Proposal
Non material amendment to application 09/P/1614/F (amended 11/P/1922/MMA) to allow trhe following a/ An extension of the footway along Bowen Road which is adoptable and inclusion of pedestrian crossing. b/ - Incorporation of an adoptable grass verge and placement of Bowen Road Sign c/ - Proposed anti-skid surfacing to be provided at junction onto Garland Avenue. Coloured surface to provide conspicuity
As published by the council, reference 22/P/0530/NMA
Application record
- Reference
- 22/P/0530/NMA
- Type
- Non Material Amendment
- Status
- Decided
- Decision
- Approve
- Received
- 25 Feb 2022
- Validated
- 25 Feb 2022
- Decided
- 30 Mar 2023
- Ward
- Hutton And Locking
- Parish
- Locking
- Decision by
- Delegated Decision
Site history
Applications at this address on the North Somerset register
This site has had 4 applications since 2021: 4 approved, 0 refused.
-
22/P/2483/AOC Granted
Locking Parklands Locking Moor Road Weston-super-Mare North Somerset
Discharge of Condition No.7 (Scope of Works), 8 (Site Development Project Plan), 11 (Construction Management Plan), 14 (Treatment and Removal of Suspended Solids), 20 (Landscape and Management Plan), 24 (Ecological Survey), 26 (External Lighting), 27 (Biodiversity and Nature Conservation Management Plan), 28 (Pre-demolition Checks of Protected Species), 32 (Land Contamination Assessment), 33 (Remediation Scheme), 38 (Lifetime Homes), and 40 (Columns and Lantern Plan) from application No. 13/P/0997/OT2
-
22/P/1998/AOC Granted
Locking Parklands Locking Moor Road Weston-super-Mare North Somerset
Request to discharge condition 46. (Permitted Development) On Application .
-
21/P/1881/AOC Granted
Locking Parklands Locking Moor Road Weston-Super-Mare North Somerset
Request to discharge condition No. 16 road, cycle and pedestrian access, No. 20 landscape and management plan, and No. 25 boundaries along side the Grumblepill Rhyne on application 15/P/1777/RM of 13/P/0997/OT2 (Phase 3)
Timeline
Dates from the published record
-
25 Feb 2022
Received by North Somerset
-
30 Mar 2023
Decision issued: Approve
-
31 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
49 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
North Somerset granted permission on 30 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Other amendment applications
In North Somerset
-
26/P/1086/S73 Granted
Court House Farm Marsh Lane Easton-in-Gordano BS20 0NE
Section 73 application to vary condition 9 attached to permission 23/P/0563/FUL (Application to remove condition 19 (access - highways safety) attached to planning permission 16/P/1987/F (development of the site for port related uses. Provision of hardstanding for storage of cargo in transit (e.g. motor vehicles) through Royal Portbury Docks,with associated infrastructure, including a crossing over the disused railway by a crossing at grade and or vehicle bridge between the current Royal Portbury Dock estate and the proposed site) to allow for the wording of condition 9 (Condition 16) to be amended to reflect the uncertain requirement for, and timing of, the construction of the vehicular bridge across the railway line.
-
26/P/1736/NMA Awaiting decision
71 Slade Road Portishead Bristol BS20 6AP
Non-material amendment to application 26/P/0423/FUH (Proposed demolition of existing single storey lean-to and erection of a single storey rear extension.) to allow for the removal of an approved rooflight.
-
26/P/1319/S73 Granted
Deerwood Cadbury Camp Lane Clapton-in-Gordano Tichenham BS20 7SA
Section 73 application to vary condition 2 (plans) attached to application 24/P/1529/FUH (Proposed extension and remodelling of the host dwelling, works to include:- conversion of the north projection wing into a one-bedroom annexe, increasing the size of the first floor living area and the addition of an extra bedroom to the main house. Remodelling of all elevations by changing the roof profiles, material finishes to the roofs and walls and alterations and an increase to the rear terrace) to allow for changes to approved design.
-
26/P/0713/S73 Granted
131 High Street Weston-super-Mare BS23 1HN
Section 73 Application to vary condition 2 (Approved Plans) on application 24/P/1501/FUL(Proposed change of use from a cafe (Class E) with ancillary accommodation at first floor to a large house in multiple occupation (HMO), (Class C4) for up to 8no. people with office and communal areas at ground floor (sui generis)) to allow for alterations to internal layout, roofing design and fenestration.
-
26/P/1199/S73 Granted
Rise 1 Harris Lane Abbots Leigh BS8 3QX
Section 73 application to vary conditions 2 (plans) and 7 (Construction Method Statement) on application 25/P/1477/FUL (Proposed demolition of the existing dwelling and garage with the subsequent erection of a replacement dwelling and detached garage with associated landscaping and hardstanding works.) To allow for the central door on the Southern elevation to be changed to a window and the addition of PV to the South facing section of the garage roof. Amendments to the current wording of condition 7 (The development shall be carried out in accordance with the following approved plans and documents: -4348_021 SITE SET UP PLAN-Construction Management Plan dated October 2025 written by Atlas PlanningGroup). To read as, The development shall be carried out in accordance with the following Construction Management Plans and documents (produced by Rainsford March 2026): -Construction Management Plan dated June 2026 written by Atlas Planning Group -Rainsford - Phase 1 CMP & Demolition-Rainsford Site - Security Plan 24.3.26.