Planning application
Land At Waterhouse Farm Wells Road Fakenham Norfolk
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use from agricultural to a dog exercise and training ground including perimeter fence, field shelter/store and parking area
As published by the council, reference PF/25/1612
Application record
- Reference
- PF/25/1612
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 21 Jul 2025
- Validated
- 17 Dec 2025
- Decided
- 25 Mar 2026
- Ward
- Lancaster North
- Parish
- Fakenham
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
21 Jul 2025
Received by North Norfolk
-
17 Dec 2025
Validated
Checked as complete and ready for consideration.
-
25 Mar 2026
Decision issued: Approve
-
7 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Application: PU/25/1090 (Withdrawn)
Who's behind it
Company information only, from the register and Companies House
Raven Land Management Ltd Agent
27 applications on PlanIndex · across 5 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
28 documents on file for this application
- Officer report
- Approved full planning
- Proposed signage plan
- Highways response
- Landscape response
- Highways response
- Economic development
- Elected member response
- Clerk lesley meanley
- Copy of advert for dereham and fakenham times for 8th january 2026
- Environmental health response
- Preliminary ecological appraisal
- Bng calculator
- Bng baseline plan
- Biodiversity net gain assessment
- Biodiversity net gain metric
- Biodiversity net gain assessment
- Bng baseline plan
- Bng intervention plan
- Use of ai declaration
- Climate emergency / net zero statement
- Application form
- Location plan 1-2500
- Site plan 1-1250
- Site plan 1-500
- Field shelter - plans & elevations
- Site plan & gate elevations
- Planning statement & design and access statement
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North Norfolk granted permission on 25 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Bridge Farm Workshop Water Moor Lane Fakenham Norfolk NR21 8JS
Formation of access and driveway to Water Moor Lane
Granted Full applications 19 docs -
Bridge Farm Workshop Water Moor Lane Fakenham Norfolk NR21 8JS
Erection of 3 No. dwellings, new vehicular access to Water Moor Lane
Granted 45 docsSeveral homes
Other full applications
In North Norfolk
-
PF/24/0778 Withdrawn
Kingfisher Hotel 12 High Street Stalham Norwich Norfolk NR12 9AN
Change of use of vacant hotel (Class C1) to 8 self-contained flats (Class C3), external alterations
-
PF/26/1847 Awaiting decision
Briarwood Lodge Sheringwood Beeston Regis Sheringham Norfolk NR26 8TS
Change of use of detached residential annexe to a wellbeing studio for counselling and massage therapy (Class E)
-
PF/26/1844 Awaiting decision
Marlborough House 2 - 4 Cromer Road Mundesley Norwich Norfolk NR11 8BE
Change of use of first-floor flat (Class C3) to short-term holiday accommodation.
-
PF/25/0902 Granted
Forest Park Northrepps Road Northrepps Norfolk
Installation of sections of new footpath, along with upgrade of surfacing of existing areas used as permissive footpaths to create a single new connected walkway with rest stop areas and interpretation boards (part retrospective)
-
PF/26/0200 Granted
Land West Of 9 The Green Felbrigg Norfolk
Installation of a below-ground electricity supply to amenity land, together with associated engineering works including the formation of an earth bund and minor alterations to the site access (part retrospective).