Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00725/FUL

Abbott House Residential Home Historic Glapthorn Road Oundle PE8 4JA

Awaiting decision North Northamptonshire Full Planning Permission

Proposal

Demolition of derelict care home and erection of 9 dwellings with associated private drives and landscaping

As published by the council, reference 26/00725/FUL

Timeline

Dates from the published record

  1. 18 Mar 2026

    Received by North Northamptonshire

  2. 27 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with North Northamptonshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/01001/DEM Granted

    Abbott House Residential Home Historic Glapthorn Road Oundle PE8 4JA

    Demolition of remaining section of Abbott House.

    13 Apr 2026 14m away Other
  • 26/00114/HFUL Granted

    24 Kings Road Oundle PE8 4AX

    Removal of rear conservatory, new rear extension, with alterations to front elevation, and internal alterations along with works to driveway and solar panels on rear roof

    15 Jan 2026 225m away Householder
  • 26/00033/NMA Granted

    Oundle Church Of England Primary School Milton Road Oundle PE8 4AB

    Non material amendment to allow for the addition of two small porch canopies above the doorways serving the entrances to the private accommodation pursuant to NE/24/00222/FUL - Demolition of former primary school buildings and the construction of a purpose built girls' boarding house for Oundle School with associated works.

    7 Jan 2026 253m away Amendments
  • 26/00036/AOC Granted

    Oundle Church Of England Primary School Milton Road Oundle PE8 4AB

    Discharge of conditions pursuant to NE/24/00222/FUL. Demolition of former primary school buildings and the construction of a purpose built girls' boarding house for Oundle School with associated works. Condition 21 - landscaping.

    7 Jan 2026 258m away Conditions
  • 26/00037/AOC Granted

    Oundle Church Of England Primary School Milton Road Oundle PE8 4AB

    Discharge of conditions pursuant to NE/24/00222/FUL. Demolition of former primary school buildings and the construction of a purpose built girls' boarding house for Oundle School with associated works. Condition 23 - Biodiversity Enhancement Strategy

    7 Jan 2026 259m away Conditions
  • 26/00794/NMA Granted

    Oundle Church Of England Primary School Milton Road Oundle PE8 4AB

    Non material amendment pursuant to NE/24/00222/FUL. Demolition of former primary school buildings and the construction of a purpose built girls' boarding house for Oundle School with associated works. Variation of wording to Condition 26 to allow three electric vehicle charging points to be installed as fully operational charging units, with seven provided as passive infrastructure.

    25 Mar 2026 259m away Amendments

In North Northamptonshire

  • 26/01330/FUL Granted

    1 Sunnyside Earls Barton NN6 0EX

    Construction of an attached side carport

    18 May 2026 Full applications
  • 26/02053/FUL Awaiting decision

    St Marys Hospital 77 London Road Kettering NN15 7PW

    Proposed building extension for new lift shaft and proposed modular building

    22 Jul 2026 Full applications
  • 26/01548/3QCOU Withdrawn

    Pumping Station Hardwick Village Hardwick

    Convert pumphouse to 1-bedroom dwelling, add rear extension.

    5 Jun 2026 Full applications
  • 26/01467/FUL Granted

    83 High Street Rushden NN10 0NZ

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    27 May 2026 Full applications
  • 26/02034/3MACOU Awaiting decision

    9 - 11 High Street Ecton NN6 0QA

    Change of use of the ground floor of number 11 from a hairdressers (E (a) use) to residential (C3 use)

    21 Jul 2026 Full applications