Planning application

Vacant Land To The North And South Tynemouth Metro Station Building To The East Of The Metroline Tynemouth Tyne And Wear

Granted North Tyneside 20/00136/FUL full planning application non major

Works: Demolition Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Mixed use scheme comprising 130 sqm Class E unit and 71no. one, two and three bedroom residential units with 43 car parking spaces, cycle parking, public realm improvement and landscaping on land to the south of Tynemouth Station; new access from Tynemouth Road; partial demolition of the stone perimeter wall to Tynemouth Road; and car parking on land to the north of Tynemouth Station; widening of access from Station Terrace (AMENDED). (ADDITIONAL ECOLOGY REPORTS).

As published by the council, reference 20/00136/FUL

Application record

Reference
20/00136/FUL
Type
full planning application non major
Status
Decided
Decision
Granted As published: Application Permitted
Received
30 Jan 2020
Validated
30 Jan 2020
Decided
21 Oct 2022
Ward
Tynemouth
Parish
North Shields
Decision by
Committee Decision

Site history

Applications at this address on the North Tyneside register

This site has had 4 applications since 2020: 2 approved, 0 refused.

  • 24/01047/COND Withdrawn

    Vacant Land To The North And South Tynemouth Metro Station Building To The East Of The Metroline Tynemouth Tyne And Wear

    Discharge or condition 51 of planning approval 20/00136/FUL

    Decided 3 Dec 2024 Conditions
  • 24/01035/COND Withdrawn

    Vacant Land To The North And South Tynemouth Metro Station Building To The East Of The Metroline Tynemouth Tyne And Wear

    Discharge of condition 3 of planning approval 20/00137/LBC

    Decided 3 Dec 2024 Conditions
  • 20/00137/LBC Granted

    Vacant Land To The North And South Tynemouth Metro Station Building To The East Of The Metroline Tynemouth Tyne And Wear

    Demolition of a section of the stone boundary wall on Tynemouth Road and Station Terrace to facilitate access to a development comprising 130sqm Class E unit and 71no. one, two and three bedroom residential units with 43 car parking spaces, cycle parking, public realm improvement and landscaping on land to the south of Tynemouth Station and car parking on land to the north of Tynemouth Station.

    Decided 30 Aug 2022 Heritage and listed buildings

Timeline

Dates from the published record

  1. 30 Jan 2020

    Received by North Tyneside

  2. 21 Oct 2022

    Decision issued: Application Permitted

  3. 2 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 24/01047/COND Withdrawn

    Vacant Land To The North And South Tynemouth Metro Station Building To The East Of The Metroline Tynemouth Tyne And Wear

    Discharge or condition 51 of planning approval 20/00136/FUL

    Decided 3 Dec 2024 Conditions
  • Application: 20/00137/LBC (Decided)

Who's behind it

Company information only, from the register and Companies House

Station Developments Ltd Applicant, a developer registered in Consett

Active · incorporated 1991 · Consett

4 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

155 documents on file for this application

  • DELEGATED REPORT Other · 07 Nov 2022
  • S106 AGREEMENT Other · 06 Nov 2022
  • APPROPRIATE ASSESSMENT Other · 06 Nov 2022
  • PROPOSED SITE ACCESS Revised Drawing · 14 Sep 2022
  • PARKING SURVEY PLAN Drawing · 14 Sep 2022
  • PROPOSED SITE ACCESS Superseded Drawing · 01 Sep 2022
  • PLAN TO SHOW HEIGHTS Drawing · 26 Aug 2022
  • PROPOSED ELEVATIONS Revised Drawing · 26 Aug 2022
  • NORTHERN CAR PARK DEMOLITION PLAN Drawing · 19 Aug 2022
  • AA Other · 17 Aug 2022
  • LANDSCAPE AND BIODIVERSITY Consultee Comment · 12 Aug 2022
  • LONG ELEVATION Drawing · 10 Aug 2022
  • BNG ASSESSMENT Report · 09 Aug 2022
  • BIODIVERSITY METRIC Other · 09 Aug 2022
  • PROPOSED ELEVATIONS Superseded Drawing · 09 Aug 2022
  • PLANTING STRATEGY Revised Drawing · 09 Aug 2022
  • BNG ASSESSMENT Superseded Drawing · 29 Jul 2022
  • BIODIVERSITY METRIC Superseded Drawing · 29 Jul 2022
  • BNG EMAIL Other · 29 Jul 2022
  • NEXUS Consultee Comment · 29 Jul 2022
  • BREEDING BIRD SURVEY Report · 28 Jul 2022
  • BUTTERFLY SURVEY Report · 28 Jul 2022
  • UPDATED ECOLOGICAL ASSESSMENT Report · 28 Jul 2022
  • RAIL INCURSION ASSESSMENT Report · 22 Jul 2022
  • SUMMARY STATEMENT Other · 11 Jul 2022
  • NEXUS Consultee Comment · 06 Jul 2022
  • PROPOSED NORTHERN CAR PARK PLAN Revised Drawing · 31 May 2022
  • KERB AND BARRIER SKETCH Drawing · 31 May 2022
  • DEMOLITION OF WALL TO TYNEMOUTH ROAD Drawing · 13 Apr 2022
  • POLICE Consultee Comment · 13 Apr 2022
  • LLFA Consultee Comment · 13 Apr 2022
  • NORTHUMBRIAN WATER Consultee Comment · 06 Apr 2022
  • DRAINAGE STRATEGY Revised Drawing · 05 Apr 2022
  • RESPONSE TO LANDSCAPE AND BIODIVERSITY COMMENTS Other · 04 Feb 2022
  • RESPONSE TO POLICE COMMENTS Other · 11 Jan 2022
  • LANDSCAPE AND ECOLOGY Consultee Comment · 24 Nov 2021
  • FINANCIAL VIABILITY ASSESSMENT SUMMARY Other · 23 Nov 2021
  • OBJECTION Committee Report · 10 Nov 2021
  • HERITAGE AND DESIGN Consultee Comment · 08 Nov 2021
  • NEXUS 1 OF 3 Consultee Comment · 04 Nov 2021
  • NEXUS 2 OF 3 Consultee Comment · 04 Nov 2021
  • NEXUS 3 OF 3 Consultee Comment · 04 Nov 2021
  • TCAMS Consultee Comment · 04 Nov 2021
  • TVA Consultee Comment · 04 Nov 2021
  • NORTHUMBERLAND AND NEWCASTLE SOCIETY Consultee Comment · 03 Nov 2021
  • ARCH Consultee Comment · 03 Nov 2021
  • POLICE AUTHORITY Consultee Comment · 02 Nov 2021
  • NATURAL ENGLAND Consultee Comment · 01 Nov 2021
  • HISTORIC ENGLAND Consultee Comment · 01 Nov 2021
  • COUNCILLOR REQUEST TO SPEAK Consultee Comment · 25 Oct 2021
  • LLFA Consultee Comment · 22 Oct 2021
  • COAL AUTHORITY Consultee Comment · 22 Oct 2021
  • TRANSPORT ASSESSMENT Report · 21 Oct 2021
  • COAL AUTHORITY Consultee Comment · 21 Oct 2021
  • NORTHUMBRIAN WATER Consultee Comment · 21 Oct 2021
  • SITE LOCATION PLAN OS Extract · 08 Oct 2021
  • SITE PLAN Revised Drawing · 08 Oct 2021
  • SITE PLAN AROUND BUILDING Revised Drawing · 08 Oct 2021
  • SITE PLAN CAR PARK Revised Drawing · 08 Oct 2021
  • LANDSCAPE CIRCULATION STRATEGY Revised Drawing · 08 Oct 2021
  • LANDSCAPE PLANTING STRATEGY Superseded Drawing · 08 Oct 2021
  • SITE SECTIONS SHEET 1 Revised Drawing · 08 Oct 2021
  • SITE SECTIONS SHEET 2 Revised Drawing · 08 Oct 2021
  • BUTTERFLY ASSESSMENT Report · 08 Oct 2021
  • BIRD NESTING ASSESSMENT Report · 08 Oct 2021
  • GROUND FLOOR PLAN Revised Drawing · 08 Oct 2021
  • SITE LOCATION PLAN OS Extract · 08 Oct 2021
  • LEVEL 01 PLAN Revised Drawing · 08 Oct 2021
  • LEVEL 02 PLAN Revised Drawing · 08 Oct 2021
  • LEVEL 03 PLAN Revised Drawing · 08 Oct 2021
  • LEVEL 04 PLAN Revised Drawing · 08 Oct 2021
  • LEVEL 05 PLAN Revised Drawing · 08 Oct 2021
  • ROOF PLAN Revised Drawing · 08 Oct 2021
  • DESIGN AND ACCESS STATEMENT Other · 08 Oct 2021
  • PROPOSED ELEVATIONS Superseded Drawing · 08 Oct 2021
  • DETAILED ELEVATION 01 Revised Drawing · 08 Oct 2021
  • DETAILED ELEVATION 02 Revised Drawing · 08 Oct 2021
  • DETAILED ELEVATION 03 Revised Drawing · 08 Oct 2021
  • DETAILED ELEVATION 04 Revised Drawing · 08 Oct 2021
  • DETAILED ELEVATION 05 Revised Drawing · 08 Oct 2021
  • BUILDING SECTIONS 01 Revised Drawing · 08 Oct 2021
  • BUILDING SECTIONS 02 Revised Drawing · 08 Oct 2021
  • HERITAGE STATEMENT Other · 08 Oct 2021
  • ARBORICULTURAL METHOD STATEMENT Report · 08 Oct 2021
  • PROPOSED SITE ACCESS PLAN Superseded Drawing · 08 Oct 2021
  • PROPOSED NORTHERN CAR PARK PLAN Superseded Drawing · 08 Oct 2021
  • TRANSPORT ASSESSMENT Superseded · 08 Oct 2021
  • TRAVEL PLAN Report · 08 Oct 2021
  • NEIGHBOURING DAYLIGHT AND SUNLIGHT REPORT Report · 08 Oct 2021
  • WITHIN DAYLIGHT AND SUNLIGHT REPORT Report · 08 Oct 2021
  • CAPITA'S VIABILITY APPRAISAL Other · 26 May 2021
  • TYNEMOUTH VILLAGE ASSOCIATION Consultee Comment · 29 May 2020
  • LLFA Consultee Comment · 07 Apr 2020
  • PLANNING STATEMENT Other · 07 Apr 2020
  • REGEN Consultee Comment · 19 Mar 2020
  • NORTHUMBERLAND AND NEWCASTLE SOCIETY Consultee Comment · 16 Mar 2020
  • DESIGN Consultee Comment · 05 Mar 2020
  • LANDSCAPE Consultee Comment · 05 Mar 2020
  • NEXUS Consultee Comment · 03 Mar 2020
  • COAL AUTHORITY Consultee Comment · 28 Feb 2020
  • ARCHAEOLOGY Consultee Comment · 27 Feb 2020
  • NOISE AND VIBRATION ASSESSMENT Report · 26 Feb 2020
  • HISTORIC ENGLAND Consultee Comment · 24 Feb 2020
  • DAYLIGHT AND SUNLIGHT ASSESSMENT Superseded · 17 Feb 2020
  • PHASE I DESK STUDY Report · 17 Feb 2020
  • POLICE Consultee Comment · 17 Feb 2020
  • NORTHUMBRIAN WATER Consultee Comment · 17 Feb 2020
  • NATURAL ENGLAND Consultee Comment · 12 Feb 2020
  • DESIGN AND ACCESS STATEMENT Superseded · 10 Feb 2020
  • TRANSPORT ASSESSMENT Superseded · 10 Feb 2020
  • TRAVEL PLAN Superseded · 10 Feb 2020
  • HERITAGE STATEMENT Superseded · 10 Feb 2020
  • COLOGICAL ASSESSMENT V2 Report · 30 Jan 2020
  • PROPOSED 2-WAY ACCESS (NORTHERN CAR PARK) Superseded Drawing · 30 Jan 2020
  • PROPOSED SITE ACCESS AT TYNEMOUTH ROAD PLAN Superseded Drawing · 30 Jan 2020
  • PROPOSED NORTHERN CAR PARK PLAN Superseded Drawing · 30 Jan 2020
  • RESIDENTIAL AND RETAIL GROUND FLOOR PLAN Superseded Drawing · 30 Jan 2020
  • RESIDENTIAL LEVEL 01 PLAN Superseded Drawing · 30 Jan 2020
  • RESIDENTIAL LEVEL 02 PLAN Superseded Drawing · 30 Jan 2020
  • RESIDENTIAL LEVEL 03 PLAN Superseded Drawing · 30 Jan 2020
  • RESIDENTIAL LEVEL 04 PLAN Superseded Drawing · 30 Jan 2020
  • RESIDENTIAL LEVEL 05 PLAN Superseded Drawing · 30 Jan 2020
  • BASEMENT GA PLAN Superseded Drawing · 30 Jan 2020
  • ROOF PLAN Superseded Drawing · 30 Jan 2020
  • ELEVATIONS Superseded Drawing · 30 Jan 2020
  • DETAILED ELEVATION 01 Superseded Drawing · 30 Jan 2020
  • DETAILED ELEVATION 02 Superseded Drawing · 30 Jan 2020
  • DETAILED ELEVATION 03 Superseded Drawing · 30 Jan 2020
  • DETAILED ELEVATION 04 Superseded Drawing · 30 Jan 2020
  • DETAILED ELEVATION 05 Superseded Drawing · 30 Jan 2020
  • BUILDING SECTIONS 01 Superseded Drawing · 30 Jan 2020
  • BUILDING SECTIONS 02 Superseded Drawing · 30 Jan 2020
  • LANDSCAPE SITE LOCATION PLAN Superseded Drawing · 30 Jan 2020
  • LANDSCAPE SITE PLAN Superseded Drawing · 30 Jan 2020
  • LANDSCAPE SITE PLAN - AREA AROUND BUILDING Superseded Drawing · 30 Jan 2020
  • LANDSCAPE SITE PLAN - CAR PARK Superseded Drawing · 30 Jan 2020
  • LANDSCAPE CIRCULATION STRATEGY Superseded Drawing · 30 Jan 2020
  • PLANTING STRATEGY Superseded Drawing · 30 Jan 2020
  • LANDSCAPE SITE SECTIONS Superseded Drawing · 30 Jan 2020
  • STATEMENT OF COMMUNITY ENGAGEMENT TYNEMOUTH FINAL Other · 30 Jan 2020
  • COMPLETE RESIDENTIAL-DWELLING-UNITS_SUPPLEMENTARY-INFORMATION-TEMPLATE Superseded · 30 Jan 2020
  • SITE LOCATION PLAN Superseded Drawing · 30 Jan 2020
  • ARBORICULTURAL IMPACT ASSESSMENT Report · 30 Jan 2020
  • BAT SURVEY REPORT Report · 30 Jan 2020
  • TYNEMOUTH REPTILE SURVEY REPORT Report · 30 Jan 2020
  • BUTTERFLY SURVEY REPORT Superseded · 30 Jan 2020
  • HABITAT REGULATIONS ASSESSMENT Report · 30 Jan 2020
  • MIX A PLANTING EMBANKMEMT Superseded · 30 Jan 2020
  • MIX B PLANTING TO FRONT OFRESIDENTIAL UNITS Other · 30 Jan 2020
  • TYNEMOUTH STATION PHASE 2 SI REPORT Other · 30 Jan 2020
  • APPLICATIONFORMREDACTED Superseded · 30 Jan 2020
  • C100 - DRAINAGE STRATEGY PLAN Superseded Drawing · 30 Jan 2020
  • COVERING LETTER Correspondence · 30 Jan 2020
  • FLOOD RISK AND DRAINAGE ASSESSMENT Other · 30 Jan 2020
  • GROUND GAS RISK ASSESSMENT Other · 30 Jan 2020

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

North Tyneside granted permission on 21 October 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In North Tyneside

  • 26/01142/FUL Decided

    6 Kirklinton Road Cullercoats Tyne And Wear NE30 3AX

    Variation of condition 1 of planning approval 25/00238/FULH - amendment to incorporate a flat roof to side extension, increase to footprint of side extension to splay along boundary, and alteration to previously approved tiled canopy to front - description amended 23.10.2026

    Received 10 Aug, published by the council 12 Aug 2026 Full applications
  • 26/01485/FUL Awaiting decision

    145 Grey Street North Shields Tyne And Wear NE30 2EQ

    Change of use from retail to 2 bedroom apartment with associated alterations to shop front and parking

    23 Oct 2026 Full applications
  • 26/01353/FUL Decided

    PaddlePod Unit 7C Mylord Crescent Camperdown Industrial Estate Camperdown Newcastle Upon Tyne NE12 5UJ

    Siting an InPost Locker

    Received 29 Sep, published by the council 1 Oct 2026 Full applications
  • 26/00923/FUL Decided

    Churchill Community College Churchill Street Wallsend Tyne And Wear NE28 7TN

    Retrospective installation of temporary classrooms(ADDITIONAL INFORMATION)

    Received 24 Jun, published by the council 21 Jul 2026 Full applications
  • 26/01054/FUL Decided

    ALDI Great Lime Road Forest Hall Newcastle Upon Tyne NE12 9EW

    Erection of air source heat pumps, erection of new store plant equipment and associated works in retrospect

    Received 17 Jul, published by the council 6 Aug 2026 Full applications