Skip to content
PlanIndex Get alerts
Menu

Planning application

Eastwood Court Midhurst Road Benton Newcastle Upon Tyne

Awaiting decision North Tyneside 26/01416/TREECA

Works: Trees

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

T001 Pear - Remove to ground level; grind out stump for replanting. Large cavity with decay present to the SE side of the stem from approximately 0.5 to 2.5m Dieback - poor foliage. History of significant branch loss. T024 Crack Willow - Pollard down to 4-3m.Stem/limb decay. Storm damage. Prolific ivy cover. History of significant branch loss. One stem over the garages is cracked and delaminating

As published by the council, reference 26/01416/TREECA

Application record

Reference
26/01416/TREECA
Status
Awaiting decision
Received
27 Aug 2026
Validated
9 Oct 2026

Site history

Applications at this address on the North Tyneside register

This site has had 2 applications since 2026.

  • 26/01218/TPO Awaiting decision

    Eastwood Court Midhurst Road Benton Newcastle Upon Tyne

    T004 (T2) - Lime - Remove deadwood, specifically one over foot path. T023 (T13) - Crack Willow - Pollard down to 2m. Stem/limb decay. Prolific ivy cover. Unstable root plate. One stem is hung up on an adjacent Cherry. T18 (T11) - Beech- Branches hanging low; Crown raise to 4.5m, clear garage by 2m. Midhurst Road Longbenton TPO 1969 & Eastwood Court Benton TPO 1982

    Submitted 27 Aug 2026 Trees

Timeline

Dates from the published record

  1. 27 Aug 2026

    Received by North Tyneside

  2. 9 Oct 2026

    Validated

    Checked as complete and ready for consideration.

  3. 12 Oct 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 4 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    North Tyneside took a median of 56 days over the applications it decided in the last year.

What happens while it is decided

This application is with North Tyneside for determination, against a statutory target of eight weeks. Over the last year North Tyneside's median decision took 56 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on North Tyneside's portal will say. Our guide explains the common types.