Planning application
Packington Hall Birmingham Road Meriden CV7 7HF
Relates to PAP/2021/0554
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application to discharge conditions 4 (materials) , 5 (external finishes), 8 (method statement), 12 (bat survey) and 13 (bat mitigation measures) of planning permission PAP/2021/0554 dated 20/07/2022
As published by the council, reference DOC/2024/0074
Application record
- Reference
- DOC/2024/0074
- Type
- Details Reserved by Condition Application
- Status
- Application Approved
- Decision
- Granted As published: Granted Subject to Conditions
- Received
- 30 Oct 2024
- Validated
- 30 Oct 2024
- Decided
- 20 Feb 2025
- Ward
- Fillongley
- Parish
- Great Packington
- Decision by
- Delegated
- Postcode
- CV7 7HF
Site history
Applications at this address on the North Warwickshire register
This site has had 3 applications since 2021: 3 approved, 0 refused.
-
PAP/2021/0555 Granted
Packington Hall Birmingham Road Meriden CV7 7HF
Listed Building Consent for dismantling of the 1960's and 1970's northern extension and replacement of a single storey extension
-
PAP/2021/0554 Granted
Packington Hall Birmingham Road Meriden CV7 7HF
Dismantling of the 1960's and 1970's northern extension and replacement of a single storey extension
Timeline
Dates from the published record
-
30 Oct 2024
Received by North Warwickshire
-
20 Feb 2025
Decision issued: Granted Subject to Conditions
-
17 Nov 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
PAP/2021/0554 Granted
Packington Hall Birmingham Road Meriden CV7 7HF
Dismantling of the 1960's and 1970's northern extension and replacement of a single storey extension
Documents
15 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
North Warwickshire granted permission on 20 February 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Packington Hall Packington Park Meriden CV7 7HF
Application to Discharge Condition(s) 4 (materials), 5 (window/door colours, rear elevation), 10 - (repairs to north wall) and 11 (external lighting) of Listed Building Consent PAP/2021/0555 dated 20/07/2022 for Dismantling of the 1960's and 1970's northern extension and replacement of a single storey extension, relating to materials
Granted Conditions Extension Windows or glazing 13 docsSmall domestic -
Packington Hall Birmingham Road Meriden CV7 7HF
Dismantling of the 1960's and 1970's northern extension and replacement of a single storey extension
Granted Extension 26 docsSmall domestic -
Packington Hall Packington Park Meriden CV7 7HF
Listed Building Consent for demolition of single storey 1960s and 1970s northern extensions and replacement new proposed north wing. Construction of a ha ha planting bed
Granted Extension Demolition 25 docsSmall domestic -
Packington Hall Packington Park Meriden CV7 7HF
Demolition of single storey 1960s and 1970s northern extensions and replacement new proposed north wing. Construction of a ha ha planting bed
Granted Extension Demolition 27 docsSmall domestic -
-
Other condition discharge and variation applications
In North Warwickshire
-
2026/0855/DOC Decided
Hartshill Academy Church Road Hartshill CV10 0NA
Discharge of conditions 3 (Biodiversity Net Gain), 4(Construction Ecological Management Plan(CEMP) & 5 Construction Management Plan of 2026/0295/FUL - Creation of a 3G Artificial Grass Pitch (AGP) with perimeter fencing, hardstanding areas, storage container, floodlights and an access footpath
-
2026/0784/DOC Granted
Botts Green Hall Botts Green Lane Over Whitacre B46 2NZ
Discharge of conditions 17(Rainwater goods), 18(Render) & 19(Openings) of PAP/2024/0075 (Listed Building Consent for refurbishment of outbuilding and associated works)
-
2026/0573/DOC Granted
Bramble Cottage Dingle Lane Nether Whitacre B46 2EG
Discharge of conditions 6 (Landscaping) & 7 (Bin Storage) of permission PAP/2024/0189 (Demolition of existing garage block and the erection of a single self/custom build dwelling (Resubmission PAP/2023/0208))
-
2026/0749/DOC Granted
Electricity Substation Hams Lane Lea Marston B46 1AW
Discharge of pre-commencement condition 4 (Trees) for permission PAP/2025/0163 (Alteration of the access junction with Hams Lane to allow for permanent access and egress required in connection with the construction of National Grids Electricity Transmission Control)
-
2026/0701/AVC Granted
Westfields Tamworth Road Nether Whitacre B46 2DY
Section 73 application to vary condition 6 (Parking and manoeuvring) to facilitate additional access of permission PAP/2025/0063 - Subdivision of the dwelling to make two independent self-build dwellings, including conversion of existing triple garage