Planning application
Hs2 Lichfield Road Embankment And Gilson Cutting Including Footpath M62 Overbridge Lichfield Road Coleshill
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising: Engineering earthworks to form a railway embankment (Lichfield Road Embankment) and a railway cutting (Gilson Cutting), construction of a footpath overbridge (Footpath M62 Overbridge) and ancillary works including earthworks to form maintenance access tracks and vehicle access tracks, a footpath diversion, drainage earthworks to form ditches and a balancing pond, provision of pre-cast concrete cascades, provision of pre-cast concrete noise barriers, provision of permanent areas for vehicle parking and location of permanent fencing.
As published by the council, reference HS2/2024/0008
Application record
- Reference
- HS2/2024/0008
- Type
- High Speed Rail (London-West Midlands) Act 2017 Schedule 17 Application
- Status
- Application Approved
- Decision
- Granted As published: Granted Subject to Conditions
- Received
- 31 May 2024
- Validated
- 31 May 2024
- Decided
- 17 Jan 2025
- Ward
- Water Orton
- Parish
- Coleshill
- Decision by
- Delegated
Timeline
Dates from the published record
-
31 May 2024
Received by North Warwickshire
-
17 Jan 2025
Decision issued: Granted Subject to Conditions
-
28 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
33 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North Warwickshire granted permission on 17 January 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on North Warwickshire's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Land 40 Metres West Of 20 And 21 Chattle Hill Lichfield Road Coleshill
Hedgerow removal of 20 metres
Granted Trees 6 docs -
Gilson Hall Meadowbank Drive Coleshill Warwickshire B46 1LF
Heritage Agreement Method Statement for Monitoring the Impact of Movement and Vibration to Gilson Hall
Granted 4 docs -
Hs2 Phase One Enabling Works Area North Gilson Road Gr01 Site Gilson Road Coleshill Warwickshire
Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to earthworks associated with the modification of an existing pond into two separate ecological mitigation ponds and the creation of two additional ecological mitigation ponds, the location of post and rail fencing and two gates.
Granted 13 docs -
5 Chattle Hill Coleshill B46 1LB
Prior Notification of Larger Home Extension: Remove 5m timber element of existing 8 metre extension and replace with 3m single storey brick extention resulting in total 6m extension
Granted Prior approval Extension 9 docsSmall domestic -
Land adjacent 27a Roman Way Coleshill B46 1HQ
Construction of two storey office block use class (E(g)(i))
Granted Full applications 16 docs -
James Munday Rise Lichfield Road Grimstock Hill Coleshill B46 1LE
Approval of details required by condition no - 3, 4 and 5 of planning permission PAP/2016/0723 dated 19/06/2017 relating to contamination
Refused Conditions 8 docs