Planning application
26/01918/VAR
Coal Yard And 20 Midland Road Thrapston
Proposal
Variation of condition 3 (HGV deliveries) and 4 (Vehicle turning and parking) persuant to 18/00114/FUL
As published by the council, reference 26/01918/VAR
Timeline
Dates from the published record
-
9 Jul 2026
Received by North Northamptonshire
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with North Northamptonshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About amendments applications
How this application type works
An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.
Nearby applications
Within 500 metres
-
26/01863/DEM Refused
The Bridge Hotel Bridge Street Thrapston NN14 4JP
The hotel and all of the amalgamations that have been constructed unsafely and added to the rear of the building, including the boundary walls
-
26/00252/LDP Granted
71 - 75 High Street Thrapston NN14 4JJ
Confirm that the proposed use of the ground floor accommodation as a childrens play cafe is lawful.
-
26/00253/LBC Granted
71 - 75 High Street Thrapston NN14 4JJ
Retention of internal alterations including formation of WC facilities, installation of small kitchen / serving area, lightweight internal partitions and associated finishes. New internal alteration to include adaptation of store cupboard to provide baby-changing facility and installation of non-illuminated, removable signage (part retrospective)
-
26/00470/TCA Granted
St James Parish Church Church Walk Thrapston NN14 4NP
T1; Yew - remove rotten bough (approx 5m reduction).
-
26/00305/TCA Withdrawn
St James Church Hall Church Walk Thrapston NN14 4NP
T1; Yew - remove rotten bough and weak branches.
Other amendments applications
In North Northamptonshire
-
26/01808/NMA Granted
Land North Of Garden Centre Cranford Road Burton Latimer
Non-Material Amendment pursuant to NK/2024/0289 - relocation of substation along the norther boundary westwards, alteration to car park layout due to relocation of substation with the number and mix of spaces remaining in line with the consented scheme, trolley bay reduced in size, consented flag pole and totem shown on site layout, internal deposit return scheme door added, internal warehouse door amended to a rapid rise door and external gate now shown along the back of the store
-
26/00901/NMA Granted
Kettering General Hospital Rothwell Road Kettering NN16 8UZ
Non material amendment pursuant to NK/2025/0130. Demolition of existing structures, alterations to highway, erection of multi storey car park and associated structures. Increase/reconfigure stair core, alter stair layout and lift lobbies. External alterations.
-
26/02044/VAR Awaiting decision
8 Ballantyne Road Rushden NN10 9FJ
Variation of Conditions 2 (Materials) and 3 (Plans) pursuant to NE/23/01218/FUL
-
26/02056/NMA Awaiting decision
39 Westlea Road Sywell NN6 0BY
Non-Material Amendment to Condition 2 (Approved Plans) pursuant to planning permission reference NW/24/00058/FUL to render the 1st floor new addition only in a silicone based render
-
26/02021/NMA Awaiting decision
2 Eddington Way Corby NN17 5JL
Non mateiral amendment of original planning application NC/22/00294/DPA (Erection of logistics warehouse with associated offices, car parking, landscaping, engineering, drainage and infrastructure works, including creation of new access onto Corby North Orbital Road)