Planning application
Alpro Uk Ltd Altendiez Way Burton Latimer NN15 5YT
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Retrospective application for the installation of 4no additional windows and 1no. doorway to the east elevation of the building plus installation of 2no extraction fans with a discharge duct extending 1m above the flat roof line.
As published by the council, reference 25/01256/FUL
Application record
- Reference
- 25/01256/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Application Permitted/Approved
- Received
- 22 Sep 2025
- Validated
- 29 Jan 2026
- Decided
- 17 Jul 2026
- Ward
- Barton Seagrave & Burton Latimer
- Parish
- Burton Latimer CP
- Decision by
- Officer Delegated Decision
- Postcode
- NN15 5YT
Timeline
Dates from the published record
-
22 Sep 2025
Received by North Northamptonshire
-
29 Jan 2026
Validated
Checked as complete and ready for consideration.
-
17 Jul 2026
Decision issued: Application Permitted/Approved
-
4 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Burton Latimer NN15 5YT
82% historically approved · decision due ~18 Aug
New Individual Vehicle Approval (IVA) testing station, using existing van build bay (to be used for testing one day per week; for the remaining four days, the bay will revert to its current use for building vans).
Awaiting decision Lawful development -
15 Quantock Close Barton Seagrave NN15 6RR
Garage conversion to habitable accommodation including the removal of a garage door and infilling with a window and brickwork. Two storey side extension and single storey rear extension (amended description).
Granted Householder Extension Windows or glazing 7 docsSmall domestic
Other full applications applications
In North Northamptonshire
-
26/02507/FUL Awaiting decision
4 Scotts Lane Wilbarston LE16 8QW
Erection of a detached 2-bedroom bungalow with associated landscaping
-
25/02021/FUL Refused
Land West Of Pipewell Road Desborough
Installation of a solar panel array, with security fencing, CCTV cameras, transformer equipment and connection room, and storage and electrical equipment containers, and associated works to form an access track
-
26/02498/FUL Awaiting decision
61 Orchard Road Finedon NN9 5JG
Change of use from a C3 dwellinghouse to a short-term holiday let
-
26/01385/FUL Granted
42 - 44 High Street Kettering NN16 8SW
Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch
-
26/02493/FUL Awaiting decision
190 Hinwick Road Wollaston NN29 7QY
Two detached dwellings