Skip to content
PlanIndex Get alerts
Menu

Planning application

George Hotel George Street Kettering NN16 0AN

Granted North Northamptonshire 25/01305/FUL Full Planning Permission

Works: New dwelling

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Splitting of Unit 12 (2 bedroom apartment) to create 2 No 1 bedroom apartments with associated works

As published by the council, reference 25/01305/FUL

Application record

Reference
25/01305/FUL
Type
Full Planning Permission
Status
Decided
Decision
Application Permitted/Approved
Received
25 Sep 2025
Validated
25 Sep 2025
Decided
11 Jun 2026
Ward
Kettering Central
Decision by
Officer Delegated Decision
Postcode
NN16 0AN

Timeline

Dates from the published record

  1. 25 Sep 2025

    Received by North Northamptonshire

  2. 11 Jun 2026

    Decision issued: Application Permitted/Approved

  3. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Ampthill

27 applications on PlanIndex · across 7 councils · 43% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • George Hotel George Street Kettering NN16 0AN

    25/01174/AOC Submitted 15 Sep 2025 0m away

    Condition 2 of NK/2024/0750 - Dormer roof details

    Granted Conditions Loft or dormer 4 docs
  • George Hotel George Street Kettering NN16 0AN

    25/01120/VAR Submitted 10 Sep 2025 2m away

    Removal of condition 4 of NK/2024/0750 in respect of archaeological scheme of investigation

    Granted Amendments 4 docs
  • Kettering Library Sheep Street Kettering NN16 0AY

    26/02282/LBC Submitted 12 Aug 2026 50m away

    89% historically approved · decision due ~7 Oct

    Internal alterations to the corridor link, including removing redundant electrical services, refurbishing existing high-level cupboards and boxing, new barrier matting to the entrance lobby and general redecoration.

    Awaiting decision Heritage and listed buildings
  • Oaktree Court George Street Kettering

    25/01432/TPO Submitted 8 Oct 2025 55m away

    T1 Holm Oak - crown thin by 15% and remove basal growth. Crown lift to a height of 3.0 metres over footpath and prune to clear sign

    Granted Trees 3 docs
  • Kettering Library Sheep Street Kettering NN16 0AY

    26/00143/VLB Submitted 6 Jan 2026 55m away

    Variation of additional condition 2 as per 25/01247/VLB of NK/2024/0377 to include changes to scope of work

    Granted Heritage and listed buildings 46 docs
  • Kettering Library Sheep Street Kettering NN16 0AY

    25/01247/VLB Submitted 18 Sep 2025 55m away

    Variation of conditions of NK/2024/0377 in respect of addition of 2 no. conditions

    Granted Heritage and listed buildings 23 docs

In North Northamptonshire

  • 26/02507/FUL Awaiting decision

    4 Scotts Lane Wilbarston LE16 8QW

    Erection of a detached 2-bedroom bungalow with associated landscaping

    3 Sep 2026 Full applications
  • 25/02021/FUL Refused

    Land West Of Pipewell Road Desborough

    Installation of a solar panel array, with security fencing, CCTV cameras, transformer equipment and connection room, and storage and electrical equipment containers, and associated works to form an access track

    10 Dec 2025 Full applications
  • 26/02498/FUL Awaiting decision

    61 Orchard Road Finedon NN9 5JG

    Change of use from a C3 dwellinghouse to a short-term holiday let

    2 Sep 2026 Full applications
  • 26/01385/FUL Granted

    42 - 44 High Street Kettering NN16 8SW

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    20 May 2026 Full applications
  • 26/02493/FUL Awaiting decision

    190 Hinwick Road Wollaston NN29 7QY

    Two detached dwellings

    2 Sep 2026 Full applications