 located on third floor. Minor external and internal alterations, including addition of a window to the ground-floor communal lounge, external doors to dining room, and mirroring of assisted bathroom and staff rooms to align with the structural walls above

    Received 7 Jul, published by the council 17 Nov 2026 Amendments