Formica Ltd West Chirton Industrial Estate Middle Norham Road North North Shields Tyne And Wear NE29 8RE

Granted North Tyneside 24/01486/FUL full planning application non major

Works: Extension Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of condition 9 of planning approval 21/01618/FUL. No part of the new car park extension shall begin until the new means of access has been sited and laid out in accordance with the approved drawing

As published by the council, reference 24/01486/FUL

Application record

Reference
24/01486/FUL
Type
full planning application non major
Status
Decided
Decision
Application Permitted
Received
13 Nov 2024
Validated
13 Nov 2024
Decided
20 Dec 2024
Ward
New York & Murton
Parish
North Shields
Decision by
Delegated Decision
Postcode
NE29 8RE

Timeline

Dates from the published record

  1. 13 Nov 2024

    Received by North Tyneside

  2. 20 Dec 2024

    Decision issued: Application Permitted

  3. 2 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In North Tyneside

  • 26/01188/FUL Awaiting decision

    60 Beverley Terrace Cullercoats Tyne And Wear NE30 4NX

    Change of use from three self contained flats into a single dwelling house, two storey and single storey rear extensions and a detached storage garage within rear yard.

    18 Aug 2026 Full applications
  • 26/01171/FUL Awaiting decision

    Flat Above The Travellers Rest Front Street Camperdown Newcastle Upon Tyne NE12 5UT

    Change of use from a two bedroom flat to five small office spaces (retrospective)

    14 Aug 2026 Full applications
  • 26/01170/FUL Awaiting decision

    11 Dukes Meadow Backworth Newcastle Upon Tyne NE27 0GD

    Change of use of agricultural land (Sui Generis) to private garden (Class C3) (retrospective)

    14 Aug 2026 Full applications
  • 26/01173/FUL Awaiting decision

    17 Dukes Meadow Backworth Newcastle Upon Tyne NE27 0GD

    Change of use of agricultural land (Sui Generis) to residential curtilage (Class C) including engineering operations comprising a localised increase in land levels to part of the lower rear garden area to create a usable terrace, together with the installation of steps linking the upper and lower garden levels

    14 Aug 2026 Full applications
  • 26/01175/FUL Awaiting decision

    Tynemouth District Scouts Centre Norfolk Street North Shields Tyne And Wear NE30 1NQ

    The change of use from district scout council headquarters (Class F.2) to offices (Class E(g)(i)), no external alterations

    14 Aug 2026 Full applications