Planning application

Portishead Branch Line Between Portishead In North Somerset And Ashton Junction In Bristol

Granted North Somerset 26/P/1697/DCW

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Request to discharge Requirements 5a, 5b, 5c, 5d, 5e, 5f, 5g, 5h, 5i, 5j, 5k, 5l, 8, 9, 10, 11, 12, 13, 17, 21, 22, 23 and 29 (Royal Portbury Dock Bridleway) for stage 1 of Works Numbers: 14, 14A and 14B of the Portishead Branch Line (MetroWest Phase 1) Order 2022.

As published by the council, reference 26/P/1697/DCW

Application record

Reference
26/P/1697/DCW
Status
Decided
Decision
Granted As published: Approve (discharge condition)(RDC)
Received
17 Aug 2026
Validated
17 Aug 2026
Decided
2 Oct 2026
Parish
Portishead

Site history

Applications at this address on the North Somerset register

This site has had 13 applications since 2026: 9 approved, 0 refused.

  • 26/P/2130/DCW Awaiting decision

    Portishead Branch Line Between Portishead In North Somerset And Ashton Junction In Bristol

    Request to discharge Requirement 22 (Cattle Creep Underbridge) of Stage 4 and Works Numbers 1B (the works comprise the installation of a new concrete saddle over the arch barrel, and the reinstatement of formation to track level, along with masonry works to the underside of the bridge, including the abutments and wingwalls. There will be new coper stones placed on top of the wing walls and the bridge parapets) of the Portishead Branch Line (MetroWest Phase 1) Order 2022

    Submitted 15 Oct 2026
  • 26/P/2129/DCW Awaiting decision

    Portishead Branch Line Between Portishead In North Somerset And Ashton Junction In Bristol

    Request to discharge Requirement 22 (Portbury Ditch Crossing) of Stage 2 and Work Nos. 2, 2A, 3 & 4 (comprises the installation of a surface water outfall on the Portbury Ditch, the installation of gabion mattresses to provide for scour protection, and the temporary excavation associated with outfall installation within 8 metres of the watercourse) of the Portishead Branch Line (MetroWest Phase 1) Order 2022

    Submitted 15 Oct 2026
  • 26/P/2082/DCW Awaiting decision

    Portishead Branch Line Between Portishead In North Somerset And Ashton Junction In Bristol

    Request to discharge Requirement 22 (Culvert 67, Culvert 72 and Culvert 73) for stage 1 of Works Numbers: 1 (for Culverts 72 and 73) and 1A (for Culvert 67) of the Portishead Branch Line (MetroWest Phase 1) Order 2022

    Submitted 9 Oct 2026
  • 26/P/1476/DCW Awaiting decision

    Portishead Branch Line Between Portishead In North Somerset And Ashton Junction In Bristol

    Request to discharge Requirement 22 (Portbury Ditch Crossing) of Stage 1A and Work Nos. 12 and 12A (comprises the installation of a concrete 1200mm diameter pipe and associated headwall units) of the Portishead Branch Line (MetroWest Phase 1) Order 2022

    Submitted 14 Jul 2026
  • 26/P/1112/DCW Granted

    Portishead Branch Line Between Portishead In North Somerset And Ashton Junction In Bristol

    Application to discharge requirements 4, 5, 7, 8, 9, 11, 12, 17, 21 & 29 for Stage 5 of Works No. 22A/22B (Pill Memorial Club Highway Works) of the Portishead Branch Line (MetroWest Phase 1) Order 2022

    Decided 23 Jul 2026
  • 26/P/0626/DCW Granted

    Portishead Branch Line Between Portishead In North Somerset And Ashton Junction In Bristol

    Request to discharge Requirements 5, 5a, 5b, 5c, 5d, 5e, 5f, 5g, 5h, 5I, 5j, 5k, 5l, 8, 10, 11, 12, 13, 14, 17, 21, & 23 (Disused Line, Bridleways And Portishead Station Compound) for stage 1, 1A and 4A of Works Numbers: 1, 1A, 1B, 5, 6, 10, 10B, 15, 16, 16A, 16C, 18, and 19 of the Portishead Branch Line (MetroWest Phase 1) Order 2022

    Decided 14 Aug 2026
  • 26/P/0562/DCW Granted

    Portishead Branch Line Between Portishead In North Somerset And Ashton Junction In Bristol

    Request to discharge Requirements 5, 5b, 5c, 5d, 5e, 5f, 5g, 5h, 5I, 5j, 5k, 5l, 8, 10, 11, 12, 13, 14, 15, 17, 21, & 23 for stage 1A, Works Nos. 17 and 17A of the Portishead Branch Line (MetroWest Phase 1) Order 2022

    Decided 11 Sep 2026
  • 26/P/0458/DCW Granted

    Portishead Branch Line Between Portishead In North Somerset And Ashton Junction In Bristol

    Request to discharge Requirements 5, 5b, 5c, 5d, 5e, 5f, 5g, 5h, 5I, 5j, 5k, 5l, 8, 10, 11, 12, 13, 14, 15, 17, 21, & 23 for stages 4 and 4A, comprising of Works Numbers: 20A, 20B, 21, 21A, 22, and 23 of the Portishead Branch Line (MetroWest Phase 1) Order 2022

    Decided 1 Jun 2026
  • 26/P/0444/DCW Granted

    Portishead Branch Line Between Portishead In North Somerset And Ashton Junction In Bristol

    Request to discharge Requirements 5 (Construction Environmental Management Plan), 8 (Temporary Fencing), 21 (Restoration of Land) & 29 (Works affecting the M5 J19) for stage 1B of the Portishead Branch Line (MetroWest Phase 1) Order 2022

    Decided 11 May 2026
  • 26/P/0436/DCW Granted

    Portishead Branch Line Between Portishead In North Somerset And Ashton Junction In Bristol

    Request to discharge Requirements 5, 5b, 5c, 5d, 5e, 5f, 5g, 5h, 5I, 5j, 5k, 5l, 8, 11, 12, 13, 14, 15, 17, 21, & 23 (Portishead 100 Compound) for stage 1a of Works Numbers: 12, 12a, 13 and 13a of the Portishead Branch Line (MetroWest Phase 1) Order 2022

    Decided 9 Jul 2026

Timeline

Dates from the published record

  1. 17 Aug 2026

    Received by North Somerset

  2. 20 Aug 2026

    Added to PlanIndex

  3. 2 Oct 2026

    Decision issued: Approve (discharge condition)(RDC)

  4. 6 Oct 2026

    Status changed to Decided

    Previously Registered.

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

  • METRO WEST 1B - CEMP WN 14, 14A, 14B VERSION A01 Report · 18 Aug 2026
  • APPLICATIONFORMREDACTED Application Form · 17 Aug 2026
  • METRO WEST 1B - CEMP FOR WORKS NUMBER 14, 14A AND 14B Letter from Agent · 17 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

North Somerset granted permission on 2 October 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on North Somerset's portal will say. Our guide explains the common types.