Skip to content
PlanIndex Get alerts
Menu

Planning application

131 Goathland Avenue Longbenton Newcastle Upon Tyne NE12 8DA

Awaiting decision North Tyneside 25/01454/FUL Full applications

Works: Extension Demolition Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of existing extension and garage. Proposed two storey side extension to create a seperate dwelling (amended plans received)

As published by the council, reference 25/01454/FUL

Application record

Reference
25/01454/FUL
Category
Full applications
Status
Awaiting decision
Received
6 Nov 2025
Validated
1 Jun 2026
Postcode
NE12 8DA

Timeline

Dates from the published record

  1. 6 Nov 2025

    Received by North Tyneside

  2. 1 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 9 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 27 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    North Tyneside took a median of 57 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with North Tyneside for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 139 Goathland Avenue Longbenton Newcastle Upon Tyne NE12 8DA

    26/01013/CLPROP Submitted 8 Jul 2026 0m away

    93% historically approved · decision due ~7 Sep

    Proposed loft conversion to the existing dwelling, including the formation of a rear dormer extension, two rooflights to the front elevation, and associated internal alterations

    Decided Extension Loft or dormer 3 docs
    Domestic
  • The Tree House Radstock Place Longbenton Newcastle Upon Tyne NE12 8DD

    26/01215/TPO Submitted 26 Aug 2026 58m away

    93% historically approved · decision due ~21 Oct

    G1 - T1 - Ash: Signs of Ash dieback but not severe, recommend height reduction of 5-6m, reduce lateral branch pointing north by 7m, south by 5m to balance crown. T2 - Ash: Signs of ash dieback but not severe, recommend crown reduce by 4-5m height inline with T1 and crown reduce East side 3.5m to balance excessive weight over neighbours property. Raise by removing lowest branch East over neighbours. Crown reduce north & South 1.5m to balance crown. The Radstock Place, Longbenton TPO 2020

    Awaiting decision Trees 3 docs
  • 1 Radstock Place Longbenton Newcastle Upon Tyne NE12 8DD

    26/00997/CLPROP Submitted 6 Jul 2026 58m away

    93% historically approved · decision due ~3 Sep

    Single storey rear extension to private dwelling

    Decided Extension 5 docs
    Small domestic
  • 42 Tenbury Crescent Longbenton NEWCASTLE UPON TYNE NE12 8BY

    19/01521/FULH Submitted 8 Nov 2019 131m away

    Single storey extension to front elevation

    Granted Householder Extension
    Small domestic
  • 19 Ringwood Green Longbenton NEWCASTLE UPON TYNE NE12 8DR

    19/01392/CLPROP Submitted 17 Oct 2019 285m away

    Attic Conversation with rear dormer window and 2no velux windows to the front

    Granted Lawful development Loft or dormer Windows or glazing
  • 38 Edenbridge Crescent Longbenton Newcastle Upon Tyne NE12 8EP

    24/01130/FULH Submitted 4 Sep 2024 290m away

    Demolition of existing outbuilding and erection of single storey rear extension

    Granted Householder Extension Demolition 11 docs
    Small domestic

In North Tyneside

  • 26/01188/FUL Awaiting decision

    60 Beverley Terrace Cullercoats Tyne And Wear NE30 4NX

    Change of use from three self contained flats into a single dwelling house, two storey and single storey rear extensions and a detached storage garage within rear yard.

    18 Aug 2026 Full applications
  • 26/01171/FUL Awaiting decision

    Flat Above The Travellers Rest Front Street Camperdown Newcastle Upon Tyne NE12 5UT

    Change of use from a two bedroom flat to five small office spaces (retrospective)

    14 Aug 2026 Full applications
  • 26/01170/FUL Awaiting decision

    11 Dukes Meadow Backworth Newcastle Upon Tyne NE27 0GD

    Change of use of agricultural land (Sui Generis) to private garden (Class C3) (retrospective)

    14 Aug 2026 Full applications
  • 26/01173/FUL Awaiting decision

    17 Dukes Meadow Backworth Newcastle Upon Tyne NE27 0GD

    Change of use of agricultural land (Sui Generis) to residential curtilage (Class C) including engineering operations comprising a localised increase in land levels to part of the lower rear garden area to create a usable terrace, together with the installation of steps linking the upper and lower garden levels

    14 Aug 2026 Full applications
  • 26/01175/FUL Awaiting decision

    Tynemouth District Scouts Centre Norfolk Street North Shields Tyne And Wear NE30 1NQ

    The change of use from district scout council headquarters (Class F.2) to offices (Class E(g)(i)), no external alterations

    14 Aug 2026 Full applications