Skip to content
PlanIndex Get alerts
Menu

Planning application

Rushton Hall Farm Desborough Road Rushton NN14 1RG

Awaiting decision North Northamptonshire 26/02092/3RCOU Part 3, Class R Change of Use > 150sqm

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Prior approval for use of part of the existing barn as a Padel Court

As published by the council, reference 26/02092/3RCOU

Application record

Reference
26/02092/3RCOU
Type
Part 3, Class R Change of Use > 150sqm
Status
In progress
Received
27 Jul 2026
Validated
27 Jul 2026
Ward
Rothwell & Mawsley
Parish
Rushton CP
Postcode
NN14 1RG

Timeline

Dates from the published record

  1. 27 Jul 2026

    Received by North Northamptonshire

  2. 4 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 21 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    North Northamptonshire took a median of 81 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

1,780 applications on PlanIndex · across 174 councils · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with North Northamptonshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Play Area Desborough Road Rushton

    25/01968/TCA Submitted 5 Dec 2025 122m away

    T1; Cherry - prune to clear play apparatus by 2m at all points, profile remaining overhang to shape. Crown lift to 3.5m on park side only. G1; 1 x Cherry/1 x Sycamore/1 x Beech - crown raise to 3.5m all round, prune to suitable growth points. NG2; 5 x Lime - trim back to boundary.

    Granted Trees 3 docs
  • 4 Church Close Station Road Rushton NN14 1RL

    25/01007/HFUL Submitted 29 Aug 2025 285m away

    Replacement windows to front (south), rear (north) and side (east) of property and replacement doors at rear

    Granted Householder Windows or glazing 8 docs
    Domestic
  • 1 Woodyard Close Rushton NN14 1RL

    25/00950/LDP Submitted 15 Aug 2025 393m away

    Certificate of proposed lawfulness for a single storey rear oak frame extension 4 X 4 meters with eves at 2.10m and roof ridge at 3.45m

    Withdrawn Lawful development Extension 4 docs
    Small domestic
  • 11 Station Road Rushton NN14 1RL

    26/00629/TCA Submitted 6 Mar 2026 426m away

    T1 Prunus - Reduce by up to 500mm to previous point T2 Hawthorn - Reduce by up to 500mm to previous point

    Granted Trees 3 docs
  • 13 Station Road Rushton NN14 1RL

    25/01164/TCA Submitted 12 Sep 2025 437m away

    100% historically approved · decision due ~7 Nov

    T1 Yew - 2m crown reduction and sides reduced to be 1m clear of the buildings; T2 Sorbus - 20% crown reduction and 2m shaping of the sides

    Awaiting decision Trees 2 docs
  • 15 Station Road Rushton NN14 1RL

    25/01170/TCA Submitted 15 Sep 2025 438m away

    100% historically approved · decision due ~10 Nov

    T1 Yew - Reduce sides to allow 1m clearance from the buildings and 2m crown reduction

    Awaiting decision Trees 1 doc

In North Northamptonshire

  • 26/02507/FUL Awaiting decision

    4 Scotts Lane Wilbarston LE16 8QW

    Erection of a detached 2-bedroom bungalow with associated landscaping

    3 Sep 2026 Full applications
  • 25/02021/FUL Refused

    Land West Of Pipewell Road Desborough

    Installation of a solar panel array, with security fencing, CCTV cameras, transformer equipment and connection room, and storage and electrical equipment containers, and associated works to form an access track

    10 Dec 2025 Full applications
  • 26/02498/FUL Awaiting decision

    61 Orchard Road Finedon NN9 5JG

    Change of use from a C3 dwellinghouse to a short-term holiday let

    2 Sep 2026 Full applications
  • 26/01385/FUL Granted

    42 - 44 High Street Kettering NN16 8SW

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    20 May 2026 Full applications
  • 26/02493/FUL Awaiting decision

    190 Hinwick Road Wollaston NN29 7QY

    Two detached dwellings

    2 Sep 2026 Full applications