Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00534/FUL

The Bell Tower Church Lane Dingley LE16 8PG

Awaiting decision North Northamptonshire Full Planning Permission

Proposal

Internal and external alterations including replacement of roof covering to the roof terrace, installation of safety glass to parapet gaps, internal refurbishment and associated works

As published by the council, reference 26/00534/FUL

Timeline

Dates from the published record

  1. 26 Feb 2026

    Received by North Northamptonshire

  2. 14 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 27 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with North Northamptonshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00535/LBC Awaiting decision

    The Bell Tower Church Lane Dingley LE16 8PG

    Internal and external alterations comprising of refurbishment of ground floor kitchen and provision of dining area, refurbishment of first floor shower room, reinstatement of second floor partition to form bedroom, replacement of roof covering to the roof terrace, replacement of damaged double glazed glass units in atrium roof, installation of safety glass to parapet gaps, replacement of oil boiler and oil tank, replacement radiators throughout and replacement of hot water cylinder

    26 Feb 2026 0m away Heritage and listed buildings
  • 26/01790/HFUL Awaiting decision

    8 Church Lane Dingley LE16 8PG

    Proposed rear extension and upper floor extension to existing dormer bungalow

    26 Jun 2026 295m away Householder

In North Northamptonshire

  • 26/01330/FUL Granted

    1 Sunnyside Earls Barton NN6 0EX

    Construction of an attached side carport

    18 May 2026 Full applications
  • 26/02053/FUL Awaiting decision

    St Marys Hospital 77 London Road Kettering NN15 7PW

    Proposed building extension for new lift shaft and proposed modular building

    22 Jul 2026 Full applications
  • 26/01548/3QCOU Withdrawn

    Pumping Station Hardwick Village Hardwick

    Convert pumphouse to 1-bedroom dwelling, add rear extension.

    5 Jun 2026 Full applications
  • 26/01467/FUL Granted

    83 High Street Rushden NN10 0NZ

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    27 May 2026 Full applications
  • 26/02034/3MACOU Awaiting decision

    9 - 11 High Street Ecton NN6 0QA

    Change of use of the ground floor of number 11 from a hairdressers (E (a) use) to residential (C3 use)

    21 Jul 2026 Full applications