Planning application
3 Quick Silver Way West Allotment Newcastle Upon Tyne NE27 0QQ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of mandatory biodiversity net gain condition of planning approval 25/01017/FULM
As published by the council, reference 26/01166/BNG
Application record
- Reference
- 26/01166/BNG
- Type
- Biodiversity Net Gain Plan (stat cond)
- Status
- Awaiting decision
- Received
- 11 Aug 2026
- Validated
- 11 Aug 2026
- Ward
- Shiremoor
- Parish
- Whitley Bay
- Decision by
- Delegated Decision
- Postcode
- NE27 0QQ
Site history
Applications at this address on the North Tyneside register
This site has had 3 applications since 2026: 1 approved, 0 refused.
-
26/01146/COND Granted
3 Quick Silver Way West Allotment Newcastle Upon Tyne NE27 0QQ
Discharge of condition 30 of planning approval 25/01017/FULM
-
26/01100/FULM Awaiting decision
3 Quick Silver Way West Allotment Newcastle Upon Tyne NE27 0QQ
Variation of Conditions 1 (Approved Plans), 5 (Noise Impact Assessment), 6 (Post-Installation Noise Testing), 10 (Parking Layout), 11 (Cycle Storage), 12 (Commercial Waste Scheme), 21 (Ground Investigation), 22 (Remediation Method Statement), 23 (Remediation Validation Report) and 24 (Phase 1 Desk Study Report) attached to planning permission 25/01017/FULM to facilitate revisions to the approved development, including omission of the approved ground floor extension and rooftop plant deck extension, retention of the existing cycle storage, provision of a detached prefabricated garage building, revised parking and servicing arrangements, relocation of waste storage and vehicle wash facilities, alterations to plant equipment and landscaping, and consequential amendments to noise, biodiversity and contamination mitigation measures. (ADDITIONAL INFO SUBMITTED: Phase 1 GI Preliminary Risk Assessment (15.09.26) & Phase 2 Ground Investigation Report (21.09.26))
Timeline
Dates from the published record
-
11 Aug 2026
Received by North Tyneside
-
13 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 6 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
North Tyneside took a median of 56 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 26/01146/COND (Decided)
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
- APPLICATION FORM
- BIODIVERSITY GAIN PLAN
- COVER LETTER
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with North Tyneside for determination, against a statutory target of eight weeks. Over the last year North Tyneside's median decision took 56 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on North Tyneside's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
3 Quick Silver Way West Allotment Newcastle Upon Tyne NE27 0QQ
Discharge of condition 30 of planning approval 25/01017/FULM
Granted Conditions 2 docs -
3 Quick Silver Way West Allotment Newcastle Upon Tyne NE27 0QQ
96% historically approved · decision due ~27 Oct
Variation of Conditions 1 (Approved Plans), 5 (Noise Impact Assessment), 6 (Post-Installation Noise Testing), 10 (Parking Layout), 11 (Cycle Storage), 12 (Commercial Waste Scheme), 21 (Ground Investigation), 22 (Remediation Method Statement), 23 (Remediation Validation Report) and 24 (Phase 1 Desk Study Report) attached to planning permission 25/01017/FULM to facilitate revisions to the approved development, including omission of the approved ground floor extension and rooftop plant deck extension, retention of the existing cycle storage, provision of a detached prefabricated garage building, revised parking and servicing arrangements, relocation of waste storage and vehicle wash facilities, alterations to plant equipment and landscaping, and consequential amendments to noise, biodiversity and contamination mitigation measures. (ADDITIONAL INFO SUBMITTED: Phase 1 GI Preliminary Risk Assessment (15.09.26) & Phase 2 Ground Investigation Report (21.09.26))
Awaiting decision Full applications Extension 23 docsMajor scheme -
4 Quick Silver Way West Allotment Newcastle Upon Tyne
Confirmation of the existing lawful use class of the site as Use Class E (Commercial, Business and Service) in accordance with revised standards (formerly Use Class B1)
Granted Lawful development 3 docs -
5 Quick Silver Way West Allotment Newcastle Upon Tyne NE27 0QQ
Installation of solar PV array to flat roof of non domestic building under Schedule 2, Part 14, Class J of the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended (please see planning statement for further details)
Granted Outline 3 docs -
Unit 15 The Silverlink North Cobalt Business Park West Allotment Newcastle Upon Tyne NE27 0QJ
Confirmation of the existing lawful use class of the site as Use Class E (Commercial, Business and Service) in accordance with revised standards (formerly Use Class B1)
Granted Lawful development 4 docs -
Quadrant East 16 The Silverlink North Cobalt Business Park West Allotment Newcastle Upon Tyne NE27 0BY
96% historically approved · decision due ~13 Nov
Installation of rooftop air source heat pumps, thermal storage vessels, associated plant, pipework, support structures, access infrastructure and roof access door in connection with the decarbonisation of the existing office building
Awaiting decision Full applications 21 docs