Planning application
The Partnership Centre Coleshill Road Atherstone CV9 1BN
Works: Windows or glazing
Relates to PAP/2021/0459
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application to discharge conditions 5 (materials), 6 (windows), 7 (landscaping) and 15 (gas boilers) of planning permission PAP/2021/0459 dated 16 December 2021
As published by the council, reference DOC/2022/0103
Application record
- Reference
- DOC/2022/0103
- Type
- Conditions
- Status
- Permitted
- Decision
- Granted As published: Details Granted
- Received
- 3 Nov 2022
- Validated
- 8 Nov 2022
- Decided
- 15 Jan 2024
- Ward
- Atherstone Central
- Parish
- Atherstone
- Decision by
- Delegated
- Postcode
- CV9 1BN
Site history
Applications at this address on the North Warwickshire register
This site has had 2 applications since 2021: 2 approved, 0 refused.
-
PAP/2021/0459 Granted
The Partnership Centre Coleshill Road Atherstone CV9 1BN
Change of use of building into No.6 apartments with associated internal and external works including new openings. Part demolition of single storey plant room.
Timeline
Dates from the published record
-
3 Nov 2022
Received by North Warwickshire
-
8 Nov 2022
Validated
Checked as complete and ready for consideration.
-
15 Jan 2024
Decision issued: Details Granted
-
23 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
PAP/2021/0459 Granted
The Partnership Centre Coleshill Road Atherstone CV9 1BN
Change of use of building into No.6 apartments with associated internal and external works including new openings. Part demolition of single storey plant room.
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North Warwickshire granted permission on 15 January 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
The Partnership Centre Coleshill Road Atherstone CV9 1BN
Change of use of building into No.6 apartments with associated internal and external works including new openings. Part demolition of single storey plant room.
Granted New dwelling Demolition 19 docsSeveral homes -
Site in Atherstone ,The Council House, South street Woolpack Way and Long Street Atherstone CV9 1DE
Works to trees in Conservation Area for crown and prune work
Granted Trees 5 docs -
Land Rear of 1 to 6 St Benedicts Close Atherstone CV9 1EP
Works to tree in Conservation Area
Granted Trees 6 docs -
8 to14 Coleshill Road Atherstone CV9 1BW
Demolition of existing three storey apartment block. Erection of six new residential apartments for affordable rent, with associated parking and landscaping
Granted New dwelling Demolition 22 docs -
8 to14 Coleshill Road Atherstone CV9 1BW
Demolition of existing three storey apartment block
Granted Demolition 9 docs -
8 to 14 Coleshill Road Atherstone CV9 1BW
Approval of details required by condition no: 3 of planning permission PAP/2019/0388 dated 24/09/2019 relating to materials schedule
Granted Conditions 6 docs
Other condition discharge and variation applications
In North Warwickshire
-
2026/0785/AVC Decided
111 Spring Hill, New Arley, Arley, CV7 8FE
Section 73A application to vary conditions 2(Approved plans) & 3(Materials) of PAP/2024/0414 (Proposal for a single storey 3 bedroom detached bungalow with double detached garage)
-
2026/0245/DOC Granted
Leaford Farm School Lane Lea Marston B76 0BW
Application to Discharge Condition 8 (Protected Species Method Statement), 10 (Windows, Doors and Materials), 12 (Nesting Boxes), 13 (Bat Mitigation), 14 (Construction management plan), 15 (External Lighting), 16 (Archaeology), 17 (Arboricultural Method Statement), of Planning Permission PAP/2024/0050 dated 16/05/2025 for Proposed development comprising conversion of 3 No. formerly agricultural buildings, including a Grade II listed building, into 3 No. residential properties, and erection of 1 No. dwellinghouse, including associated works, stopping up of highways land
-
2026/0602/AVC Granted
Blyth Lodge Blythe Road Coleshill B46 2AA
Variation of condition 2 (Approved plans) of Section 73 permission 2026/0304/AVC (Listed Building Consent for Single storey rear extension to the Grade II listed railway cottage and associated remedial works and installation of cabin)
-
2026/0589/AVC Granted
Environment Agency Lea Marston Depot Coton Road Lea Marston B76 0AB
Variation of condition 2 (Approved plans) of PAP/2025/0474 (Removal of existing office and welfare building, and toilet and shower block. Erection of replacement two-storey office and staff welfare building)
-
2026/0767/DOC Decided
Atherstone Sports Club Ratcliffe Road Atherstone CV9 1LX
Discharge of conditions 11(Community Use Agreement) & 16(Site Specific Maintenance Plan) of PAP/2022/0139 (Proposed construction of an artificial grass pitch with associated features including six 15m high floodlights for new artificial grass pitch and the grass rugby pitch; 4.5m high mesh ball stop fencing; 1.2m and 2m high pitch barriers; hard standing circulation areas; access lighting; soft landscaping; improved access and parking areas. Inlcudibng additional parking area with access from Royal Meadow Drive.)