Skip to content
PlanIndex Get alerts
Menu

Planning application

Tanners Bank Bridge Tanners Bank North Shields Tyne And Wear

Granted North Tyneside 21/01498/MISGDO Part 18, Miscellaneous GPDO works

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Prior approval under Part 18, Class A to Schedule 2 of the General Permitted Development Order 2015 (as amended) - Replacement of Tanners Bank Bridge

As published by the council, reference 21/01498/MISGDO

Application record

Reference
21/01498/MISGDO
Type
Part 18, Miscellaneous GPDO works
Status
Decided
Decision
Application Permitted
Received
15 Jun 2021
Validated
5 Jul 2021
Decided
25 Aug 2021
Ward
Tynemouth
Parish
North Shields
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 15 Jun 2021

    Received by North Tyneside

  2. 5 Jul 2021

    Validated

    Checked as complete and ready for consideration.

  3. 25 Aug 2021

    Decision issued: Application Permitted

  4. 23 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 2 Hazeldene Court North Shields Tyne And Wear NE30 4AD

    21/01177/FUL Submitted 4 May 2021 72m away

    Variation of condition 1 (approved plans) of planning approval 18/01187/FULH - to allow walk on balcony in place of juliette balcony

    Granted Full applications 6 docs
    Major scheme
  • Old Smokehouse 3 Tanners Bank North Shields Tyne And Wear NE30 1JH

    23/00071/FUL Submitted 16 Jan 2023 104m away

    Change of use of land to provide beer garden (retrospective) and installation of a metal storage container on private land (using 1x parking bay) to be used for food delivery for Three Tanners customers (AMENDED PLANS AND PROPOSAL)

    Granted Full applications 21 docs
    Major scheme
  • 58 Donkin Terrace North Shields Tyne And Wear NE30 2HF

    24/01334/FULH Submitted 14 Oct 2024 222m away

    Single storey infill extension to the rear with lantern and flat roof. First floor extension to existing offshoot to the rear with flat roof skylight. Loft conversion with dormer to rear and 4no. rooflights to front. Replacement roof coverings front and rear and proposed timber cladding finish to the rear

    Granted Householder Extension Loft or dormer +1 8 docs
    Small domestic
  • Former M A Fabrication Solutions Tanners Bank North Shields Tyne And Wear NE30 1JH

    25/01282/FUL Submitted 6 Oct 2025 234m away

    96% historically approved · decision due ~8 Jan

    Change of use from industrial building to 18 small self contained business units (Use classes, B2, B8 and Class E) within existing unit (AMENDED DESCRIPTION)

    Awaiting decision Full applications 12 docs
    Major scheme
  • 35 Kitchener Terrace North Shields Tyne And Wear NE30 2HH

    26/01125/FUL Submitted 4 Aug 2026 259m away

    96% historically approved · decision due ~29 Sep

    Loft conversion with flat roof dormer to rear and 3no. rooflughts to front

    Awaiting decision Full applications Loft or dormer 5 docs
  • 15 East Percy Street North Shields Tyne And Wear NE30 1DT

    26/00706/FUL Submitted 15 May 2026 280m away

    96% historically approved · decision due ~27 Jul

    Change of use from business to residential dwellings. Reconfigure building internally into 4 x residential flats with rooflights to front and rear

    Awaiting decision Full applications New dwelling Loft or dormer

In North Tyneside

  • 26/00922/DEMGDO Granted

    Maintenance Hut Rising Sun Country Park Whitley Road Benton Newcastle Upon Tyne

    Demolition of delipidated structure including grubbing up founds and making good hardstanding

    24 Jun 2026 Outline
  • 23/00480/OUT Granted

    Land Adjacent To Killingworth Lane Killingworth Newcastle Upon Tyne

    Outline planning application (all matters reserved except access) for the erection of up to 270 dwellings and associated access, landscape and infrastructure.

    11 Apr 2023 Outline
  • 25/00520/OUT Awaiting decision

    Unit 27 Planet Place Stephenson Industrial Estate Killingworth Newcastle Upon Tyne NE12 6DY

    Outline planning permission for the demolition of the existing building to accommodate the development of a Battery Energy Storage Facility (BESS) and associated infrastructure. All matters reserved other than access.

    16 Apr 2025 Outline
  • 24/01437/PRIOTH Granted

    86 - 90 Park View Whitley Bay Tyne And Wear NE26 3RA

    Prior Approval application for the conversion of existing bank building to provide a mix use of commercial space on ground and first floors, a self- contained maisonette on the first floor (above existing ground floor shop unit) and a second floor flat above the first floor commercial space

    5 Nov 2024 Outline
  • 24/01458/GDO Granted

    Linskill Centre Linskill Terrace North Shields Tyne And Wear NE30 2AY

    Installation of photovoltaic panels to roof

    8 Nov 2024 Outline