Skip to content
PlanIndex Get alerts
Menu

Planning application

Marine Lake Knightstone Causeway Weston-super-Mare

Granted North Somerset 26/P/0610/NMA Non Material Amendment

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Non-material amendment to approval 25/P/0855/R3 (Works to Marine Lake consisting of: New entrance signage to the southern entrance; New cycle racks to north and middle entrances; Construction of a replacement slipway/ramp structure; Re-surfacing the walkway; Refurbishment of 2 vacant existing spaces within the RNLI building located on the promenade walkway; Unit 1 includes the demolition and replacement of existing toilet facilities and partial demolition of main facade to create new openings to allow access to self-contained toilet cubicles from the promenade; Unit 2 includes retrofit and refurbishment of a vacant unit to provide concession facilities for the lake. Includes partial demolition of main facade for a new entrance door; Repairs to Madeira Gardens pavilion roof; A small section of a low brick wall to the south of the site will be carefully removed, stored, and re-instated at the end of the project to allow RNLI and site access along the walkway during construction) to allow change of resurfacing material from grey concrete asphalt to black stone mastic asphalt

As published by the council, reference 26/P/0610/NMA

Application record

Reference
26/P/0610/NMA
Type
Non Material Amendment
Status
Decided
Decision
Approve
Received
17 Mar 2026
Validated
17 Mar 2026
Decided
14 Apr 2026
Ward
Weston-super-Mare Hillside
Parish
Weston-super-Mare
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 17 Mar 2026

    Received by North Somerset

  2. 14 Apr 2026

    Decision issued: Approve

  3. 26 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Thame

10 applications on PlanIndex · across 2 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

North Somerset granted permission on 14 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

In North Somerset

  • 26/P/1086/S73 Granted

    Court House Farm Marsh Lane Easton-in-Gordano BS20 0NE

    Section 73 application to vary condition 9 attached to permission 23/P/0563/FUL (Application to remove condition 19 (access - highways safety) attached to planning permission 16/P/1987/F (development of the site for port related uses. Provision of hardstanding for storage of cargo in transit (e.g. motor vehicles) through Royal Portbury Docks,with associated infrastructure, including a crossing over the disused railway by a crossing at grade and or vehicle bridge between the current Royal Portbury Dock estate and the proposed site) to allow for the wording of condition 9 (Condition 16) to be amended to reflect the uncertain requirement for, and timing of, the construction of the vehicular bridge across the railway line.

    22 May 2026 Amendments
  • 26/P/1736/NMA Awaiting decision

    71 Slade Road Portishead Bristol BS20 6AP

    Non-material amendment to application 26/P/0423/FUH (Proposed demolition of existing single storey lean-to and erection of a single storey rear extension.) to allow for the removal of an approved rooflight.

    21 Aug 2026 Amendments
  • 26/P/1319/S73 Granted

    Deerwood Cadbury Camp Lane Clapton-in-Gordano Tichenham BS20 7SA

    Section 73 application to vary condition 2 (plans) attached to application 24/P/1529/FUH (Proposed extension and remodelling of the host dwelling, works to include:- conversion of the north projection wing into a one-bedroom annexe, increasing the size of the first floor living area and the addition of an extra bedroom to the main house. Remodelling of all elevations by changing the roof profiles, material finishes to the roofs and walls and alterations and an increase to the rear terrace) to allow for changes to approved design.

    23 Jun 2026 Amendments
  • 26/P/0713/S73 Granted

    131 High Street Weston-super-Mare BS23 1HN

    Section 73 Application to vary condition 2 (Approved Plans) on application 24/P/1501/FUL(Proposed change of use from a cafe (Class E) with ancillary accommodation at first floor to a large house in multiple occupation (HMO), (Class C4) for up to 8no. people with office and communal areas at ground floor (sui generis)) to allow for alterations to internal layout, roofing design and fenestration.

    30 Mar 2026 Amendments
  • 26/P/1199/S73 Granted

    Rise 1 Harris Lane Abbots Leigh BS8 3QX

    Section 73 application to vary conditions 2 (plans) and 7 (Construction Method Statement) on application 25/P/1477/FUL (Proposed demolition of the existing dwelling and garage with the subsequent erection of a replacement dwelling and detached garage with associated landscaping and hardstanding works.) To allow for the central door on the Southern elevation to be changed to a window and the addition of PV to the South facing section of the garage roof. Amendments to the current wording of condition 7 (The development shall be carried out in accordance with the following approved plans and documents: -4348_021 SITE SET UP PLAN-Construction Management Plan dated October 2025 written by Atlas PlanningGroup). To read as, The development shall be carried out in accordance with the following Construction Management Plans and documents (produced by Rainsford March 2026): -Construction Management Plan dated June 2026 written by Atlas Planning Group -Rainsford - Phase 1 CMP & Demolition-Rainsford Site - Security Plan 24.3.26.

    5 Jun 2026 Amendments