Planning application
Hs2 Phase One Enabling Works Area North Birmingham Interchange Station Area C Site Sd61 Chester Road
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
HS2 - Development authorised by the High Speed Rail. Provision of a single ecological mitigation pond and two associated reptile basking banks
As published by the council, reference HS2/2019/0002
Application record
- Reference
- HS2/2019/0002
- Status
- Permitted
- Decision
- Granted
- Received
- 18 Jul 2019
- Validated
- 22 Jul 2019
- Decided
- 16 Sep 2019
- Ward
- Fillongley
- Parish
- Great Packington
- Decision by
- Delegated
Site history
Applications at this address on the North Warwickshire register
This site has had 2 applications since 2019: 2 approved, 0 refused.
-
HS2/2020/0006 Granted
Hs2 Phase One Enabling Works Area North Birmingham Interchange Station Area C Site Sd61 Chester Road
HS2 Schedule 17 application - Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to the realignment and widening of A452 Chester Road north and south entry (Stonebridge Island), diversion of Hollywell Brook watercourse/construction of new culvert, construction of one culvert on the A446/A452, A452 Chester Road Station Access Underbridge and proposed overbridge at the A45 over the River Blythe
Timeline
Dates from the published record
-
18 Jul 2019
Received by North Warwickshire
-
22 Jul 2019
Validated
Checked as complete and ready for consideration.
-
16 Sep 2019
Decision issued: Granted
-
6 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North Warwickshire granted permission on 16 September 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on North Warwickshire's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Hs2 Phase One Enabling Works Area North Birmingham Interchange Station Area C Site Sd61 Chester Road
HS2 Schedule 17 application - Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to the realignment and widening of A452 Chester Road north and south entry (Stonebridge Island), diversion of Hollywell Brook watercourse/construction of new culvert, construction of one culvert on the A446/A452, A452 Chester Road Station Access Underbridge and proposed overbridge at the A45 over the River Blythe
Granted 25 docs -
Land To The West Of A452 Comprising The Former Stonebridge Quarry Coventry Road Solihull
Full (detailed) planning consent for: the erection of a multistorey car park (3950 spaces), surface level car park (550 spaces) with associated access and landscaping (MSCP1). The erection of a surface level car park with associated access and landscaping (550 spaces) on a temporary basis for the duration of MSCP2 construction period. Outline planning consent for: the erection of a multistorey car park (MSCP2) (maximum 3500 spaces). All matters reserved except for access, scale and landscaping.
Granted Full applications 182 docsMajor scheme