Planning application

Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

Granted North Somerset 26/P/1540/NMA Amendments

Relates to 26/P/0606/S73

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Non-Material amendment to application 26/P/0606/S73 (Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.) to alter the wording of condition 35 (Landscaping).

As published by the council, reference 26/P/1540/NMA

Application record

Reference
26/P/1540/NMA
Category
Amendments
Status
Decided
Decision
Approve
Received
23 Jul 2026
Validated
23 Jul 2026
Decided
31 Jul 2026
Ward
Long Ashton
Parish
Long Ashton

Site history

Applications at this address on the North Somerset register

This site has had 16 applications since 2025: 13 approved, 0 refused.

  • 26/P/1855/AOC Awaiting decision

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge condition 14 (Plant Noise Assessment) on application 26/P/0606/S73.

    Submitted 10 Sep 2026 Conditions
  • 26/P/1772/AOC Awaiting decision

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge condition 8 (Detailed drawings) (Phase 2 - Training Centre) on application 26/P/0606/S73.

    Submitted 27 Aug 2026 Conditions
  • 26/P/1355/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge condition 12 (Coal Mining) on application 26/P/0606/S73.

    Decided 22 Jul 2026 Conditions
  • 26/P/1283/NMA Awaiting decision

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-material amendment to amend conditions 20 (CEMP) and 22 (working hours) of planning permission 26/P/0606/S73 (Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for; extended working hours on Saturdays, 07:00 to 17:00; for working hours on Sunday, between the hours of 08:00 and 17:00, relating exclusively to site maintenance and general repairs; and updated CEMP

    Submitted 18 Jun 2026 Amendments
  • 26/P/0765/NMA Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-Material amendment to application 25/P/1496/FU2 (Section 73 application to amend application 23/P/2185/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to Office Building One, both utility buildings, the basement car park, sitewide landscaping, the solar PV field, the borefield and sitewide lighting.) to amend Condition 22 (Working Hours) to allow a temporary deviation from the agreed construction hours.

    Decided 17 Apr 2026 Amendments
  • 26/P/0609/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to partially discharge condition 35 (Landscaping Scheme) in relation to Zone 1 of application 25/P/1496/FU2.

    Decided 20 May 2026 Conditions
  • 26/P/0606/S73 Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.

    Decided 12 Jun 2026 Amendments
  • 26/P/0340/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to Discharge conditions 20 (Construction Environmental Management Plan), 21 (Air Quality and Dust Management Plan), 26 (Groundwater), 32 (Biodiversity Net Gain Phasing Plan), 42 (Biodiversity Construction Management Plan), 45 (Precautionary Method of Working) and 49 (Highway Condition Survey) from application 25/P/1496/FU2.

    Decided 20 Mar 2026 Conditions
  • 26/P/0273/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge conditions 47 (Gurney Roundabout Details) and 48 (Brook Gate/Colliters Way Details) from application 25/P/1496/FU2.

    Decided 23 Feb 2026 Conditions
  • 26/P/0043/NMA Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-material amendment to application 23/P/2185/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works. Full application (on a phased basis) comprising three office buildings, culinary building, training centre and auditorium. New accesses from the public highway, internal site roads and footpaths, public realm works, site drainage, landscaping, solar PV field, ancillary plant, servicing and other associated works. Below ground works including ancillary plant, car and cycle parking and geothermal borefield. Outline application comprising two further office buildings (access, layout, scale and landscaping for approval, appearance to be reserved for subsequent approval) [amended description].) To allow for an amendment to the description by replacing the word 'building' in the phrase culinary building to 'centre', so that it reads 'culinary centre', to ensure conformity between the description of uses relating to culinary and training activities.

    Decided 14 Jan 2026 Amendments

Timeline

Dates from the published record

  1. 23 Jul 2026

    Received by North Somerset

  2. 31 Jul 2026

    Decision issued: Approve

  3. 31 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 26/P/0606/S73 Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.

    Decided 12 Jun 2026 Amendments

Who's behind it

Company information only, from the register and Companies House

Rapleys LLP Agent

705 applications on PlanIndex · across 125 councils · 95% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Epic Bristol Limited Applicant, registered in Salford

Active · incorporated 2016 · Salford

10 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

  • DECISION (NMA) APPROVE Decision Notice · 31 Jul 2026
  • NORTH SOMERSET OFFICER REPORT Delegated Report · 31 Jul 2026
  • APPLICATIONFORMREDACTED Application Form · 23 Jul 2026
  • SITE LOCATION PLAN OS Extract · 23 Jul 2026
  • PLANNING STATEMENT Planning Statement · 23 Jul 2026

Trade members open them from here.

Open the documents

What this grant of permission means

North Somerset granted permission on 31 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

In North Somerset

  • 26/P/1861/NMA Awaiting decision

    Willow Farm Ebdon Lane Weston-super-Mare BS22 7YA

    Non-material amendment to application 23/P/2461/FUL (Demolition of existing agricultural buildings. Erection of 5no. dwellings (Class C3) and installation of infrastructure to include access off Bourton Lane, parking, landscape, and sustainable urban drainage.) to allow for alterations to the size of the windows and a reduced height of the boundary walls.

    11 Sep 2026 Amendments
  • 26/P/1522/NMA Granted

    17 - 21 High Street Weston-super-Mare BS23 1HA

    Non-material amendment to application 23/P/0985/FUL (Conversion of existing mixed use retail and residential building to create four ground floor retail units (Use Class E) and 40no. residential units above. Works to include demolition of existing third floor and erection of extended third floor; insertion of new and replacement of existing windows and doors; creation of balconies to flats.) to allow for the removal of the proposed ramp to the front elevation of the building.

    21 Jul 2026 Amendments
  • 26/P/1736/NMA Granted

    71 Slade Road Portishead BS20 6AP

    Non-material amendment to application 26/P/0423/FUH (Proposed demolition of existing single storey lean-to and erection of a single storey rear extension.) to allow for the removal of an approved rooflight.

    21 Aug 2026 Amendments
  • 24/P/2648/NMA Granted

    Bleadon Quarry Bridge Road Bleadon Weston-super-Mare BS24 0AU

    Non-material amendment to application 22/P/2113/RM (Reserved matters application for appearance, landscaping, layout and scale for the erection of 42no. dwellings and office building pursuant to outline permission 19/P/0835/OUT (outline application with details of access (matters of layout, scale, appearance and landscaping are reserved) for the demolition of all industrial buildings, plant and machinery, the erection of up to 42 dwellings and 500 sqm of flexible Use Class A2/B1/D1 floor space, open space, landscaping, new vehicle and pedestrian access, and associated works) To allow for an amendment to condition 1 in order to substitute the existing layout plan and relevant landscaping plans with revisions showing the removal of the on-site play area/ play equipment and what will now be delivered in its place. Addition of an Arboriculture Addendum Note to the approved plans.

    16 Dec 2024 Amendments
  • 26/P/1086/S73 Granted

    Court House Farm Marsh Lane Easton-in-Gordano BS20 0NE

    Section 73 application to vary condition 9 attached to permission 23/P/0563/FUL (Application to remove condition 19 (access - highways safety) attached to planning permission 16/P/1987/F (development of the site for port related uses. Provision of hardstanding for storage of cargo in transit (e.g. motor vehicles) through Royal Portbury Docks,with associated infrastructure, including a crossing over the disused railway by a crossing at grade and or vehicle bridge between the current Royal Portbury Dock estate and the proposed site) to allow for the wording of condition 9 (Condition 16) to be amended to reflect the uncertain requirement for, and timing of, the construction of the vehicular bridge across the railway line.

    22 May 2026 Amendments