Planning application
Land To The West Of Catfield Road Ludham Norfolk
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 26 dwellings, comprising social rent and shared ownership housing, along with 0.3 hectares of green open space (development of a Rural Exception Site) and associated infrastructure
As published by the council, reference PF/25/1486
Application record
- Reference
- PF/25/1486
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 4 Jul 2025
- Validated
- 24 Jul 2025
- Decided
- 13 Oct 2026
- Ward
- St Benet's
- Parish
- Ludham
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
4 Jul 2025
Received by North Norfolk
-
24 Jul 2025
Validated
Checked as complete and ready for consideration.
-
24 Jul 2026
Added to PlanIndex
-
13 Oct 2026
Decision issued: Approve
-
13 Oct 2026
Status changed to Decided
Previously Pending Consideration.
Documents
Plans, drawings, consultee responses and the officer's report
136 documents on file for this application
- Objection - 7 pikes nursery
- Landscape comments
- Natural england response
- Objection-18.08.2026
- Supports-17 willow way
- Objection-malthouse lane
- Supports-3 hinderer close
- Supports - myrtle high street
- Objection - 9 elderbush lane
- Objection- 7 pikes nursery
- Supports - 25 reeves court hall lane
- Objection - 14 grange close
- Objection - 18 willow way
- Objection - 32 willow way
- Supports - 20 sycamore close
- Objection - 3 pikes nursery
- Objection - public comment 23.07.2026
- Objection - 3 willow way
- Environmental protection response
- Objection - 2 willow way
- Objection email
- Objection - the elms
- Objection - the elms
- Llfa response
- Highways response
- Rising main easement plan
- Retained land plan
- Road safety audit response report
- Planning obligations response
- Norfolk fire & rescue response
- Llfa response
- Conservation & design response
- Highways response
- Norfolk fire & rescue response
- Norfolk constabulary response
- Strategic housing response
- Anglian water response
- Objection - plum cottage 6 the barns fritton road
- Surface water flood study
- Vehicle tracking - pump station
- Vehicle tracking - refuse vehicle
- Accommodation plan
- Water butt locations plan
- Boundary treatment plan
- Refuse strategy plan
- Materials plan
- Site plan
- Flood risk assessment and drainage strategy addendum report
- Site access arrangement
- 2b4p m4(2) semi-detached bungalow
- Soft landscaping
- Street scene bb
- 2b4p m4(2) detached bungalow
- Hard landscaping plan
- Ev charging locations plan
- Drawing issue register
- Landscape response
- Highways response
- Conservation & design response
- Objection - eureka grange road
- Highways response
- Parish council response
- Objection - 19 willow way
- Broads drainage response
- The parish council of ludham
- The parish council of ludham
- Anglian water response
- Llfa response
- Objection - 32 willow way
- Strategic housing response
- Objection - 7 pikes nursery
- Environmental protection response
- Bng metric calc tool
- Bng condition assessment
- Bng baseline habitats plansment
- Bng statement
- Bng statement
- Bng landscape plan
- Supports - 25 reeves court hall lane
- Supports - 25 reeves court hall lane
- Copy of advert for north norfolk news for 31 july 2025
- Norfolk constabulary
- S106 heads of terms draft
- Accessible and adaptable homes statement
- Minimum space standards
- Nutrient neutrality statement
- Bng metric calc tool
- Application form
- Great crested newt survey report
- Preliminary ecological appraisal
- Topographical survey 2 of 2
- Preliminary risk assessment report
- Geotechnical assessment report
- Accommodation schedule ludham
- Historic environment desk-based assessment
- Arotherm plustech data sheet for ashp
- Transport note
- Site access arrangement ludham
- Landscape specification & maintenance plan
- Soft landscaping - planting
- Arboricultural impact assessment
- Statutory biodiversity metric condition assessments
- Bng baseline plan
- Biodiversity net gain statement
- Habitat management and monitoring plan
- Reptile survey report
- Flood risk assessment and drainage strategy
- Statement of community involvement
- 1b2p m42 maisonettes
- 1b2p m42 semi detached house
- 1b2p m42 terrace house
- 2b4p m42 detached bungalow
- 2b4p m42 semi detached bungalow
- 2b4p m42 semi detached corner house
- 2b4p terrace corner house
- 3b5p m42 semi detached house
- 4b6p detached house
- 2b4p semi detached corner house
- 3b5p detached house
- 3b5p semi detached house
- Location plan
- Accommodation plan
- Site plan
- Boundary treatment plan
- Refuse strategy plan
- Water butt locations plan
- Ev charging locations plan
- Hard landscaping plan
- Materials plan
- Street scene aa
- Street scene bb
- Design and access statement_compressed
- Drawing issue register
- Planning statement
- Topographical survey 1 of 2
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North Norfolk granted permission on 13 October 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on North Norfolk's portal will say. Our guide explains the common types.